GovChime
Notice ID: cb50e2fa4a834f70ae4c1e2e5c33b07cSolicitation

Littcarr Campground Bridge Slope Protection at Carr Creek Lake, Kentucky

Archived on September 1, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−04:00
Posted
August 3, 2023
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238910: Site Preparation Contractors
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST LOUISVILLE
Place of performance
Sassafras, 41759
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912QR23Q0098
Notice ID
cb50e2fa4a834f70ae4c1e2e5c33b07c

Description

The contractor shall furnish all personnel, equipment, supplies and materials necessary to place slope protection (Class III Rip Rap) rock on both upstream and downstream slopes and underneath each side of the Littcarr Campground bridge located at Carr Creek Lake, Sassafras, Kentucky. Prices should include mobilization & demobilization, fuel, labor, material, and equipment. The contractor will not start work until after Winter Drawn Down, 1 December, elevation 1,017 above mean sea level (AMSL). The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. LINE ITEM 0001: Littcarr Campground Bridge Abutment. Westside Bridge Abutment: 1) The contractor will place Class III Channel Liner stone from the north edge of the bridge approximately sixty five feet (65’) upstream and approximately fifteen feet (15’) from Elevation 1,017 above mean sea level (AMSL) up the embankment to Elevation 1,028.5 AMSL. Total depth of the Class III channel Liner will be at a minimum of twenty four inches (24”). 2) The contractor will place Class III Channel Liner stone from the south edge of the bridge approximately seventy feet (70’) downstream and approximately fifteen feet (15’) from Elevation 1,017 above mean sea level (AMSL) up the embankment to Elevation 1,028.5 AMSL. Total depth of the Class III channel Liner will be at a minimum of twenty four inches (24”). 3) The contractor will place Class III Channel Liner stone underneath the bridge from elevation 1,017 AMSL to bridge abutment. Total depth of the Class III channel Liner will be at a minimum of twenty four inches (24”) where applicable. LINE ITEM 0002: Littcarr Campground Bridge Abutment. Eastside Bridge Abutment: 1) The contractor will place Class III Channel Liner stone from the north edge of the bridge approximately thirty five feet (35’) upstream and approximately fifteen feet (15’) from Elevation 1,017 above mean sea level (AMSL) up the embankment to Elevation 1,028.5 AMSL. Total depth of the Class III channel Liner will be at a minimum of twenty four inches (24”). 2) The contractor will place Class III Channel Liner stone from the south edge of the bridge approximately forty feet (40’) downstream and approximately fifteen feet (15’) from Elevation 1,017 above mean sea level (AMSL) up the embankment to Elevation 1,028.5 AMSL. Total depth of the Class III channel Liner will be at a minimum of twenty four inches (24”). 3) The contractor will place Class III Channel Liner stone underneath the bridge from elevation 1,017 AMSL to bridge abutment. Total depth of the Class III channel Liner will be at a minimum of twenty four inches (24”) where applicable.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912QR23Q0098
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    SolicitationCurrentAug 3, 2023

    Littcarr Campground Bridge Slope Protection at Carr Creek Lake, Kentucky

    Notice cb50e2fa4a834f70ae4c1e2e5c33b07c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912QR23Q0098

Archive Date

Sep 1, 2023

Office Address

LOUISVILLE, KY, 40202-2230