GovChime
Notice ID: 0a49039c35cc495980e7e543f58cc6aeSolicitation

Alpena ANG Hangar and Maintenance Shops, MI

Archived on September 30, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM UTC−04:00
Posted
July 24, 2023
Notice type
Solicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W072 ENDIST LOUISVILLE
Place of performance
Alpena
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912QR23R0034
Notice ID
0a49039c35cc495980e7e543f58cc6ae

Description

D/B/B Alpena ANG Aircraft Hangar and Maintenance Shops at Alpena, MI. Estimated Construction Cost is between $10,000,000 and $20,000,000. NAICS Code is 236220. Size Determination is $45M. Please note that business size in SAM is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM, the business will be considered other than a small business. This is a full and open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation. Central Contractor Registration and ORCA are available through System for Aw ard Management (SAM), available at www.sam.gov. Offerors must comply with the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM. PLEASE NOTE: SAM is completely free of charge for both registrants and users. Site Visit information for this project is available in FAR Clause 52.236-27 Alt I. Point of Contact (POC): The POC for this procurement is Contract Specialist, Jessica Moss at Jessica.K.Moss@usace.army.mil.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912QR23R0034
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Special NoticeMar 29, 2023

    Alpena ANG Hangar and Maintenance Shops, MI

    Notice 44a7ee0074a149629c910744a6659ccd on SAM.gov

  2. 2×
    Pre-SolicitationApr 5, 2023

    Alpena ANG Hangar and Maintenance Shops, MI

    Notice 2a7408d4e0d54a90af8355a9f0d53506 on SAM.gov

  3. 6×
    SolicitationCurrentMay 22, 2023

    Alpena ANG Hangar and Maintenance Shops, MI

    Notice 0a49039c35cc495980e7e543f58cc6ae on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
***Amendment 0006 posted as of 10/20. ***Amendment 0005 posted as of 10/15. ***Amendment 0004 posted as of 9/22. ***Amendment 0003 posted as of 9/17. ***Amendment 0002 posted as of 9/10. ***Amendment 0001 posted as of 9/8. This RFP is for the MATOC Contractors identified only in W912P523D0001 through W912P523D0007. AIS INFRASTRUCTURE, LLC. CMS CORPORATION GEIGER BROTHERS, INC. HOWARD W. PENCE, INC. KIEWIT INFRASTRUCTURE CO. SHIMMICK CONSTRUCTION COMPANY, INC. WSP USA ENVIRONMENT & INFRASTRUCTURE INC. Dear MATOC Contractors: Reference is made to your Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC), Numbers W912P523D0001 through W912P523D0007 to provide Design/Build Construction Services within the Great Lakes and Ohio River Division Mission Boundaries. We request you submit a price proposal for the Soo Lock Fire Alarm Modernization in Sault Sainte Marie, MI as detailed in the scope of work, drawings, and specifications posted at the System for Award Management (www.SAM.gov). All vendors must be registered in the SAM database at SAM.gov. The Request for Proposal (RFP) can be found by logging into the website as a vendor and searching for the solicitation number (W912QR-62373550). The basis for award of this task order will be based on the Lowest Evaluated Price. Factors that will be reviewed are offeror’s past performance, as found within the Contractor Performance Assessment System (CPARS), in addition to price (base plus all options). Price is considered more important than past performance. The Government will be pulling your CPARS reports and will review quality and timeliness provided on prior jobs similar in scope and magnitude in accordance with the attached scope of work. Your proposal should include a price breakdown and/or labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract. Proposals that fail to submit a price breakdown or fail to use the binding rates from your MATOC will not be considered. The Government intends to evaluate proposals and award a contract without negotiations with offerors. Proposals submitted in response to this RFP shall be good for no less than 90 calendar days. NOTE: The target ceiling for award is $4,000,000.00. The Government cannot guarantee that funding will be made available above this amount. Proposals are due no later than 11:00 AM ET on 10 September 2026. Submit your proposal electronically through the Procurement Integrated Enterprise Environment (PIEE) solicitation module. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Megan Murphy via email at Megan.R.Murphy@usace.army.mil. Payment and Performance Bonds will be required for this project. Performance and Payment Bonds are required within 10 days after the date of award. The Notice to Proceed will be issued after receipt and approval of the bonds. All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. The website to access this system is www.projnet.org and the bidder inquiry key for this specific project is: (CYF3NK-7ZP2UW). Please see ProjNet instructions included in this RFP. If you have contractual questions, please contact Megan Murphy via email at Megan.R.Murphy@usace.army.mil. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. All Offerors is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion. 1. Purpose of this Notice: This notice is to inform the list of interested firms of an active solicitation and to outline the mandatory prerequisites required to obtain the restricted solicitation package, including drawings and specifications. 2. Procedure to Obtain Restricted Solicitation Documents: Contractors requesting access to the portions of the solicitation must have an active System for Award Management (SAM) Registration in order to receive access to the documents. Step 1: Ensure your firm has an active SAM Registration. Step 2: Request access to the restricted attachments by email to the following point of contacts with your company's information: To: Megan Murphy and Pat Duggins Email: Megan.R.Murphy@usace.army.mil and Patrick.J.Duggins@usace.army.mil Subject: Verification for W912QR-62373550 Body of Email: Include your company's CAGE Code and Unique Entity Identifier (UEI). Step 3: Upon Government confirmation of your SAM registration access will be granted within PIEE.
-Solicitation10/30/2026
The purpose of this amendment is to provide the updated attachment TE-8 Sample-3 MO076 SOW, and to instruct contractors to include any assumptions used in the preparation of their estimates for each sample project within their joint scopings of their proposals. The due date will be extended to 3 April 2026.
-Solicitation04/03/2026
4 November 2026- UPDATE The Industry Day will be conducted on 8 December 2026 from 0900-1100. Doors Open at 0830. Selfridge Air National Guard Base Dining Facility (Building 164) 44875 N. Jefferson Avenue Harrison Township, MI 48045 All attendees must register to attend the Industry Day. Each company is limited to three participants. Email the name and email address of up to three participants to the following people for additional information to obtain base access. Responses should be emailed to: Michael Dixon - michael.d.dixon82.civ@army.mil, David Best - david.m.best.civ@army.mil, and Amanda Bogue - amanda.m.bogue.civ@army.mil. The 127th Wing requires an adequately sized, properly configured, environmentally safe, and energy-efficient aircraft maintenance hangar complex and maintenance shops, in support of 21 Primary Aircraft Authorization (PAA) F-15 EX aircraft. Functional areas include bay space for maintenance and fuel cell / corrosion control, general maintenance shops, administrative, training, equipment and material storage, and clean/dirty transition space as well as utility and infrastructure upgrades necessary to support construction of the complex. (see attachment for additional information and instructions for responding to this notice) This attachment includes information for planned Industry Day.
-Special Notice12/01/2026
Amendment to the Sources Sought - November 10, 2026 The following questions have been added: How do our shipping restrictions affect your pricing, schedule, and risk? How does the Jones Act impact your logistics process, if at all? If regulations did not matter, what do you recommend to make the logistics and transportation process easier for US Government requirements? How does the Balance of Payments Program impact your list of suppliers? How frequent does the logistics process directly contribute to delays or cost increases? Have you lost revenue due to logistics delays/issues that could have been addressed earlier in the procurement process? Sources Sought Announcement FMF EC B-HAC Insular Air-Naval Station Hanger Renovation & Facilities Expansion U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA) ****SOURCES SOUGHT FOR MARKET RESEARCH PURPOSES ONLY**** This announcement seeks information from industry which will be used for preliminary planning purposes. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. NO SOLICITATION, SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. 1. AGENCY: United States Army Corps of Engineers (USACE) Latin America and Caribbean District (SAA) 2. NAICS: 236220 - Commercial and Institutional Building Construction 3. PLACE OF PERFORMANCE: Insular Air-Naval Station (Estación Aeronaval Insular), San Cristobal Island, Galapagos Province, Ecuador. 4. ACQUISITION INFORMATION: The U.S. Army Corps of Engineers (USACE), Latin America and Caribbean District (SAA), is issuing this Sources Sought announcement to identify qualified, capable, and interested U.S. firms eligible to serve as prime contractors for a potential multi-phase Design-Build construction project at the Insular Air-Naval Station on San Cristóbal Island, Galápagos, Ecuador. The project is funded through Foreign Military Financing (FMF) and is subject to applicable Offshore Procurement (OSP) requirements. The anticipated acquisition will require an eligible U.S. firm to serve as the prime contractor, unless an exception or waiver is separately authorized by the appropriate approval authority. The results of this market research will inform the Government's acquisition strategy, procurement approach, assessment of U.S. contractor capabilities and interest, and evaluation of applicable OSP requirements. Limited U.S. contractor participation or competition does not, by itself, constitute approval of or establish entitlement to an OSP waiver. Any exception or waiver would require a separate determination and approval in accordance with applicable policies and procedures. Anticipated Contract Type: Firm-Fixed-Price (FFP) Design-Build (C-Contract) with a base requirement and option phases. Estimated Magnitude of Construction: $7million to $9 million Performance Period: 540 days after Notice to Proceed. Anticipated Award Date: Fiscal Year 2027 Quarter 3 In accordance with FAR 19.000(b)(1)(ii), the Procuring Contracting Officer (PCO) has elected not to apply FAR Part 19 (Small Business Programs) to this overseas procurement. Consequently, small business set-asides will not be utilized for this project in the Galapagos Islands, Ecuador. However, because this project is funded by Foreign Military Financing (FMF), standard statutory constraints require procurement from U.S. sources. All responsible U.S. sources—including both large and small business concerns—are highly encouraged to submit capabilities statements in response to this notice. The results of this market research will inform the Government's acquisition strategy, procurement approach, assessment of U.S. contractor capabilities and interest, and evaluation of applicable OSP requirements. Limited U.S. contractor participation or competition does not, by itself, constitute approval of or establish entitlement to an OSP waiver. Any exception or waiver would require a separate determination and approval in accordance with applicable policies and procedures. Foreign Military Financing (FMF) and Offshore Procurement (OSP): In accordance with Section 42(c) of the Arms Export Control Act (22 U.S.C. § 2791(c)), award is restricted to eligible U.S. firms, as an OSP determination has not been approved. The Government reserves the right to pursue an OSP determination if deemed in its best interest. U.S. prime contractors may utilize qualified local subcontractors, subject to applicable FMF and procurement requirements. 5. ANTICIPATED ACQUISITION STRATEGY: The final acquisition strategy will be determined based on the responses received from this Sources Sought notice, contractor availability, and stakeholder coordination. The Government is contemplating the following acquisition approaches: Primary Approach (Best Value Trade-Off (BVTO) Design-Build C-Contract with Options): Award a single Firm-Fixed-Price (FFP) Design-Build construction contract through a competitive Request for Proposals (RFP), utilizing a Lowest Price Technically Acceptable (LPTA) source selection approach, with options subject to funding availability. Base Requirement (Phases 1 & 2): Phase 1 – Hangar Renovation: Renovation and modernization of the existing aviation hangar to support Bell 430 rescue helicopters and Beechcraft King Air 350 aircraft. Phase 2 – Fuel Farm: Design and construction of a new fuel farm using a Design-Build-to-Budget (DB2B) approach, including demolition of the existing fuel facility. Option Package (Phase 3): Phase 3 – New Hangar: Design and construction of a new aviation hangar to support King Air 350 aircraft, exercisable based on funding availability and operational priorities. Offshore Procurement (OSP) Strategy Determination: U.S. Contractor Only Competition: If market research demonstrates sufficient interest and capability from responsible U.S. contractors capable of executing works in the Galapagos Islands, the solicitation may be restricted to U.S. firms in compliance with standard FMF guidelines. OSP Waiver / Unrestricted Competition: If responses indicate limited U.S. industry interest, severe logistical/cost premiums, or inadequate competition, USACE will utilize the findings of this market research to justify and process an FMF Offshore Procurement Waiver to allow foreign/host-nation firms to compete. 6. PROJECT DESCRIPTION: The contemplated scope consists of complete Design-Build to Budget (DB2B) services to include civil, geotechnical, structural, architectural, MEP (mechanical, electrical, plumbing), specialized fire suppression, aircraft maintenance utility integration, fuel containment/dispensing, demolition, and environmental protection compliant with both U.S. engineering standards (Unified Facilities Criteria - UFC) and host-nation Galapagos environmental regulations. The project is divided into three distinct phases of development. The Government has developed preliminary design documents to support the proposed requirements, which will serve as the basis for the contemplated Design-Build acquisition. The selected Design-Build contractor is anticipated to be responsible for completing the design and performing construction in accordance with the final contract requirements. Project Phase Phase 1 (Base) Primary Function/Facility: Existing Hangar Renovation (Supporting Bell 430 Rescue Helicopter & King Air 350) Key Technical Considerations: Design/Build (30%) documents for Renovation to the existing hanger for the Bell 430 rescue helicopter and King Air 350. Phase 2 (Base) Primary Function/Facility: New Aviation Fuel Farm & Legacy Demolition Key Technical Considerations: Design/Build (65%) documents for a new Fuel Farm and demo of the existing fuel farm Phase 3 (Option) Primary Function/Facility: New Aircraft Hangar (Supporting King Air SKA 350) Key Technical Considerations: Design/Build (65%) documents for a new Hangar for a new King Air SKA 3350 7. SOURCES SOUGHT: The purpose of this source sought is to gain knowledge of interest, capabilities and qualifications of contractors who have the capabilities to complete and perform contracts of this magnitude, and to address any questions, recommendations or concerns from Industry. The Government must ensure there is adequate competition among potential pool of responsible contractors. Prior Government contract work is not required for submitting a response under this Sources Sought announcement. The result of this market research will contribute to determining the method of procurement. 8. RESPONSES: The Capabilities Statement for this Sources Sought is not intended to be a Request for Proposal nor Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. It is to request statements regarding the company's ability to demonstrate existing-or-developed expertise and experience in relation to the areas specified herein. Any commercial brochures or currently existing marketing material may also be submitted. This synopsis is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. Respondents will not be notified of the results of the evaluation. Interested parties are requested to provide a capabilities statement addressing the following areas. Section 1: Company Information Company Name, Address, and Website Point of Contact (Name, Title, Phone, Email) CAGE Code and SAM UEI Number Business Size and Status (e.g., Small Business, Large Business) Bonding: What bonding or guarantee methods are available to your company to secure contract performance and protect downstream subcontractor/labor payments for a project located in Ecuador? Please specify if your company utilizes US Treasury-listed Surety Bonds, Ecuadorian Bank Letters of Guarantee (Carta Fianza), or Insurance-backed Guarantees (Póliza de Caución). Relevant NAICS Codes Is your company a U.S.-based firm interested in participating as the prime contractor for this project? (Yes/No) Section 2: Interest and Experience in Ecuador Please confirm your company's interest in performing a design-build construction project of this magnitude and complexity in Galapagos Province, Ecuador or similar remote area. Summary of prior construction experience in Ecuador or South America. Address our minimum operational needs of experience with: Ecuadorian construction standards (Código Ecuatoriano de la Construcción), professional licensing requirements (Colegio de Ingenieros del Ecuador / Colegio de Arquitectos del Ecuador); Local labor laws, and tax/customs processes (SENAE and SRI). Describe your firm's capability to obtain the necessary permits and licenses required for construction work in Ecuador and to comply with all applicable host nation laws and regulations. Discuss your firm's experience with international logistics, including the transportation of materials and equipment to project sites in South America. Discuss your firm’s familiarity with base security clearance procedures, host-nation military vetting, and port access protocols. Section 3: Design-Build Qualifications and Technical Capabilities Interested firms are requested to provide information demonstrating their qualifications, relevant experience, and technical capabilities to execute the proposed multi-phase Design-Build (D-B) construction project. 3.1 Design-Build Qualifications and Relevant Experience Provide a brief overview of your firm's Design-Build experience as a prime contractor. Describe your firm's proposed D-B delivery approach, including the use of in-house design capabilities, joint ventures, or partnerships with qualified U.S., Ecuadorian, or international Architect-Engineer (A-E) firms. Provide up to three (3) examples of relevant Design-Build construction projects completed within the past five (5) years. For each project, identify the project name, location, contract value, year completed, scope of work, and your firm's role as prime contractor, joint venture partner, or subcontractor. Projects involving aviation facilities, aircraft hangars, warehouses, logistics facilities, military installations, fuel systems, or construction in remote locations are particularly relevant. 3.2 Specialized Aviation Fuel Facility Experience Describe your firm's experience designing, constructing, renovating, or upgrading aviation fuel storage and distribution facilities, including: Fuel storage tanks, pumping and transfer systems, and associated piping. Secondary containment, spill prevention, and environmental protection systems. Compliance with applicable safety and technical standards, specialized testing, and commissioning. Identify whether specialized aviation fuel system work would be performed using in-house resources or qualified specialty subcontractors. 3.3 Logistics and Local Execution Capabilities Provide an overview of your firm's proposed approach to executing construction on San Cristóbal Island, Galápagos, Ecuador, addressing the following: Material Procurement and Staging: Proposed sourcing, procurement, and staging of construction materials and specialized equipment in Guayaquil, Ecuador, or other suitable locations. Maritime Transportation and Port Operations: Proposed shipping routes, port-of-entry operations, and cargo handling at Puerto Baquerizo Moreno, San Cristóbal Island, or other suitable locations, subject to applicable host-nation, port, military installation, and security requirements. On-Island Transportation: Approach for transporting heavy construction materials and equipment from the port to the project site. Local Workforce and Subcontracting: Availability of qualified local subcontractors, specialty trades, and skilled labor, including anticipated use of U.S. and local resources. Environmental and Biosecurity Requirements: Experience addressing environmental restrictions, permitting, customs, and biosecurity requirements associated with construction in remote or environmentally sensitive locations. Logistical Challenges and Risk Mitigation: Identify anticipated logistical challenges and proposed strategies to minimize cost, schedule, and execution risks. Section 4: Market Research and Acquisition Considerations The Government seeks industry feedback to evaluate the feasibility of the proposed requirements, anticipated construction costs, performance period, acquisition strategy, and potential barriers to U.S. contractor participation. 4.1 Construction Cost and Market Conditions Based on your firm's experience, is the estimated construction magnitude of $7.181 million reasonable for the proposed scope and location? If not, explain the anticipated cost differences. What major cost drivers or premiums would you anticipate for construction in the Galápagos Islands, including shipping, equipment mobilization, labor, materials, and specialized subcontractors? Identify significant market conditions, such as local labor availability, supply chain limitations, and subcontractor capacity in Ecuador, that may affect project execution. 4.2 Schedule Feasibility and Execution Risks Is the proposed 540-calendar-day period of performance achievable for the base contract requirements, considering design, procurement, permitting, mobilization, construction, testing, and commissioning? What significant technical, logistical, environmental, or regulatory risks could affect successful project execution? What schedule adjustments or risk mitigation measures would you recommend improving project feasibility? 4.3 Offshore Procurement (OSP) and U.S. Contractor Participation Considering applicable Foreign Military Financing (FMF) and Offshore Procurement (OSP) requirements, what challenges could affect your firm's ability to compete and execute the project as a U.S. prime contractor? Describe anticipated reliance on U.S. versus non-U.S. materials, equipment, labor, and subcontractors, and identify any significant cost or logistical implications. What contracting arrangements, supply chain strategies, or industry partnerships would your firm consider supporting compliance with applicable OSP requirements? Responses will support the Government's market research and assessment of applicable procurement requirements. Any OSP exception or waiver would require a separate determination and approval by the appropriate authority. 4.4 Acquisition Strategy and Industry Interest What adjustments to the proposed acquisition strategy, project scope, phasing, or schedule would increase your firm's likelihood of submitting a proposal? Would your firm be interested in competing for a single Design-Build contract with a base requirement and additional optional phases? Would your firm be interested in participating in a virtual industry day to discuss the proposed requirements, project location, and anticipated acquisition strategy? 9. SUBMISSION INSTRUCTIONS: Format: Responses may be submitted in PDF or Microsoft Word format (suggested length: 3–6 pages). Brochures do not count towards this page count. Submission Deadline: Please submit your responses by 4:00 PM Atlantic Standard Time (AST) on 12 November 2026. No hard copies will be accepted. Submission Point of Contact: Please email responses directly to: Renee Booth, Contracting Officer: Meranda.R.Booth@usace.army.mil Jaclyn Yocum, Contract Specialist: Jaclyn.C.Yocum@usace.army.mil Subject Line for Replies: Market Research Response: Insular Air-Naval Station Hanger Renovation & Facilities Expansion, Galapagos Province, Ecuador - [Insert Company Name] 10. QUESTIONS: Questions regarding this Sources Sought Announcement may be directed to Contract Specialist, Jaclyn Yocum, at Jaclyn.C.Yocum@usace.army.mil AND Contracting Officer, Renee Booth, at Meranda.R.Booth@usace.army.mil. ****SOURCES SOUGHT FOR MARKET RESEARCH PURPOSES ONLY****
-Market Research11/12/2026
The U.S. Army Corps of Engineers (USACE), New York District, has a requirement for the design and construction of a new roughly 26,000 SF hangar at Lakehurst on Joint Base McGuire-Dix-Lakehurst (JBMDL). The project is anticipated to provide a permanent, secure, and efficiently configured Naval Secure Test and Research (NavSTAR) hangar to support aircraft compatibility testing at the Lakehurst test site on JBMDL. The Government is seeking industry feedback regarding the most effective means to plan, design, procure, construct, commission, and transition the new hangar. 1. NavSTAR Hangar Facility and Utility Systems New Hangar Facility: Construct a new permanent 25,172 SF footprint steel-frame hangar facility west of Bldg. 685 to support simultaneous 1-in/1-out fixed-wing carrier aircraft compatibility testing. Space includes several secure rooms that must be designed, built, and certified to the current ICD 705 standards with all appropriate secure network connections. Include a fully climate-controlled maintenance and testing bay, maintenance workshop, two (2) logistics warehouses, a payloads storage room, a security office, and dedicated support space for personnel. Ensure the facility incorporates high-performance and sustainable building design features maximizing energy efficiency in accordance with DoD Unified Facilities Criteria (UFC), federal laws, and Executive Orders to meet or exceed useful service life. Primary Power and Electrical Distribution: Provide a new 750 kW standby generator to supply emergency/backup power to the hangar facility and its secure testing operations. Provide complete primary and secondary electrical distribution systems, including transformers, apron lighting, and exterior security lighting. Integrate telecommunications infrastructure and secure communications lines directly with the existing installation network. Climate Control, Mechanical, and Fire Systems: Provide a fully climate-controlled HVAC system tailored for the maintenance/testing bay and personnel support areas, including dedicated environmental controls for secure operational zones. Provide potable water lines, sanitary sewer lines, natural gas piping, and a dedicated fire suppression system. Ensure all mechanical systems utilize life-cycle cost-effective, high-efficiency systems engineered for long-term utility-support operations. Commissioning, OMSI, and Post-Award Support: Provide complete system commissioning, cybersecurity feature testing, and operational validation. Develop and deliver Operations and Maintenance Support Information (OMSI) technical manuals to the Government. Provide Post Construction Award Services (PCAS) to support transition-to-operations. 2. Civil, Structural, and Site Infrastructure Site Preparation, Grading, and Drainage: Perform site clearing, excavation, and site preparation, including the possibility of 10,000 CY of bulk cut/fill earthwork. Implement a comprehensive storm water management facility incorporating Low Impact Development (LID) design elements to control runoff and protect local ecosystems. Foundations and Structural Systems: Construct a structural steel-frame building super-structure utilizing a built-up roofing assembly. Provide a spread footing reinforced concrete foundation engineered to mitigate local soil bearing and settlement risks. Paving and Site Access Improvements: Construct a dedicated fixed-wing taxiway to connect the hangar with the adjacent catapult system on the test runway. Construct a rotary-wing parking apron, a hangar access apron, and organizational vehicle parking. Construct dedicated concrete and asphalt access roads, including curbs, grading, and sidewalks, connecting the facility directly to the existing base road network via Deweese Road and E. Clubhouse Lake Road. 3. Utility Connections, Interfaces, and Cutover Work Existing Utility Interfaces: Connect the new facility to existing base potable water, sanitary sewer, natural gas, electrical, telecommunications, and storm water drainage networks. Confirm existing-system capacities, tie-in locations, and coordinate necessary utility outage windows with base public works. Operational Continuity & Interface Management: Coordinate all tie-in actions directly adjacent to the existing active catapult system on the test runway to ensure zero unplanned disruptions to active aircraft compatibility testing. Coordinate utility cutovers and final energization sequences with JBMDL installation operations to maintain continuous mission capabilities. 4. Security, Cybersecurity, and Site Safeguards Physical Security and Site Access: Provide dedicated physical security features in accordance with Geographic Combatant Commander policies and Unified Facilities Criteria (UFC) for DoD Minimum Antiterrorism Standards for Buildings. Construct roughly 650 LF of 8-foot industrial chain-link perimeter security fencing to establish a secure boundary. Install two (2) overhead vehicle slide gates to provide strictly controlled physical access to the secure aircraft operational apron and hangar apron areas. Cybersecurity and Secure Information Exchange: Provide robust cybersecurity features for all Facility-Related Control Systems (FRCS) in accordance with current DoD criteria. Ensure secure communications infrastructure and information systems are fully commissioned, with all technical compliance costs fully integrated under the early-stage conservative risk posture. Securely handle and store all project data, design files, and specifications in accordance with federal laws and regulations governing Controlled Unclassified Information (CUI). Estimated Acquisition Magnitude: $50,000,000.00 to $75,000,000.00
-Market Research11/12/2026

Additional Details

Solicitation Number

W912QR23R0034

Archive Date

Sep 30, 2023

Office Address

LOUISVILLE, KY, 40202-2230