Notice ID: 63c3b6b4a5f04ca2b064e0cf945f9266Solicitation
Homestead Corrosion Wash Rack Facility
Archived on August 3, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- July 10, 2023
- Notice type
- Solicitation
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST LOUISVILLE
- Place of performance
- Homestead, FL
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912QR23R0042
- Notice ID
- 63c3b6b4a5f04ca2b064e0cf945f9266
Description
Design/Bid/Build for the construction of the Corrosion Facility/Wash Rack hangar at Homestead Air Reserve Base, Florida. Estimated Construction Cost is between $10,000,000.00 and $25,000,000.00. NAICS Code is 236220. Size Determination is $39.5M. Please note that business size in SAM is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM the business will be considered other than a small business. This is a full and open procurement. In accordance with Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation. Contractors must register and complete the representation and certification requirements in the System for Award Management (SAM) database, available at https://sam.gov. PLEASE ensure your annual SAM registration is current. Offerors must comply with the requirements of 52.204-7, 52.204-8, 52.232-33, and any other representation and certification requirements in this solicitation through SAM. PLEASE NOTE: SAM is completely free of charge for both registrants and users. Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://projnet.org/projnet. Please see Section 00 21 00, ProjNet Instructions for further guidance. Please see FAR 52.236-27 ALT 1 for Site Visit Information. All days are to be considered calendar days unless otherwise noted. **Site Visit Roster is now attached.**
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Lindsay B Lawrence
Documents
No documents available.
Lifecycle
Solicitation:
W912QR23R0042- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationApr 27, 2023
Virtual Industry Day - Homestead Corrosion Wash Rack Facility
- Pre-SolicitationMay 16, 2023
Homestead Corrosion Wash Rack Facility
- 5×SolicitationCurrentJun 9, 2023
Homestead Corrosion Wash Rack Facility
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
**AM-0005 is released on 10 February 2026 JST. Follow the links below in PIEE to see the attachments. Proposal due date extended. **AM-0004 is released on 9 January 2026 JST. Follow the link to PIEE to see the attachments. All of the remaining RFI responses have been released in Projnet. Proposal due date and time remain unchanged. **AM-0003 is released on 12/17/2025. Follow the link to PIEE to see the attachments. RFI responses related to AM-0003 will be released in Projnet the following day on 12/18/2025. AM-0004 is planned for a release in the first 2-3 weeks of January of 2026. Another proposal due date extension is not anticipated, so please plan accordingly. **AM-0002 is released on 11/20/2025 JST. Follow the link to PIEE to see the attachments. RFI responses related to AM-0002 have been released in Projnet. **AM-0001 is released on 09/18/2025. Follow the link to PIEE to see the attachments. **This project is to construct a corrosion control facility for painting large-bodied aircraft. The facility consists of a single bay paint booth, single bay prep/wash hangar, and support spaces for painting and sanding operations. | 74% | Solicitation | 03/05/2026 |
Amendment 5: The purpose of this amendment is as follows: 1. Correction to description of CLIN 0016 (see 00 10 00). 2. Revised drawings/specifications (see Summary of Changes, dated 05/11/26). All other terms and conditions remain the same. | 72% | Solicitation | 05/15/2026 |
PROJECT TITLE: F35 SPECIAL ACCESS PROGRAM FACILITY (SAPF)PROJECT LOCATION: EBBING AIR NATIONAL GUARD BASE FORT SMITH ARTYPE OF CONSTRUCTION: CONSTRUCTION OF A SQUAD OPS MISSION PLANNING FACILITY PROVIDING CONTROLLED WORKSPACE FOR ICD 705 COMPLIANTSECURE FLIGHT PLANNING AND TRAINING, UNCLASSIFIED AIRCREW TRAINING AND ADMINISTRATIVE SPACE, AIRCREW FLIGHT EQUIPMENT STORAGE ANDMAINTENANCE, AND STEP DESK TO SUPPORT COMBAT CREW FUNCTIONS.PROJECT TITLE AND LOCATION: F-35 SPECIAL ACCESS PROGRAM FACILITY, AT EBBING AIR NATIONAL GUARD BASE, FORT SMITH AR | 72% | Solicitation | 02/20/2026 |
Amendment to the Sources Sought - November 10, 2026 The following questions have been added: How do our shipping restrictions affect your pricing, schedule, and risk? How does the Jones Act impact your logistics process, if at all? If regulations did not matter, what do you recommend to make the logistics and transportation process easier for US Government requirements? How does the Balance of Payments Program impact your list of suppliers? How frequent does the logistics process directly contribute to delays or cost increases? Have you lost revenue due to logistics delays/issues that could have been addressed earlier in the procurement process? Sources Sought Announcement FMF EC B-HAC Insular Air-Naval Station Hanger Renovation & Facilities Expansion U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA) ****SOURCES SOUGHT FOR MARKET RESEARCH PURPOSES ONLY**** This announcement seeks information from industry which will be used for preliminary planning purposes. No proposals are being requested or accepted with this announcement. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. NO SOLICITATION, SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. 1. AGENCY: United States Army Corps of Engineers (USACE) Latin America and Caribbean District (SAA) 2. NAICS: 236220 - Commercial and Institutional Building Construction 3. PLACE OF PERFORMANCE: Insular Air-Naval Station (Estación Aeronaval Insular), San Cristobal Island, Galapagos Province, Ecuador. 4. ACQUISITION INFORMATION: The U.S. Army Corps of Engineers (USACE), Latin America and Caribbean District (SAA), is issuing this Sources Sought announcement to identify qualified, capable, and interested U.S. firms eligible to serve as prime contractors for a potential multi-phase Design-Build construction project at the Insular Air-Naval Station on San Cristóbal Island, Galápagos, Ecuador. The project is funded through Foreign Military Financing (FMF) and is subject to applicable Offshore Procurement (OSP) requirements. The anticipated acquisition will require an eligible U.S. firm to serve as the prime contractor, unless an exception or waiver is separately authorized by the appropriate approval authority. The results of this market research will inform the Government's acquisition strategy, procurement approach, assessment of U.S. contractor capabilities and interest, and evaluation of applicable OSP requirements. Limited U.S. contractor participation or competition does not, by itself, constitute approval of or establish entitlement to an OSP waiver. Any exception or waiver would require a separate determination and approval in accordance with applicable policies and procedures. Anticipated Contract Type: Firm-Fixed-Price (FFP) Design-Build (C-Contract) with a base requirement and option phases. Estimated Magnitude of Construction: $7million to $9 million Performance Period: 540 days after Notice to Proceed. Anticipated Award Date: Fiscal Year 2027 Quarter 3 In accordance with FAR 19.000(b)(1)(ii), the Procuring Contracting Officer (PCO) has elected not to apply FAR Part 19 (Small Business Programs) to this overseas procurement. Consequently, small business set-asides will not be utilized for this project in the Galapagos Islands, Ecuador. However, because this project is funded by Foreign Military Financing (FMF), standard statutory constraints require procurement from U.S. sources. All responsible U.S. sources—including both large and small business concerns—are highly encouraged to submit capabilities statements in response to this notice. The results of this market research will inform the Government's acquisition strategy, procurement approach, assessment of U.S. contractor capabilities and interest, and evaluation of applicable OSP requirements. Limited U.S. contractor participation or competition does not, by itself, constitute approval of or establish entitlement to an OSP waiver. Any exception or waiver would require a separate determination and approval in accordance with applicable policies and procedures. Foreign Military Financing (FMF) and Offshore Procurement (OSP): In accordance with Section 42(c) of the Arms Export Control Act (22 U.S.C. § 2791(c)), award is restricted to eligible U.S. firms, as an OSP determination has not been approved. The Government reserves the right to pursue an OSP determination if deemed in its best interest. U.S. prime contractors may utilize qualified local subcontractors, subject to applicable FMF and procurement requirements. 5. ANTICIPATED ACQUISITION STRATEGY: The final acquisition strategy will be determined based on the responses received from this Sources Sought notice, contractor availability, and stakeholder coordination. The Government is contemplating the following acquisition approaches: Primary Approach (Best Value Trade-Off (BVTO) Design-Build C-Contract with Options): Award a single Firm-Fixed-Price (FFP) Design-Build construction contract through a competitive Request for Proposals (RFP), utilizing a Lowest Price Technically Acceptable (LPTA) source selection approach, with options subject to funding availability. Base Requirement (Phases 1 & 2): Phase 1 – Hangar Renovation: Renovation and modernization of the existing aviation hangar to support Bell 430 rescue helicopters and Beechcraft King Air 350 aircraft. Phase 2 – Fuel Farm: Design and construction of a new fuel farm using a Design-Build-to-Budget (DB2B) approach, including demolition of the existing fuel facility. Option Package (Phase 3): Phase 3 – New Hangar: Design and construction of a new aviation hangar to support King Air 350 aircraft, exercisable based on funding availability and operational priorities. Offshore Procurement (OSP) Strategy Determination: U.S. Contractor Only Competition: If market research demonstrates sufficient interest and capability from responsible U.S. contractors capable of executing works in the Galapagos Islands, the solicitation may be restricted to U.S. firms in compliance with standard FMF guidelines. OSP Waiver / Unrestricted Competition: If responses indicate limited U.S. industry interest, severe logistical/cost premiums, or inadequate competition, USACE will utilize the findings of this market research to justify and process an FMF Offshore Procurement Waiver to allow foreign/host-nation firms to compete. 6. PROJECT DESCRIPTION: The contemplated scope consists of complete Design-Build to Budget (DB2B) services to include civil, geotechnical, structural, architectural, MEP (mechanical, electrical, plumbing), specialized fire suppression, aircraft maintenance utility integration, fuel containment/dispensing, demolition, and environmental protection compliant with both U.S. engineering standards (Unified Facilities Criteria - UFC) and host-nation Galapagos environmental regulations. The project is divided into three distinct phases of development. The Government has developed preliminary design documents to support the proposed requirements, which will serve as the basis for the contemplated Design-Build acquisition. The selected Design-Build contractor is anticipated to be responsible for completing the design and performing construction in accordance with the final contract requirements. Project Phase Phase 1 (Base) Primary Function/Facility: Existing Hangar Renovation (Supporting Bell 430 Rescue Helicopter & King Air 350) Key Technical Considerations: Design/Build (30%) documents for Renovation to the existing hanger for the Bell 430 rescue helicopter and King Air 350. Phase 2 (Base) Primary Function/Facility: New Aviation Fuel Farm & Legacy Demolition Key Technical Considerations: Design/Build (65%) documents for a new Fuel Farm and demo of the existing fuel farm Phase 3 (Option) Primary Function/Facility: New Aircraft Hangar (Supporting King Air SKA 350) Key Technical Considerations: Design/Build (65%) documents for a new Hangar for a new King Air SKA 3350 7. SOURCES SOUGHT: The purpose of this source sought is to gain knowledge of interest, capabilities and qualifications of contractors who have the capabilities to complete and perform contracts of this magnitude, and to address any questions, recommendations or concerns from Industry. The Government must ensure there is adequate competition among potential pool of responsible contractors. Prior Government contract work is not required for submitting a response under this Sources Sought announcement. The result of this market research will contribute to determining the method of procurement. 8. RESPONSES: The Capabilities Statement for this Sources Sought is not intended to be a Request for Proposal nor Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach. It is to request statements regarding the company's ability to demonstrate existing-or-developed expertise and experience in relation to the areas specified herein. Any commercial brochures or currently existing marketing material may also be submitted. This synopsis is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. Respondents will not be notified of the results of the evaluation. Interested parties are requested to provide a capabilities statement addressing the following areas. Section 1: Company Information Company Name, Address, and Website Point of Contact (Name, Title, Phone, Email) CAGE Code and SAM UEI Number Business Size and Status (e.g., Small Business, Large Business) Bonding: What bonding or guarantee methods are available to your company to secure contract performance and protect downstream subcontractor/labor payments for a project located in Ecuador? Please specify if your company utilizes US Treasury-listed Surety Bonds, Ecuadorian Bank Letters of Guarantee (Carta Fianza), or Insurance-backed Guarantees (Póliza de Caución). Relevant NAICS Codes Is your company a U.S.-based firm interested in participating as the prime contractor for this project? (Yes/No) Section 2: Interest and Experience in Ecuador Please confirm your company's interest in performing a design-build construction project of this magnitude and complexity in Galapagos Province, Ecuador or similar remote area. Summary of prior construction experience in Ecuador or South America. Address our minimum operational needs of experience with: Ecuadorian construction standards (Código Ecuatoriano de la Construcción), professional licensing requirements (Colegio de Ingenieros del Ecuador / Colegio de Arquitectos del Ecuador); Local labor laws, and tax/customs processes (SENAE and SRI). Describe your firm's capability to obtain the necessary permits and licenses required for construction work in Ecuador and to comply with all applicable host nation laws and regulations. Discuss your firm's experience with international logistics, including the transportation of materials and equipment to project sites in South America. Discuss your firm’s familiarity with base security clearance procedures, host-nation military vetting, and port access protocols. Section 3: Design-Build Qualifications and Technical Capabilities Interested firms are requested to provide information demonstrating their qualifications, relevant experience, and technical capabilities to execute the proposed multi-phase Design-Build (D-B) construction project. 3.1 Design-Build Qualifications and Relevant Experience Provide a brief overview of your firm's Design-Build experience as a prime contractor. Describe your firm's proposed D-B delivery approach, including the use of in-house design capabilities, joint ventures, or partnerships with qualified U.S., Ecuadorian, or international Architect-Engineer (A-E) firms. Provide up to three (3) examples of relevant Design-Build construction projects completed within the past five (5) years. For each project, identify the project name, location, contract value, year completed, scope of work, and your firm's role as prime contractor, joint venture partner, or subcontractor. Projects involving aviation facilities, aircraft hangars, warehouses, logistics facilities, military installations, fuel systems, or construction in remote locations are particularly relevant. 3.2 Specialized Aviation Fuel Facility Experience Describe your firm's experience designing, constructing, renovating, or upgrading aviation fuel storage and distribution facilities, including: Fuel storage tanks, pumping and transfer systems, and associated piping. Secondary containment, spill prevention, and environmental protection systems. Compliance with applicable safety and technical standards, specialized testing, and commissioning. Identify whether specialized aviation fuel system work would be performed using in-house resources or qualified specialty subcontractors. 3.3 Logistics and Local Execution Capabilities Provide an overview of your firm's proposed approach to executing construction on San Cristóbal Island, Galápagos, Ecuador, addressing the following: Material Procurement and Staging: Proposed sourcing, procurement, and staging of construction materials and specialized equipment in Guayaquil, Ecuador, or other suitable locations. Maritime Transportation and Port Operations: Proposed shipping routes, port-of-entry operations, and cargo handling at Puerto Baquerizo Moreno, San Cristóbal Island, or other suitable locations, subject to applicable host-nation, port, military installation, and security requirements. On-Island Transportation: Approach for transporting heavy construction materials and equipment from the port to the project site. Local Workforce and Subcontracting: Availability of qualified local subcontractors, specialty trades, and skilled labor, including anticipated use of U.S. and local resources. Environmental and Biosecurity Requirements: Experience addressing environmental restrictions, permitting, customs, and biosecurity requirements associated with construction in remote or environmentally sensitive locations. Logistical Challenges and Risk Mitigation: Identify anticipated logistical challenges and proposed strategies to minimize cost, schedule, and execution risks. Section 4: Market Research and Acquisition Considerations The Government seeks industry feedback to evaluate the feasibility of the proposed requirements, anticipated construction costs, performance period, acquisition strategy, and potential barriers to U.S. contractor participation. 4.1 Construction Cost and Market Conditions Based on your firm's experience, is the estimated construction magnitude of $7.181 million reasonable for the proposed scope and location? If not, explain the anticipated cost differences. What major cost drivers or premiums would you anticipate for construction in the Galápagos Islands, including shipping, equipment mobilization, labor, materials, and specialized subcontractors? Identify significant market conditions, such as local labor availability, supply chain limitations, and subcontractor capacity in Ecuador, that may affect project execution. 4.2 Schedule Feasibility and Execution Risks Is the proposed 540-calendar-day period of performance achievable for the base contract requirements, considering design, procurement, permitting, mobilization, construction, testing, and commissioning? What significant technical, logistical, environmental, or regulatory risks could affect successful project execution? What schedule adjustments or risk mitigation measures would you recommend improving project feasibility? 4.3 Offshore Procurement (OSP) and U.S. Contractor Participation Considering applicable Foreign Military Financing (FMF) and Offshore Procurement (OSP) requirements, what challenges could affect your firm's ability to compete and execute the project as a U.S. prime contractor? Describe anticipated reliance on U.S. versus non-U.S. materials, equipment, labor, and subcontractors, and identify any significant cost or logistical implications. What contracting arrangements, supply chain strategies, or industry partnerships would your firm consider supporting compliance with applicable OSP requirements? Responses will support the Government's market research and assessment of applicable procurement requirements. Any OSP exception or waiver would require a separate determination and approval by the appropriate authority. 4.4 Acquisition Strategy and Industry Interest What adjustments to the proposed acquisition strategy, project scope, phasing, or schedule would increase your firm's likelihood of submitting a proposal? Would your firm be interested in competing for a single Design-Build contract with a base requirement and additional optional phases? Would your firm be interested in participating in a virtual industry day to discuss the proposed requirements, project location, and anticipated acquisition strategy? 9. SUBMISSION INSTRUCTIONS: Format: Responses may be submitted in PDF or Microsoft Word format (suggested length: 3–6 pages). Brochures do not count towards this page count. Submission Deadline: Please submit your responses by 4:00 PM Atlantic Standard Time (AST) on 12 November 2026. No hard copies will be accepted. Submission Point of Contact: Please email responses directly to: Renee Booth, Contracting Officer: Meranda.R.Booth@usace.army.mil Jaclyn Yocum, Contract Specialist: Jaclyn.C.Yocum@usace.army.mil Subject Line for Replies: Market Research Response: Insular Air-Naval Station Hanger Renovation & Facilities Expansion, Galapagos Province, Ecuador - [Insert Company Name] 10. QUESTIONS: Questions regarding this Sources Sought Announcement may be directed to Contract Specialist, Jaclyn Yocum, at Jaclyn.C.Yocum@usace.army.mil AND Contracting Officer, Renee Booth, at Meranda.R.Booth@usace.army.mil. ****SOURCES SOUGHT FOR MARKET RESEARCH PURPOSES ONLY**** | 68% | Market Research | 11/12/2026 |
This Presolicitation notice is for the FY25 PN86433 Missile Munitions Distribution Facility and will be solicited as an unrestricted, Design Bid Build (DBB), anticipating a FAR part 15 Lowest Price Technically Acceptable approach or highest technically rated with a fair and reasonable price approach (no tradeoff), firm fixed price contract award. A PLA is going to be required. Description of Requirement: New construction of a 57,955 SF Missile Munitions Distribution Facility (MMDF) warehouse (including a 4,614 SF canopy on the inbound dock side) and associated administrative support functions. Adjacent to the MMDF is a 568 SF Vehicle Storage Building (VSB) that is used to charge and store forklifts that support the mission. Associated site development including but not limited to earthwork, BMPs, fencing, roadways and hardstand areas that support the loading and unloading of munitions are also included.The project further includes new construction of a Rail Classification Yard (RCY) consisting of approximately 8,000 LF of rail siding and a ?Suspect Track? for monitoring and inspection of compromised rail cars. Adjacent to the RCY is a 327 SF Munitions Operations Management Building (MOMB) that is used by mission personnel to complete administrative duties associated with the classification yard. Associated site development including but not limited to earthwork, culvert extensions, and unpaved roadways and rail beds are also required and incidental related work. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. All responsible sources may submit a proposal in response to solicitation when posted. This project is located at Letterkenny Army Depot. Solicatation is anticipated by March 9, 2026. | 66% | Pre-Solicitation | Open |
Additional Details
Solicitation Number
W912QR23R0042
Archive Date
Aug 3, 2023
Office Address
LOUISVILLE, KY, 40202-2230