GovChime
Notice ID: 5f59aaff73eb46668463aec58a6cf698Solicitation

W912QR26QA091 West Fork Lake Crack Fill and Seal

Responses closed . Full description on SAM.gov.

Overview

Response deadline
2:00 PM EDT
Posted
August 18, 2026
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912QR26QA091
Notice ID
5f59aaff73eb46668463aec58a6cf698

Description

This Solicitation is for the Contractor to provide all materials, equipment, PPE and labor to fill crack and apply sealant on the West Fork Lake Dam Access Road asphalt. The Contractor will fill all cracks and apply sealant along approximately 22,000 Square Feet of the Dam Access Road, clean out cracks of all vegetation and debris and apply a hot crack filling material designed for roadway crack filling along the roadway. All work shall be performed in accordance with the solicitation, provided Scope of Work, drawings and photos. Note: Options are included in this Solicitation. Quotes are due on 03 September 2026 at 1:00 PM Eastern Time. NOTE: THIS RFQ IS 100% SET ASIDE FOR SMALL BUSINESS. The NAICS code for this procurement is 237990. The size standard is $45M. The solicitation will be available on the web only. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can view, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Federal Business Opportunities. Amendments will be available from the beta.sam.gov website by download only. Prior to submission of quotes all contractors must have an active registration in the System for Award Management (SAM) database. To register or update information go to http://www.SAM.gov. Questions may be addressed to ProjNet. This announcement serves as the advance notice.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1SolicitationCurrent

    W912QR26QA091 West Fork Lake Crack Fill and Seal

    Notice 5f59aaff73eb46668463aec58a6cf698 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Special Instructions:This Request for Quote (RFQ) is for the contractor to perform the construction of a Floating Courtesy Dock, Walkway and Access at Smith Ridge Boat Ramp, Green River Lake, in accordance with the attached Scope of Work (SOW). The contractor shall furnish all materials, supplies, tools, parts, equipment, transportation, labor, supervision, communication, and quality control to complete the work listed below, at the areas specified at Green River Lake, located in Campbellsville KY 42718. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. The Contractor shall begin work within 10 calendar days of Notice to Proceed (NTP). The Period of Performance for this work is 120 business days after receiving the NTP. One award will be made with this Solicitation. Note: Bid Bonds/ Pay bonds are required. Location: Green River Lake 544 Lake Road Campbellsville, KY 42718This procurement is 100% set-aside for Small Business, NAICS 237990(Size Determination $45M). Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. Note: The contract award will be based on Lowest Price to the Government. A site visit is HIGHLY ENCOURAGED for the contractor to assess quantities, critical dimensions, and work conditions. All work will be done according to standard industry practices. Access to the work area is controlled and appointments to look at the site shall be coordinated with the Technical Representative Quotes are due on 21 September 2026 at 10:00 AM Eastern Time. Electronic submittal will be accepted. You must submit your quote through PIEE (directions are attached). Fax, telephones, or mailed submittals will not be accepted. Technical questions pertaining to this project shall be posted to ProjNet per the instructions incorporated into the solicitation. Contractors are NOT to contact the TPOCs listed until an award has been made. All questions must be submitted via ProjNet at least 5 days prior to solicitation due date.**ALERT: All contractors must be registered in the System for Award Management (www.SAM.gov) prior to contractors submission. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer System for Award Management, which indicates All payments by the Government under this contract shall be made by electronic funds transfer (EFT).Those not currently registered can obtain registration by going to the website http://www.SAM.gov. Effective June 29, 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier. The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.SAM.gov). PLEASE NOTE: SAM is completely free of charge for both registrants and users. Note: Page numbering in this document may not be accurate.
-Solicitation09/21/2026
This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SPECIAL NOTICE. Respondents will not be notified of the results of the evaluation. This is a SAVE-THE-DATE special notice for an industry day event on 07 December 2026 at 10:00 AM EST. All interested Offerors are required to access SAM.gov for future updates. Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses. This event will provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2027 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $45 million Price Target Range: $25 - $50 million Estimated Period of Performance: 730 calendar days Project Background Project Title: St. Lucie South Jetty Rehabilitation Interagency, Martin County, Florida. Project Description: The work consists of rehabilitation of the head structure of the South Jetty at St. Lucie Inlet. This includes a rebuilt rounded head structure and head-to-trunk transition with a marine mattress foundation and toe protection stones. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking. The reworking of existing stones is only for incorporation of new stone. The retrieval of existing stone outside of the design template will not be required and is not part of the necessary rework of existing stone. The originally constructed South Jetty is approximately 1,320 feet in length with a crest height of 5.5 feet NAVD88. The crest width is 10 feet and the north and south slopes of the structure slope at 1V:2H. There is an asphalt walkway approximately 1,090 feet in length that runs along the existing jetty crest, terminating eastward at approximately Station 12+00 as shown on the approved permit drawings. Manipulation of stone along the crest may be necessary while completing the required work along the side slopes. The asphalt walkway will need to be removed within the repair area as necessary as work progresses. Any asphalt sections removed, or damaged such that they need to be removed, must be transported and properly disposed of off-site, and will not need to be replaced. Project Information Scope of Work: The proposed work includes rehabilitation of the head of the south jetty structure (the seaward-most 400 to 500 feet) by restabilizing the structure foundation and placing a second layer of large armor stone. The proposed scope includes: Excavating the existing bed material to place a widened marine mattress foundation, expanding the current structure footprint up to 85 feet on the jetty centerline as shown on the approved permit drawings; Placing 9- to 15-ton toe protection stones to form the structure foundation and provide scour protection; Removing and disposing of the remaining asphalt walkway and other debris off-site; Repairing the existing core and reworking the single layer of armor stone, as needed; and, Placing a second layer of 9- to 15-ton armor stone to stabilize the structure. Overview of Construction Staging and Access Requirements: Clearing of access routes and staging areas may be required. Any areas that are disturbed during construction are to be restored to pre-construction conditions or better once jetty rehabilitation work is completed. Expansion and/or improvements of access routes may be required. Maximum limits of access routes and staging areas are shown on the approved permit drawings. Additional Environmental Considerations: Construction will be permitted all year round and confined to daylight hours only. Construction that occurs during turtle and shorebird nesting seasons or has the potential to impact other Endangered Species Act (ESA) Protected Species, is subject to environmental restrictions and monitoring requirements. Refer to Table 1 under the Attachments for a list of protected species. Access from the water is allowed, but material cannot be dredged outside of the construction limits. All material excavated must pass through a 2-inch screen prior to use as backfill around the jetty structure or on the beach. All screened material must be disposed of off site. Excavated material may be used to build up the east staging area within the limits shown on the approved permit drawings. After jetty rehabilitation work is complete, the staging area must be graded to the beach fill template and native vegetation restored as shown on the approved permit drawings. Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: Company/Contractor name, address, point of contact, phone number and e-mail address. Does the Contractor plan to submit a proposal for this contract? Describe the proposed construction methods and equipment needed to rehabilitate the jetty. Address, at a minimum, excavation of existing grade, maintaining open excavation areas, debris removal, and installation of marine mattresses and armor stone. Would temporary earth-retention or water-control measures, such as a cofferdam or similar system, be required to complete the work? Would dewatering be completed if this is the proposed construction methodology? If a cofferdam or other earth-retention system that also excludes all swimming ESA-listed species is not proposed, describe the measures that would be used to prevent the swimming ESA-listed species from entering the active work area during construction, including proposed turtle deterrent measures. ESA-listed species present in the area are included in Table 1 under the Attachments. Describe the turbidity control measures that would be incorporated into the proposed construction methodology. If it is not feasible, describe the limitation or restrictions for why not. What safety constraints or hazards could limit the practicality of potential construction methods? What temporary protections or operational measures would be needed to perform the work during winter months, given the inlet’s elevated coastal conditions during that period? Event Date: Monday, 07 December 2026 at 10:00 AM EST Event Location: 2401 SE Monterey Rd, Stuart, FL 34996 *Everyone will need to have a driver's license or id to get through security. Contact Info: Jim LaGrone, Project Manager James.W.Lagrone@usace.army.mil 904-521-2086 If you cannot attend in person: Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: 993 391 786 289 Passcode: kR3Zt9F8 Join by phone: 601-262-2433 Phone conference ID: 450 517 165# Event Schedule: Interested parties who consider themselves qualified to perform the above project are invited to submit a capabilities statement, a response to the questionnaire on this Special Notice and any questions you have for the Government ahead of the breakout session by no later than December 04, 2026, at 1:00 PM, EST. All responses under this Special Notice shall be sent via email to Nicole Batista-Cruz at Nicole.M.Batista-Cruz@usace.army.mil, and Ruth Rodriguez at ruth.c.rodriguez@usace.army.mill. Your email subject line should be addressed as "St. Lucie South Jetty Repair Industry Day Registration (Company Name) - W912EP-27-Z-1CUE " to ensure the request is handled in a timely manner. All interested parties who consider themselves qualified to perform the above project are also invited to request a breakout session with the Government on a first come, first serve basis with the following timeslots as follows: 1300-1330 1340-1410 1420-1450 1500-1530 1540-1610 1620-1650 NOTES: DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENTIAL DATA. All responses to this Industry Day Special Notice will be evaluated and used in determining acquisition strategy. Prior Government contract work is not required for submitting a response under this Special Notice. NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE TO THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance.
-Special Notice12/07/2026
Sources Sought for St Francis Town Levee Renovation, St Francis, AR SEE ATTACHMENTS FOR MORE INFORMATON
-Market Research11/23/2026
This announcement constitutes a Source Sought Synopsis. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR BIDS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. Respondents will not be notified of the results of the evaluation. The Jacksonville District of the U.S. Army Corps of Engineers is seeking interest from prospective offerors for a potential fiscal year (FY) 2026 award of the aforementioned project. The purpose of this sources sought is to gauge interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses, as the Government must ensure there is adequate competition amongst the potential pool of responsible contractors. The proposed project will be a Firm Fixed Price (FFP) contract. The Jacksonville District anticipates the issuance of a solicitation on or about 29 June 2026. No reimbursement will be made for any costs associated with providing information in response to said sources sought or any follow-up information requested. DESCRIPTION OF WORK: The Jacksonville District of the US Army Corps of Engineers is seeking interested offerors for a project work that consists of rehabilitation of the seaward 480 linear feet of the St. Lucie South Jetty including the jetty head (located at the St. Lucie Inlet in Martin County). Work includes demolition and disposal of an existing asphalt walkway, extensive rework of existing armor stone and core stone, excavation of unclassified material to place stone-filled a marine mattress foundation, placement of core stone, placement of 9 ? 15 ton armor stone, and backfill of excavated material. Additional work includes environmental species and water quality monitoring. Dredging a barge access channel to access the site is not allowed. Environmental Conditions: The St. Lucie South Jetty is located in a dynamic marine environment. The Contractor shall be responsible for obtaining information concerning the marine work environment including rain, fog, existing depths, shoaling, scouring, wind, wave, current, and tide conditions that could influence safety and construction operations prior to submitting a proposal or bid. Material needed to perform this work will have to be barged into the project site. The Target Price Range is between $25,000,000 - $50,000,000. The anticipated period of performance for this project: The Contractor shall begin performance within 60 calendar days and complete the contract within 730 calendar days after receiving notice to proceed. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990, Other Heavy and Civil Engineering Construction. The Small Business Size Standard for this project is $45.0 million. The Synopsis citing the solicitation number will be issued on the SAM Contracting Opportunities Website: at https://sam.gov/Submission Instructions: Interested parties who consider themselves qualified to perform the work associated with the subject requirement, are invited to submit a response to this Sources Sought Notice no later than 13 April 2026, at 5:00 PM, (EDT). All responses to this Sources Sought Notice shall include the information requested in the attachment and shall be sent to Ms. Nicole Batista-Cruz, via email at Nicole.M.Batista-Cruz@usace.army.mil and Ms. Ruth Rodriguez at Ruth.C.Rodriguez@usace.army.mil. Prior Government contract work is not required for submitting a response under this sources sought synopsis.
-Market Research04/13/2026
Award from Solicitation No. W911XK26BA010 for the Sebewaing River South Levee Repairs.
-AwardedOpen

Additional Details

Solicitation Number

W912QR26QA091

Archive Date

Aug 18, 2027

Office Address

LOUISVILLE, KY, 40202-2230