Notice of Intent for Brand Name Requirement as part of ERCIP Microgrid Project at Camp Roberts, California
Archived on May 16, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- April 16, 2026
- Notice type
- Sources Sought
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION GREAT LAKES AND OHIO.ENDIST LOUISVILLE.W072 ENDIST LOUISVILLE
- Place of performance
- San Miguel, California
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912QR26RMicrogridCampRoberts
- Notice ID
- 362b61bd76e3459ea9df5c43e8507fc3
Description
The U.S. Army Corps of Engineers Louisville District (USACE) intends to issue a solicitation for the construction of the ERCIP Microgrid project at Camp Roberts, California. As part of the construction contract solicitation, USACE intends to include a sole-source brand requirement for the Schweitzer Engineering Laboratories (SEL) multifunction protective relays and power system controllers.
This is not a solicitation for the competitive proposals; however, if any interested party believes that they can meet the above requirement, they may submit a capability statement to the point of contact listed in this Special Notice. All information furnished must be in writing and must contain sufficient detail to allow USACE to determine if the interested party can meet the requirement described herein.
All responsible sources may submit a capability statement, which shall be considered by the agency. Submission must be received no later than 2:00 PM ET on 1 May 2026 to zachary.d.finn@usace.army.mil.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
Notice of Intent for Brand Name Requirement as part of ERCIP Microgrid Project at Camp Roberts, California
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
*** Amendment 0002 has been issued, extending proposals due date to 20 August 2026 at 09:00 AM PST*** ***Site Visit Sign In Sheet and Updated Wage Determinations are posted. See Amendment 0001 for details*** PROJECT TITLE: DDJC CENTRALIZED GAS AND ELECTRIC METERINGPROJECT LOCATION: TRACY, CALIFORNIATHE USACE SACRAMENTO DISTRICT (SPK) HAS A REQUIREMENT FOR DESIGN, FURNISH AND INSTALL OF THE NEW ADVANCED ELECTRIC AND NATURAL GAS METERS AND A CENTRALIZE UTILITY MONITORING STATION AT DEFENSE DISTRIBUTION DEPOT SAN JOAQUIN (DDJC) TRACY, CALIFORNIA. THIS REQUIREMENT CONSISTS PRIMARILY OF STANDARD ELECTRICAL CONSTRUCTION, CONDUIT INSTALLATION, AND THE INTEGRATION OF COMMERCIAL-OFF-THE-SHELF (COTS) METERING EQUIPMENT. THE INSTALLED COTS HARDWARE WILL POSSESS NATIVE, BUILT-IN CAPABILITIES TO OUTPUT STANDARD FORMAT DATA TO A LOCALIZED STATION, ALLOWING FACILITIES STAFF TO MONITOR ROUTINE USAGE AND VERIFY EQUIPMENT FUNCTIONALITY.NAICS: 237130SMALL BUSINESS ADMINISTRATION (SBA) SIZE STANDARD: $45 MILLIONSET-A-ASIDE: WOMEN OWNED SMALL BUSINESSES (WOSB) | - | Solicitation | 08/20/2026 |
Amendment 0004 and RFI Set #4 Posted July 27, 2026***************************Amendment 0003 and RFI Set #3 has been uploaded on July 17, 2026*****************************************************************************The purpose of Amendment 2 is to extend the proposal due date to July 31, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of Amendment 0002. Responses to RFI - Set #2 has been posted. ***********************************The purpose of Amendment 0001 is to extend the proposal due date to July 13, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of the attached amendment. Due to the number of RFIs received, the USACE is still preparing responses and responses will be posted as soon as they are available. A select number of RFIs have been posted with this Amendment. ***************************************************************************************************************************************************************************************************This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE. SEE FAR CLAUSE 52.232-18 AVAILABILITY OF FUNDS. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. All proposals will be due on June 29, 2026, at 12:00PM PDT. The specific date and time is identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals. | - | Solicitation | 07/31/2026 |
This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. The solicitation will be available on/about April 15, 2026, for viewing/downloading. All proposals will be due on/about May 15, 2026, at 12:00PM PDT. The specific date and time will be identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals. | - | Pre-Solicitation | Open |
Amendment 7- Extend proposal due date to 11/13/2026- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project | - | Solicitation | 11/13/2026 |
| - | Awarded | Open |
Additional Details
Solicitation Number
W912QR26RMicrogridCampRoberts
Archive Date
May 16, 2026
Office Address
LOUISVILLE, KY, 40202-2230