Notice ID: 1f24957e043bea51f4f385bab2a344edAward NoticeAwarded
RECOVERY--Z--Project Number# 012350 Stop Gate and Lifting Beam Paintaining and Repairs, New Bedford Hurricane Barrier, New Bedford/Fairhaven, Massachusetts
Awarded on April 27, 2010. Full description on SAM.gov.
Awarded tounder W912WJ10C0012 (source: SAM.gov award notice)• $182.0K
Overview
- Posted
- April 28, 2010
- Notice type
- Award Notice
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW ENGLAND
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 5, 2025
- Award date
- Apr 27, 2010
- Award amount (SAM.gov award notice)
- $182.0K
Identifiers
- Solicitation number
- W912WJ10B0008
- Notice ID
- 1f24957e043bea51f4f385bab2a344ed
- Award number (PIID)
- W912WJ10C0012
Description
The work of this project consists of painting and repairs for the stop gates and lifting beams at the New Bedford/Fairhaven Hurricane Barrier, Massachusetts. Specific work tasks include cleaning and painting the 35 stop gates and the three lifting beams, replacing rubber seals, seal retaining bars and bolts for all 35 gates, and replacing other miscellaneous components. Stop gates and lifting beams are stored in an area adjacent to the west side of the New Bedford Hurricane Barrier. The thirty-five stop gates are stored in stacks, with the skin side up. The three lifting beams are stored adjacent to the stacks. Upon completion of the job, the Contractor shall return the stop gates and lifting beams to their original location and configuration. All stop gates and lifting beams shall be cleaned and painted. Various components of the wheel assemblies and leaf springs shall be replaced. Structural steel cleaning, painting, and fabrication of necessary parts shall be performed by an organization experienced in work of equivalent magnitude. The Contractor shall be responsible for correctness of detailing, fabrication, and for correct fitting of new wheels, leaf springs, and gate seals. Substitution of sections or modification of connection details will not be accepted unless approved by the Contracting Officer. AISC-360-05 shall govern the work. Welding, if required, shall be in accordance with AWS D1.1. Note that all steel surfaces of the stop gates and lifting beams are coated with coal-tar epoxy. The North American Industrial Classification Code is 238290 with a size standard of $33.5M.
Award Overview
Award Number
W912WJ10C0012
Award Amount (SAM.gov award notice)
$182.0K
Award Date
Apr 27, 2010
Awardee
Original Solicitation
Notice ID: 1f24957e043bea51f4f385bab2a344ed
Posted Date: Apr 28, 2010
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Brad Schweitzer, 978-318-8022 USACE District, New England
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ10B0008- Awarded
This opportunity has been awarded.
- AwardedCurrentApr 28, 2010
RECOVERY--Z--Project Number# 012350 Stop Gate and Lifting Beam Paintaining and Repairs, New Bedford Hurricane Barrier, New Bedford/Fairhaven, Massachusetts
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912WJ10B0008
Archive Date
May 28, 2010