GovChime
Notice ID: 0dfaa34c12f7f21f7088761a81dd4cb3Award NoticeAwarded

Z--Repairs to East Jetty, Point Judith Harbor, Narragansett, RI

Awarded on December 19, 2013. Full description on SAM.gov.

Awarded tounder W912WJ14C0005 (source: SAM.gov award notice)• $627.0K

Overview

Posted
December 20, 2013
Notice type
Award Notice
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Place of performance
USACE District, New England 696 Virginia Road, Concord MA 01742-2751 US
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Dec 19, 2013
Award amount (SAM.gov award notice)
$627.0K

Identifiers

Solicitation number
W912WJ13B0018
Notice ID
0dfaa34c12f7f21f7088761a81dd4cb3
Award number (PIID)
W912WJ14C0005

Description

The U.S. Army Corps of Engineers award is for the Repairs to East Jetty, Point Judith Harbor, Narragansett, RI. The work of this project consists of repairing the East Jetty at the Point Judith Harbor of Refuge, Narragansett, Rhode Island. Repairs involve mobilization and demobilization, and the furnishing, delivery, and placement of new stone to replace stones displaced during Hurricane Sandy in October 2012, and to fill in existing gaps and low points along the jetty. The repairs shall be performed to restore the southerly portion of the East Jetty to the original profiles and cross-sections. Repairs will require substantial moving and manipulation of existing stones to obtain the required interlocking placement. Mobilization of equipment and rehabilitation of the jetty may require a combination of land and marine construction methods and resources. When work is to be performed using marine construction methods, the Contractor shall do so by using its marine plant and barges only on the channel side of the jetty. Optional bid work consists of providing a new concrete foundation for the US Coast Guard's navigation tower. The installation of the new concrete foundation will require removing, moving and manipulating existing stones to obtain the required depth for the placement of the new concrete foundation. Resetting of stones around the concrete structure shall be such that stones maintain a minimum interlocking with at least three edge surfaces having a friction contact with at least three different adjacent stones. Also optional work consists of removing the existing navigational aid structure from its base (a large stone), and setting it aside for pick up by the USCG. All existing bolts that remain in the base stone shall be cut and filed flush with the stone surface.

Full description on SAM.gov

Award Overview

Award Number

W912WJ14C0005

Award Amount (SAM.gov award notice)

$627.0K

Award Date

Dec 19, 2013

Awardee

Awardee UEI

NV8CM1XUEVG1

Original Solicitation

Notice ID: 0dfaa34c12f7f21f7088761a81dd4cb3

Posted Date: Dec 20, 2013

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

KImberly Pumyea, 978 318 8720 USACE District, New England

Documents

No documents available.

Lifecycle

Solicitation:W912WJ13B0018
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationSep 18, 2013

    Z--Repairs to the East Jetty, Point Judith Harbor of Refuge, Narragansett, Rhode Island

    Notice 81ef9d3f6609637f5cd461b1d2fafdd1 on SAM.gov

  2. SolicitationNov 13, 2013

    Z--Repairs to the East Jetty, Point Judith Harbor of Refuge, Narragansett, Rhode Island

    Notice 4dd39409f2bfd8baa099950db8668ef3 on SAM.gov

  3. AwardedCurrentDec 20, 2013

    Z--Repairs to East Jetty, Point Judith Harbor, Narragansett, RI

    Notice 0dfaa34c12f7f21f7088761a81dd4cb3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ13B0018

Archive Date

Jan 19, 2014