GovChime
Notice ID: 136bc327c4a9ada730f14af786852beeSolicitation

Y--Emergency Streambank Protection along the Connecticut River, set aside for HUBZone business contractors.

Archived on July 3, 2014. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
June 18, 2014
Notice type
Solicitation
Set-aside
HUBZone Set Aside
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Place of performance
USACE District, New England 696 Virginia Road, Concord MA 01742-2751 US
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W912WJ14B0004
Notice ID
136bc327c4a9ada730f14af786852bee

Description

The U.S. Army Corps of Engineers, New England District is issuing a PreSolicitation Notice set aside for HUBZone business contractors for Emergency Streambank Protection along the Connecticut River (THIS SOLICITATION WAS PREVIOUSLY SOLICITED UNDER SOLICITATION NUMBER W912WJ-13-B-0016). The NAICS code for this procurement is 237990. The estimated construction cost is between $1,000,000 - $5,000,000. The proposed project will restore approximately 1300 feet of riverbank along the Connecticut River in Middletown, Connecticut along the eastern side of the John S. Roth Well Field on River Road. The purpose of the project is to stabilize the shoreline, and prevent further erosion of the riverbank. The project will be constructed under the special continuing authority contained in Section 14 of the 1946 Flood Control Act (as amended). This project will be constructed in partnership with a local, non-Federal sponsor (the City of Middletown), and when completed will be turned over to the sponsor. The construction project will consist of a stone toe along the bank below the water surface which will be buried, and then a layer stone revetment leading up the slope at which point the revetment will become recessed and covered with a layer of topsoil. The stone revetment will be placed only along selected locations of the bank, leaving approximately 30% of the existing floodplain forest intact. Stone protection that will be placed along the bank immediately adjacent to the well field will rest at an approximate 1:2 Vertical to Horizontal slope, which will become embedded, and covered, with topsoil. The topsoil will then be planted with native vegetation which will extend to the crest of the slope. The upper crest of the slope will then be planted with native trees. In addition, a series of bendway weirs are planned to be placed at the base of the lower bank within the intertidal area adjacent to the flow of the river. This will not be a continuing contract. This is not a request for proposals at this time. The solicitation requirements and contract documents, including instructions for submission and the response date will be available on or about April 23, 2014. Telephonic, mailed, and faxed requests for hard copies of the solicitation will not be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid, which shall be considered by the New England District. Additional questions may be emailed to Elandria.m.cameron@usace.army.mil

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Elandria M. Cameron, 9783188051 USACE District, New England

Documents

No documents available.

Lifecycle

Solicitation:W912WJ14B0004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 8×
    Pre-SolicitationJan 24, 2014

    Y--Emergency Streambank Protection along the Connecticut River, set aside for HUBZone business contractors.

    Notice 1020bcc77466040f6e4e310e1e7646c6 on SAM.gov

  2. SolicitationCurrentJun 18, 2014

    Y--Emergency Streambank Protection along the Connecticut River, set aside for HUBZone business contractors.

    Notice 136bc327c4a9ada730f14af786852bee on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ14B0004

Archive Date

Jul 3, 2014