GovChime
Notice ID: 23c163766ae8fa1b4a612f8c08d5258eSolicitation

Z--Repairs to the East Jetty at the Block Island Harbor of Refuge, Block Island, RI.

Archived on October 24, 2014. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
August 7, 2014
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Place of performance
USACE District, New England 696 Virginia Road, Concord MA 01742-2751 US
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W912WJ14B0011
Notice ID
23c163766ae8fa1b4a612f8c08d5258e

Description

The U.S. Army Corps of Engineers will be issuing an Invitation for Bids for repairs to the East Jetty at the Block Island Harbor of Refuge, Block Island, RI. The NAICS code for this procurement is 237990. The estimated construction cost is expected to range from $1,000,000.00 to $5,000,000.00. Block Island Harbor of Refuge is located on the east side of Block Island, about 13 miles southwest of Point Judith Harbor, Rhode Island, and about 25 miles southeast of Stonington Harbor, Connecticut. The Block Island Harbor of Refuge Federal Navigation Project was authorized by the Rivers and Harbors Act of July 11, 1870 and modified by Acts of August 2, 1882, August 5, 1886, June 3, 1896, and July 25, 1912. The project is scheduled to be issued on or about May 29, 2014 and work to complete the repairs is expected to take approximately 6 months. The proposed work involves repairing those sections of the East Jetty that were damaged by Hurricane Sandy in late October 2012. The work will include, but not be limited to, mobilization and demobilization, furnishing, delivery, and placement of new armor stone to replace stones displaced during Hurricane Sandy, and to fill in gaps and low points along the Jetty. The repair work will involve reconstructing the breakwater to pre-storm conditions including side slopes and crest height. Access to the Jetty will be by water since the location of the Jetty is Block Island, RI but work may be conducted from the crest of the structure or from water based marine plants. The repair work will utilize similar stone to that already existing on the Jetty including size and material. Preliminary estimates of the quantity of stone to be placed include approximately 2400 tons and the size of the stone is estimated to be 10-14 tons on the trunk of the structure and 18-22 tons on the head of the structure. Various sections of the Jetty will require quote mark dismantling quote mark prior to rebuilding with new stone so that pre-storm elevations and side slopes can be matched and the large armor stone can be properly aligned and interlocked. New stone will be brought from offsite sources and the stone will most likely be placed from the crest of the structure. Work is expected to commence just after October 1, 2014 and be completed NLT March 31, 2015. Mobilization and Demobilization of equipment and materials will require marine construction methods and resources. This is not a request for proposals at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about May 29, 2014. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at Susan.k.Dunnagan@usace.army.mil

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Susan Dunnagan, 978-318-8060 USACE District, New England

Documents

No documents available.

Lifecycle

Solicitation:W912WJ14B0011
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    Pre-SolicitationMay 1, 2014

    Z--Repairs to the East Jetty at the Block Island Harbor of Refuge, Block Island, RI.

    Notice 17e0257e087dc0778c6b156b0995b160 on SAM.gov

  2. SolicitationCurrentAug 7, 2014

    Z--Repairs to the East Jetty at the Block Island Harbor of Refuge, Block Island, RI.

    Notice 23c163766ae8fa1b4a612f8c08d5258e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SPECIAL NOTICE. Respondents will not be notified of the results of the evaluation. This is a SAVE-THE-DATE special notice for an industry day event on 07 December 2026 at 10:00 AM EST. All interested Offerors are required to access SAM.gov for future updates. Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses. This event will provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2027 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $45 million Price Target Range: $25 - $50 million Estimated Period of Performance: 730 calendar days Project Background Project Title: St. Lucie South Jetty Rehabilitation Interagency, Martin County, Florida. Project Description: The work consists of rehabilitation of the head structure of the South Jetty at St. Lucie Inlet. This includes a rebuilt rounded head structure and head-to-trunk transition with a marine mattress foundation and toe protection stones. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking. The reworking of existing stones is only for incorporation of new stone. The retrieval of existing stone outside of the design template will not be required and is not part of the necessary rework of existing stone. The originally constructed South Jetty is approximately 1,320 feet in length with a crest height of 5.5 feet NAVD88. The crest width is 10 feet and the north and south slopes of the structure slope at 1V:2H. There is an asphalt walkway approximately 1,090 feet in length that runs along the existing jetty crest, terminating eastward at approximately Station 12+00 as shown on the approved permit drawings. Manipulation of stone along the crest may be necessary while completing the required work along the side slopes. The asphalt walkway will need to be removed within the repair area as necessary as work progresses. Any asphalt sections removed, or damaged such that they need to be removed, must be transported and properly disposed of off-site, and will not need to be replaced. Project Information Scope of Work: The proposed work includes rehabilitation of the head of the south jetty structure (the seaward-most 400 to 500 feet) by restabilizing the structure foundation and placing a second layer of large armor stone. The proposed scope includes: Excavating the existing bed material to place a widened marine mattress foundation, expanding the current structure footprint up to 85 feet on the jetty centerline as shown on the approved permit drawings; Placing 9- to 15-ton toe protection stones to form the structure foundation and provide scour protection; Removing and disposing of the remaining asphalt walkway and other debris off-site; Repairing the existing core and reworking the single layer of armor stone, as needed; and, Placing a second layer of 9- to 15-ton armor stone to stabilize the structure. Overview of Construction Staging and Access Requirements: Clearing of access routes and staging areas may be required. Any areas that are disturbed during construction are to be restored to pre-construction conditions or better once jetty rehabilitation work is completed. Expansion and/or improvements of access routes may be required. Maximum limits of access routes and staging areas are shown on the approved permit drawings. Additional Environmental Considerations: Construction will be permitted all year round and confined to daylight hours only. Construction that occurs during turtle and shorebird nesting seasons or has the potential to impact other Endangered Species Act (ESA) Protected Species, is subject to environmental restrictions and monitoring requirements. Refer to Table 1 under the Attachments for a list of protected species. Access from the water is allowed, but material cannot be dredged outside of the construction limits. All material excavated must pass through a 2-inch screen prior to use as backfill around the jetty structure or on the beach. All screened material must be disposed of off site. Excavated material may be used to build up the east staging area within the limits shown on the approved permit drawings. After jetty rehabilitation work is complete, the staging area must be graded to the beach fill template and native vegetation restored as shown on the approved permit drawings. Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: Company/Contractor name, address, point of contact, phone number and e-mail address. Does the Contractor plan to submit a proposal for this contract? Describe the proposed construction methods and equipment needed to rehabilitate the jetty. Address, at a minimum, excavation of existing grade, maintaining open excavation areas, debris removal, and installation of marine mattresses and armor stone. Would temporary earth-retention or water-control measures, such as a cofferdam or similar system, be required to complete the work? Would dewatering be completed if this is the proposed construction methodology? If a cofferdam or other earth-retention system that also excludes all swimming ESA-listed species is not proposed, describe the measures that would be used to prevent the swimming ESA-listed species from entering the active work area during construction, including proposed turtle deterrent measures. ESA-listed species present in the area are included in Table 1 under the Attachments. Describe the turbidity control measures that would be incorporated into the proposed construction methodology. If it is not feasible, describe the limitation or restrictions for why not. What safety constraints or hazards could limit the practicality of potential construction methods? What temporary protections or operational measures would be needed to perform the work during winter months, given the inlet’s elevated coastal conditions during that period? Event Date: Monday, 07 December 2026 at 10:00 AM EST Event Location: 2401 SE Monterey Rd, Stuart, FL 34996 *Everyone will need to have a driver's license or id to get through security. Contact Info: Jim LaGrone, Project Manager James.W.Lagrone@usace.army.mil 904-521-2086 If you cannot attend in person: Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: 993 391 786 289 Passcode: kR3Zt9F8 Join by phone: 601-262-2433 Phone conference ID: 450 517 165# Event Schedule: Interested parties who consider themselves qualified to perform the above project are invited to submit a capabilities statement, a response to the questionnaire on this Special Notice and any questions you have for the Government ahead of the breakout session by no later than December 04, 2026, at 1:00 PM, EST. All responses under this Special Notice shall be sent via email to Nicole Batista-Cruz at Nicole.M.Batista-Cruz@usace.army.mil, and Ruth Rodriguez at ruth.c.rodriguez@usace.army.mill. Your email subject line should be addressed as "St. Lucie South Jetty Repair Industry Day Registration (Company Name) - W912EP-27-Z-1CUE " to ensure the request is handled in a timely manner. All interested parties who consider themselves qualified to perform the above project are also invited to request a breakout session with the Government on a first come, first serve basis with the following timeslots as follows: 1300-1330 1340-1410 1420-1450 1500-1530 1540-1610 1620-1650 NOTES: DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENTIAL DATA. All responses to this Industry Day Special Notice will be evaluated and used in determining acquisition strategy. Prior Government contract work is not required for submitting a response under this Special Notice. NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE TO THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance.
81%
Special Notice12/07/2026
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids on for the Bar Harbor Breakwater Repair Project, Bar Harbor, Maine. This will be an unrestricted Invitation for Bid. The NAICS code for this procurement is 237990 with a size standard of $45M. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about October 2025 with construction to begin in the spring of 2026. The anticipated period of performance is 14 months. The estimated construction cost is expected to range from $10,000,000 to $25,000,000.The Bar Harbor Breakwater extends approximately 2,500 linear feet southwest from Bald Porcupine Island and was constructed between 1889 and 1916. The final design of the breakwater consisted of a 20-ft crest at 11 ft MLLW with 1H:1V side slopes, although the crest width was only constructed to 10-ft wide. The proposed work consists of repairing two large portions and a few small areas of a rubble mound breakwater structure that has been damaged from storms since its completion in 1916.There are two (2) repairs areas plus multiple small minor repair areas. Repair Area 1 is approximately 800 feet long and Repair Area 2 is approximately 850 feet long. Repair Area 2 and the minor repair zones are optional items. Anticipated stone required for Repair Area 1 includes approximately 8,800 tons of 6-10 ton armor stone and for Repair Area 2, includes approximately 5,900 tons of 6-10 ton armor stone. The minor repair areas are isolated locations of damage that are estimated to need 2-3 new armor stones to restore the structure. The repair areas will be constructed with 1.5H:1V side slopes.The work includes mobilization and demobilization, the furnishment and delivery of stones, removal/rehandling/resetting of existing stones, and placement of armor stone for tie-in between the repair area and the existing structure. The reinforcement work will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances.Construction, stone delivery, and access will be by water. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. There are no time of year restrictions. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of Repair Area 1 are approximately 10 feet and Repair Area 2 are approximately 50 feet, and the average tidal range is approximately 11 feet. The area is subject to wave action. No spudding or anchoring into the existing structure is permitted.
79%
Solicitation12/16/2025
The work consists of rehabilitation of the South Jetty at Palm Beach Harbor. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking within the tolerances provided. Mobilization of equipment and the construction necessary to repair the jetty must be water-based and require the use of marine construction methods and equipment. Work on top of the jetty will be permitted. Land-based access to the project site will not be permitted. Rehabilitation also consists of concrete repairs to the South Jetty at Palm Beach Harbor as indicated on the drawings. Prior to work on the jetty, conduct a pre-construction benthic community survey on the jetty structure and any adjacent submerged areas that may be impacted by the Contractors operations. Complete any coral relocations required as a result of the benthic survey prior to jetty work. Field personnel conducting coral survey and transplantation activities must either be qualified relocation contractors by the Florida Fish and Wildlife Conservation Commission or must provide documentation of having successfully conducted relocation of corals in Florida. The project will have an estimated period of performance of 330 calendar days after receipt of the Notice to Proceed (NTP). The stated time is inclusive of 60 calendar days to commence work and will be divided into base work and three options as follows: The Estimated Magnitude of construction is between $1,000,000.00 and $5,000,000.00The Invitation for Bid (IFB) will be issued on or about September 23, 2026 and bids will be due on or about October 23, 2026.THIS ACQUISITION REQUIRES THE USE OF COAST GUARD-CERTIFIED EQUIPMENT, The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990, Other Heavy and Civil Engineering Construction. The Small Business Size Standard for this project is $45.0 million. Solicitation will be issued in electronic format only and will be posted on the SAM.gov website at https://sam.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Sam.gov website at https://sam.gov/. If you are not registered, the Government is not responsible with providing you with notification of any amendments to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call 866-606-8220 or visit the SAM website at https://www.sam.gov/.
75%
Solicitation10/26/2026
The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Wareham Harbor Federal Navigation Project, located in Wareham, Massachusetts. This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Wareham Harbor FNP consists of a 2.4 mile long, 9-foot deep Mean Lower Low Water (MLLW) channel. The channel is comprised of several reaches of varying widths (100-ft to 250-ft widths) to include the entrance channel through Cromeset Neck Reach, Quahaug Bar Reach, Parkwood Beach Reach, and the Inner Harbor Reach. The proposed work consists of mechanically dredging up to appropriately 52,000 cubic yards (CY) of shoaled material over a 10.2-acre area. Most of the material is fine-grained/silt and will be transported by scow and placed at Cape Cod Bay Disposal Site (CCBDS), approximately 35 miles away. Transit from Wareham to CCBDS will occur through the Cape Cod Canal. A smaller portion of the material is sand (approx. 1,000 CY) and will be placed beneficially at a nearshore site off of Church's Beach in Cuttyhunk, Massachusetts (approximately 28 miles away). Dredging operations can start on July 1, 2026 for maintenance dredging using a mechanical dredge and placement in open water at CCBDS and Church’s Beach Nearshore Placement Site. All work must be complete by December 31, 2026. In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 28,500 CY per 30 consecutive calendar day period. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-November 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://www.sam.gov/) and the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at heather.m.skorik@usace.army.mil. The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Wareham Harbor Federal Navigation Project, located in Wareham, Massachusetts. This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Wareham Harbor FNP consists of a 2.4 mile long, 9-foot deep Mean Lower Low Water (MLLW) channel. The channel is comprised of several reaches of varying widths (100-ft to 250-ft widths) to include the entrance channel through Cromeset Neck Reach, Quahaug Bar Reach, Parkwood Beach Reach, and the Inner Harbor Reach. The proposed work consists of mechanically dredging up to appropriately 52,000 cubic yards (CY) of shoaled material over a 10.2-acre area. Most of the material is fine-grained/silt and will be transported by scow and placed at Cape Cod Bay Disposal Site (CCBDS), approximately 35 miles away. Transit from Wareham to CCBDS will occur through the Cape Cod Canal. A smaller portion of the material is sand (approx. 1,000 CY) and will be placed beneficially at a nearshore site off of Church's Beach in Cuttyhunk, Massachusetts (approximately 28 miles away). Dredging operations can start on July 1, 2026 for maintenance dredging using a mechanical dredge and placement in open water at CCBDS and Church’s Beach Nearshore Placement Site. All work must be complete by December 31, 2026. In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 28,500 CY per 30 consecutive calendar day period. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-November 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://www.sam.gov/) and the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at heather.m.skorik@usace.army.mil.
74%
Pre-SolicitationOpen
Maintenance Dredging, Wareham Harbor, Wareham, MA
72%
Solicitation01/21/2026

Additional Details

Solicitation Number

W912WJ14B0011

Archive Date

Oct 24, 2014