Z--Replace existing wire rope guardrail, replace one existing anchor, and fill in two voids by bridge blocks with crushed stone at the Plymouth Harbor Breakwater in Plymouth, MA.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- June 17, 2014
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW ENGLAND
- Place of performance
- USACE New England District 696 Virginia Rd. Concord MA 01742 US
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- W912WJ14Q0082
- Notice ID
- e44849fd22cf67a0ac2cf0e1e10f9c85
Description
The work of this project involves replacing a wire rope guard rail along the entire pedestrian walk way on top of the Plymouth Harbor breakwater in Plymouth, Massachusetts (Approximately 4,000 feet). Specific work includes removal and disposal of existing wire rope and fastening hardware, and then installing a new wire rope and associated fastening hardware; in addition, one anchor needs to be replaced for one section of the guard rail, and two voids under a pedestrian bridge need to be filled with crushed stone. The voids under the pedestrian bridge are at the abutments (Bridge Blocks). The Bridge Blocks are comprised of reinforced concrete.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Jennifer Samela, 978-318-8324 USACE District, New England
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ14Q0082- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 2×Pre-SolicitationMay 11, 2014
Z--Replace existing wire rope guardrail, replace one existing anchor, and fill in two voids by bridge blocks with crushed stone at the Plymouth Harbor Breakwater in Plymouth, MA.
- SolicitationCurrentJun 17, 2014
Z--Replace existing wire rope guardrail, replace one existing anchor, and fill in two voids by bridge blocks with crushed stone at the Plymouth Harbor Breakwater in Plymouth, MA.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912WJ14Q0082
Archive Date
Jul 27, 2014