Notice ID: ee45fd6980a26a29432f663ee9086fb2Award NoticeAwarded
Green Harbor Jetty Repair
Awarded on May 17, 2018. Full description on SAM.gov.
Awarded tounder W912WJ18C0015 (source: SAM.gov award notice)• $1.0M
Overview
- Posted
- May 17, 2018
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of War
Notice details
- Place of performance
- Green Harbor Jetty, Marshfield, MA
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Sep 10, 2025
- Award date
- May 17, 2018
- Award amount (SAM.gov award notice)
- $1.0M
Identifiers
- Solicitation number
- W912WJ18B0005
- Notice ID
- ee45fd6980a26a29432f663ee9086fb2
- Award number (PIID)
- W912WJ18C0015
Description
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids for Maintenance and Repairs of the East Jetty feature of the Federal Navigation Project (FNP) in Green Harbor, Marshfield, MA. This project is set-aside for small business. The NAICS code for this procurement is 237990. The estimated construction cost is expected to range from $1,000,000.00 to $5,000,000.00. The work of this project consists of repairing a 150 foot section of the east jetty at Green Harbor in Marshfield Massachusetts. The east jetty was damaged during Winter Storm Juno in 2015 and subsequent storms. Approximately 1,200 tons of new armor stone will be required to make repairs to the landward section of the jetty. The new armor stones will vary in size from 4-7 tons. The work includes excavating, removing, stockpiling, installing and reworking existing armor stone as well as acquiring and installing new armor in the jetty repair area. The repaired area must be properly interlocked and be within specified design tolerances. The excavation and stone placement may be performed from land or water; however, new armor stones will need to be delivered via waterborne plant. Under this contract, that will include Definitive Responsibility Criterion (DRC), the successful offeror will be required to provide the equipment, personnel and materials required for the repairs to the east jetty feature of the FNP as described herein and demonstrate (per the DRC) completion of two (2) projects within the last six (6) years that involved construction or repair of a jetty, breakwater, or other stone work requiring the placement and interlocking of 7 ton stones or larger in a tidally influenced marine environment where work had to be coordinated around tide cycles. Please note this solicitation is set aside for small businesses, which means that only small business firms can submit a bid.
Award Overview
Award Number
W912WJ18C0015
Award Amount (SAM.gov award notice)
$1.0M
Award Date
May 17, 2018
Awardee
Awardee UEI
EJ39GFN7VVD7
Original Solicitation
Notice ID: ee45fd6980a26a29432f663ee9086fb2
Posted Date: May 17, 2018
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ18B0005- Combined Synopsis
- Awarded
This opportunity has been awarded.
- 7×Combined SynopsisJan 22, 2018
Green Harbor Jetty Repair, Marshfield, MA
- AwardedCurrentMay 17, 2018
Green Harbor Jetty Repair
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Isle au Haut Thoroughfare Federal Navigation Project, located between Isle au Haut, Maine and Kimball Island, Maine on the outskirts of Penobscot Bay, about six miles southeast of Stonington and 25 miles east of Rockland. The Federal Navigation Project consists of a -6-foot Mean Lower Low Water (MLLW) deep by 75-foot wide extending 1,200-foot in length through the shoal in the thoroughfare.The proposed work consists of mechanically dredging approximately 3,355 cubic yards (cy) (1,183 cy required, plus 2,172 cy overdepth) of shoaled material consisting of highly compacted coarse sand and gravel, with areas of cobbles and isolated small boulders from the channel. Due to the material type, a mechanical dredge with the ability to dig highly compacted coarse sand and gravel will be required. The proposed action is to dredge to the authorized depth of -6-foot MLLW plus an additional 1-foot of required advance maintenance with an additional allowable 1-foot of overdepth (e.g. -7-foot MLLW required + 1-foot allowable OD). One-time, advanced maintenance is approved for the entirety of the 1200-foot long authorized channel. The dredged material will be placed at the Flake Island Disposal Site (FIDS) which is approximately 1 nautical mile northwest of the FNP. Placement of the dredged material (sand, gravel and cobble) at Flake Island Disposal Site will benefit both juvenile lobster habitat and juvenile cod by increasing the areas habitat complexity.The anticipated allowable dredging window is between September 15 and April 1 to avoid impacts to spawning shellfish, benthic resources, Essential Fish Habitat (EFH) of federally managed species, threatened and endangered species and interactions with mobile fishing gear. | - | Solicitation | 11/10/2026 |
The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for the upcoming dredging project located in Providence, Rhode Island. This announcement is to determine the interest, availability and capability of Small and Large Business concerns as described below. The NAICS code for this procurement is 237990. The solicitation for this project is anticipated to be issued on or about 15 March 2027. The construction will begin in September 2027 and is expected to take approximately 2 years to complete. The estimated construction cost is between $80,000,000 and $100,000,000. The Providence River Maintenance Dredging project involves two major sequences of dredging and disposal activities. The first work sequence will be the construction of a new Confined Aquatic Disposal (CAD) cell adjacent to the Providence River. The second work sequence under this contract will include maintenance dredging of the Providence River and Harbor Federal Navigation Project (FNP) to its authorized depths and dimensions. The proposed work consists of mechanically dredging approximately 5,500,000 cubic yards (cy) of material using closed clamshell buckets for both major sequences of work over the course of two years. The new CAD cell will be in the Edgewood Basin area located adjacent to the Providence FNP (hereafter the “Edgewood Shoals North (ESN) CAD cell”). To access the CAD cell area, an access channel will be dug between the Providence FNP and the CAD cell area. The access channel will be approximately 100 ft wide and -25 MLLW deep. The CAD cell will have surface dimensions of approximately 1000 ft. by 1000 ft. and be dug to a depth of -60 MLLW. The material excavated to build the access channel is generally a mix of sandy silt and shell fragments. Within the CAD cell area the material is generally described as soft grey to black organic silt with some layers of firm sandy silt and some shell fragments and coarse-grained material. Material excavated from the access channel and CAD cell area will be placed at four locations: Port Edgewood Basin, the Fox Point Reach CAD cells, Prudence Island Disposal Site, and the Rhode Island Sound Disposal Site. This work consists of mechanically dredging approximately 3,200,000 cy to construct thew ESN CAD cell and its access channel, which must be completed before maintenance dredging of the FNP can begin. The maintenance dredging proposed work consists of mechanically dredging the Providence River FNP to the full -40 MLLW depth plus 2-feet of allowable overdepth. 2,300,000 cy (1,200,000 cy required depth, with up to 1,100,000 cy overdepth) of shoaled material consisting generally of poorly graded medium to fine sand with silt. The dredge material from this maintenance portion of work will be placed in the ESN CAD cell. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. All dredging and disposal activities for this project have prescribed work windows that incorporate environmental and recreational time of year restrictions. Refer to the Draft Specification Section provided with this announcement for specifics on the time of year work restrictions. In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 300,000 CY per 30 calendar days. The U.S. Army Corps of Engineers, New England District is requesting responses to the questions below from both small and large businesses[MC1] . Draft drawings showing a concept design plan and draft Specification Section of 01 11 00 SUMMARY OF WORK have been provided with this announcement to help provide more context for the contract work and responses to these questions. Considering the different disposal locations, are there suggestions on a bid structure that will provide for the most accurate costs of different disposal locations? Any draft restrictions that may impact dredging and/or disposal operations? Any concerns on the period of performance of September 2027 to September 2029 considering the environmental windows and amount of work? If so, why? Any comments about the bed leveling planned in the Fox Point Reach? Are there concerns about this part of the plan, if so, why? Interested firms should also demonstrate their project experience, by providing two (2) projects within the last ten years, which meet the following requirements: Dredging by mechanical means demonstrating a minimum production rate of 300,000 cubic yards in one consecutive 30-day period. Experience with placement of dredged material at an open water placement site in New England during the fall/winter months of October through March. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, etc.), type of equipment the firm is proposing to use on the project, and two (2) example projects performed by the firm in the last ten (10) years (including Points of Contact for those projects) showing experience with the proposed equipment at the production rate listed above. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications meeting the same qualifications listed above, which will be used to support the bidder's effort. Firms may use subcontractor experience to demonstrate experience with the requirements, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience shall be the same as the role for that team member for this project. Bid bond will need to be provided with the bid. Responses are limited to twenty pages and due by December 03 , 2026. Responses should be addressed to the U.S. Army Corps of Engineers, New England District, 696 Virginia Road, Concord, MA 01742-2751, ATTN: Kyle Hall, or electronically to Kyle.K.Hall@usace.army.mil. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. Government Agency URL: www.nae.usace.army.mil Government Agency URL Description: New England District, Corps of Engineers | - | Market Research | 12/03/2026 |
The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement for Construction Services for the for the repairing of the inlet pipe to the float well and replace weathered/damaged staff gauges at the Surry Moutain Lake Dam in Surry NH. This announcement is to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned and Small Business concerns for this project. The NAICS code for this procurement is 237990 with a size standard of $45M. The project is planned to be solicited in the Winter of 2026 with construction to begin place in the Summer of 2027. The estimated construction cost is between $350,000 - $500,000. The project site is the inlet culvert on the lake side of the Surry Mountain Dam in Surry, NH. Work for this project will likely include, but not be limited to, the following: Coffer dam at inlet pipe location. Float well pipe (3-inch cast iron) cleaning. Installation of internal liner for float well pipe. Pre and Post liner installation CCTV inspections. Repairs to the slash-zone pipe segment Protection and concrete encasement of the external float well pipe Staff Gauges: Pressure treated posts with attached enamel coated metal measuring strip. Scheduled work will be affected by depth of pool. Assumed low pool depths are July and August (when work can be conducted safely), but adverse weather conditions (rain events) could delay or postpone work schedules. Surry Mountain staff will keep COR informed of pool levels to anticipate when work can commence if outside assumed low pool depths. Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience in performing the work components stated above. Please include at least two specific examples of the firm’s experience performing the work requirements stated above. The projects must have been performed within the last seven years. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, which will be used to support the offeror’s effort, and their experience must also have been performed within the last seven years. Proof of bonding capability is required. Responses are limited to twenty pages. Responses are due by 23 November 2026. Responses should be emailed to: Kyle Hall – kyle.k.hall@usace.army.mil Phone Contact: (978) 318-8479 Interested firms shall provide the above documentation in one original form and one copy. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. Government Agency URL: www.nae.usace.army.mil Government Agency URL Description: New England District, Corps of Engineers | - | Market Research | 11/23/2026 |
Removal of Navigation Obstruction, Portland Harbor, Portland, ME | - | Solicitation | 06/12/2026 |
Maintenance Dredging, Wareham Harbor, Wareham, MA | - | Solicitation | 01/21/2026 |
Additional Details
Solicitation Number
W912WJ18B0005
Archive Date
Jun 1, 2018
Office Address
CONCORD, MA, 01742-2751