Notice ID: 8df22abf9dc5fc1e481f715ee560cc94Award NoticeAwarded
Spot Painting project, located at the Sawyer River #3, Sawyer River Road, White Mountain Forest in Livermore, New Hampshire
Awarded on August 8, 2018. Full description on SAM.gov.
Awarded tounder W912WJ18C0018 (source: SAM.gov award notice)• $119.3K
Overview
- Posted
- September 27, 2018
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 10, 2025
- Award date
- Aug 8, 2018
- Award amount (SAM.gov award notice)
- $119.3K
Identifiers
- Solicitation number
- W912WJ18B0012
- Notice ID
- 8df22abf9dc5fc1e481f715ee560cc94
- Award number (PIID)
- W912WJ18C0018
Description
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bid (IFB) for a Spot Painting project, located at the Sawyer River #3, Sawyer River Road, White Mountain Forest in Livermore, New Hampshire. This will be a Small Business set-aside. The NAICS code for the work is 238320. The Solicitation is planned to be issued in June 2018, and will be for a firm fixed price contract. The construction period will extend over Summer and Fall 2018. The estimated magnitude of this project is between $100,000 and $250,000. Contractor should note that work on this project will require fall protection. The Sawyer River Bridge #3 is approximately 15 feet above the underlying stream bed. No traffic control is necessary, as this bridge is not open to the public. This project consists of the following components: -Construct a suspended work platform underneath the bridge, or construct scaffolding resting on the stream bed to access substructure components. Use of a snooper truck is impracticable. -Use solvents to clean the surfaces to receive paint. -Use a chipping hammer or wire brush to break up and remove failed paint in localized spots only. No scraping of the existing coating system will be permitted due to the presence of lead. The percent of failed paint to be removed and re-painted is estimated to be about 40% of the total surface area of the bridge components. The bridge has a timber driving surface and side rails. Components needing spot painting include the substructure only. -Apply primer and top coats of paint to the places where the paint has failed only. This is not a request for bids at this time; the solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about June 2018. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at Jessica.R.Loc@usace.army.mil.
Award Overview
Award Number
W912WJ18C0018
Award Amount (SAM.gov award notice)
$119.3K
Award Date
Aug 8, 2018
Awardee
Awardee UEI
Y73BEKCNHJP8
Original Solicitation
Notice ID: 8df22abf9dc5fc1e481f715ee560cc94
Posted Date: Sep 27, 2018
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ18B0012- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 6×Pre-SolicitationMay 4, 2018
Spot Painting project, located at the Sawyer River #3, Sawyer River Road, White Mountain Forest in Livermore, New Hampshire
- SolicitationJul 18, 2018
Spot Painting project, located at the Sawyer River #3, Sawyer River Road, White Mountain Forest in Livermore, New Hampshire
- AwardedCurrentSep 27, 2018
Spot Painting project, located at the Sawyer River #3, Sawyer River Road, White Mountain Forest in Livermore, New Hampshire
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912WJ18B0012
Archive Date
Oct 5, 2018
Office Address
CONCORD, MA, 01742-2751