Notice ID: 6aa7f20cb1f48ccc4c6f6e29728f1d89Award NoticeAwarded
New Water Distribution System in Durham and Middletown, Connecticut
Awarded on November 26, 2018. Full description on SAM.gov.
Awarded tounder W912WJ19C0002 (source: SAM.gov award notice)• $30.2M
Overview
- Posted
- November 27, 2018
- Notice type
- Award Notice
- Agency
- Department of War
Notice details
- Place of performance
- Durham, CT, 06422
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 4, 2025
- Award date
- Nov 26, 2018
- Award amount (SAM.gov award notice)
- $30.2M
Identifiers
- Solicitation number
- W912WJ18B0016
- Notice ID
- 6aa7f20cb1f48ccc4c6f6e29728f1d89
- Award number (PIID)
- W912WJ19C0002
Description
The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for a project in Durham and Middletown, Connecticut. This project is to install a new water distribution system in Durham while using the existing water distribution system in Middletown for its water source. This procurement will be a small business set-aside only. The NAICS code for the work is 237110 with a size standard of $36,500,000. This project is scheduled to be awarded before the end of fiscal year 2018 with construction completion in 2021. The estimated construction cost is between $10 to $30 million. The proposed project includes approximately 31,000 linear feet of 6" through 16" ductile iron water mains; an 880,000 gallon pre-stressed concrete water storage tank with new access road; hydrants, valves, tees and other fittings; service connections to approximately 200 buildings; two blow-off valve assemblies; three vaults for an altitude valve, a water meter, and a pressure reducing valve; modifications to the existing Long Hill Pump Station in Middletown; site work including blasting, storm drains, and paving; and abandonment of approximately 110 private drinking wells. The Government anticipates including two definitive responsibility criteria in the solicitation. In addition to examining the criteria in FAR 9.104-1, the Contracting Officer will also examine whether the low bidder can meet the following experience requirements: 1. A project completed within the past seven years that involved construction of a new water line of greater than $5 million that included at least 50 service connections. 2. A project completed within the past seven years that involved construction of a new water storage tank with capacity of at least 500,000 gallons. The Contracting Officer will verify that the submitted projects meet the definitive responsibility criteria as part of the responsibility determination. Bidders are not required to submit additional documentation related to these criteria at the time of bid. The bidder anticipated to receive will be required to submit documentation of the experience in the definitive responsibility criteria within 3 business days of bid opening. The solicitation is now available. The bid opening date will be stated in the solicitation. Please note this solicitation will be a small business set-aside. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid which shall be considered by the New England District. Any additional questions may be emailed to the Contract Specialist at Alysha.MacDonald@usace.army.mil.
Award Overview
Award Number
W912WJ19C0002
Award Amount (SAM.gov award notice)
$30.2M
Award Date
Nov 26, 2018
Awardee
Awardee UEI
F41UKHQ8SN15
Original Solicitation
Notice ID: 6aa7f20cb1f48ccc4c6f6e29728f1d89
Posted Date: Nov 27, 2018
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ18B0016- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 10×Pre-SolicitationApr 17, 2018
New Water Distribution System in Durham and Middletown, Connecticut
- SolicitationAug 23, 2018
New Water Distribution System in Durham and Middletown, Connecticut
- AwardedCurrentNov 27, 2018
New Water Distribution System in Durham and Middletown, Connecticut
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912WJ18B0016
Archive Date
Dec 11, 2018
Office Address