GovChime
Notice ID: 6aa7f20cb1f48ccc4c6f6e29728f1d89Award NoticeAwarded

New Water Distribution System in Durham and Middletown, Connecticut

Awarded on November 26, 2018. Full description on SAM.gov.

Awarded tounder W912WJ19C0002 (source: SAM.gov award notice)• $30.2M

Overview

Posted
November 27, 2018
Notice type
Award Notice

Notice details

Place of performance
Durham, CT, 06422
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 4, 2025
Award date
Nov 26, 2018
Award amount (SAM.gov award notice)
$30.2M

Identifiers

Solicitation number
W912WJ18B0016
Notice ID
6aa7f20cb1f48ccc4c6f6e29728f1d89
Award number (PIID)
W912WJ19C0002

Description

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for a project in Durham and Middletown, Connecticut. This project is to install a new water distribution system in Durham while using the existing water distribution system in Middletown for its water source. This procurement will be a small business set-aside only. The NAICS code for the work is 237110 with a size standard of $36,500,000. This project is scheduled to be awarded before the end of fiscal year 2018 with construction completion in 2021. The estimated construction cost is between $10 to $30 million. The proposed project includes approximately 31,000 linear feet of 6" through 16" ductile iron water mains; an 880,000 gallon pre-stressed concrete water storage tank with new access road; hydrants, valves, tees and other fittings; service connections to approximately 200 buildings; two blow-off valve assemblies; three vaults for an altitude valve, a water meter, and a pressure reducing valve; modifications to the existing Long Hill Pump Station in Middletown; site work including blasting, storm drains, and paving; and abandonment of approximately 110 private drinking wells. The Government anticipates including two definitive responsibility criteria in the solicitation. In addition to examining the criteria in FAR 9.104-1, the Contracting Officer will also examine whether the low bidder can meet the following experience requirements: 1. A project completed within the past seven years that involved construction of a new water line of greater than $5 million that included at least 50 service connections. 2. A project completed within the past seven years that involved construction of a new water storage tank with capacity of at least 500,000 gallons. The Contracting Officer will verify that the submitted projects meet the definitive responsibility criteria as part of the responsibility determination. Bidders are not required to submit additional documentation related to these criteria at the time of bid. The bidder anticipated to receive will be required to submit documentation of the experience in the definitive responsibility criteria within 3 business days of bid opening. The solicitation is now available. The bid opening date will be stated in the solicitation. Please note this solicitation will be a small business set-aside. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the Federal Business Opportunities website (www.fbo.gov). All responsible sources may submit a bid which shall be considered by the New England District. Any additional questions may be emailed to the Contract Specialist at Alysha.MacDonald@usace.army.mil.

Full description on SAM.gov

Award Overview

Award Number

W912WJ19C0002

Award Amount (SAM.gov award notice)

$30.2M

Award Date

Nov 26, 2018

Awardee

Awardee UEI

F41UKHQ8SN15

Original Solicitation

Notice ID: 6aa7f20cb1f48ccc4c6f6e29728f1d89

Posted Date: Nov 27, 2018

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912WJ18B0016
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 10×
    Pre-SolicitationApr 17, 2018

    New Water Distribution System in Durham and Middletown, Connecticut

    Notice 9def343f25310f6bf8f07928c23dafde on SAM.gov

  2. SolicitationAug 23, 2018

    New Water Distribution System in Durham and Middletown, Connecticut

    Notice 81292f53a6a5b7469b03d509db986603 on SAM.gov

  3. AwardedCurrentNov 27, 2018

    New Water Distribution System in Durham and Middletown, Connecticut

    Notice 6aa7f20cb1f48ccc4c6f6e29728f1d89 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ18B0016

Archive Date

Dec 11, 2018

Office Address

CONCORD, MA, 01742-2751