GovChime
Notice ID: 4fda71c0935f42589f09cfe223967c6cSolicitation

DESIGN-BUILD VANDENBERG GATE COMPLEX

Archived on July 22, 2020. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
June 29, 2020
Notice type
Solicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Place of performance
Hanscom Air Force Base, Bedford, MA, 01730
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W912WJ20R0001
Notice ID
4fda71c0935f42589f09cfe223967c6c

Description

The existing main entrance gate to Hanscom Air Force Base (AFB), located on the west side of the installation, operates as the installations primary entrance/access point for military personnel, commercial contractors and other base visitors. The existing entrance is not in compliance with current Anti-Terrorism (AT) requirements and experiences significant congestion due to high traffic volumes. As a result, Hanscom AFB requires the construction of a new access control facility, known as the Vandenberg Gate Complex, to bring the main gate entrance up to current AT standards and to improve overall traffic flow into the installation. This project will be designed as permanent construction in accordance with UFC 1-200-01, General Building Requirements, UFC 1-200-02, High Performance & Sustainable Building Requirements and UFC 4-010- 01Minimum Antiterrorism Standards for Buildings. The Vandenberg Gate Complex shall meet the current Anti- Terrorism/Force Protection standards IAW UFC 4-022-01 Entry Control Security Engineering, UFC 4-010-02 DoD Minimum Anti-terrorism Standoff Distances for Buildings, and UFC 4-022-02 Selection and Application of Vehicle Barriers.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912WJ20R0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 5×
    Pre-SolicitationSep 17, 2019

    DESIGN-BUILD VANDENBERG GATE COMPLEX

    Notice 901bca6ebe86475d820587032a1bd780 on SAM.gov

  2. 4×
    SolicitationCurrentApr 30, 2020

    DESIGN-BUILD VANDENBERG GATE COMPLEX

    Notice 4fda71c0935f42589f09cfe223967c6c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction.
-Solicitation11/20/2026
The U.S. Army Corps of Engineers, New England District is issuing this Request for Qualifications for the Demolition and Construction of Thayer Hall at the United States Military Academy, West Point, New York. This project will be executed as a Construction Manager at Risk (CMAR) Other Transaction Agreement (OTA) under the statutory authority of 10 U.S.C. 2808a, Facility Construction or Repair. This approach will involve the general contractor during the design phase to provide feedback and input to the designer of record and the government on constructability, operability, cost, and value engineering on the design being developed.
-Solicitation09/24/2026
The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for the New Project Office at the East Brimfield Lake Dam in Fiskdale, Massachusetts. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 236220 with a size standard of $45M. The project is planned to be issued in June 2026 and will be set aside for Small Businesses. The period of performance will be approximately 365 days. The estimated magnitude of this project is between $1,500,000 and $3,500,000The work of this project involves the demolition of two existing out-buildings (which will include lead paint abatement), and the construction of a new one-story wood framed project office building with a pitched roof. The building consists of offices, kitchen, restroom, reception spaces and an attached two-bay garage.The project includes the redevelopment and expansion of the existing paved area to provide additional parking spaces, and improvements to accessible access to the building.The work will also include all necessary utility and earthwork, such as, but not limited to excavation, filling, backfilling, trenching, compaction, and grading; placing topsoil and seeding at disturbed areas.
-Solicitation09/03/2026
PROJECT TITLE: BLDG 25 RENOVATION PROJECT LOCATION: BARNES ANGB, WESTFIELD, MA THIS COMMERCIAL CONSTRUCTION PROJECT REQUIRES ALL LABOR, TOOLS, EQUIPMENT, TRANSPORTATION, AND SUPERVISION; AS REQUIRED FOR THE PROJECT ELEMENTS AS DESCRIBED IN THE ATTACHED SPECIFICATION AND PLANS TO PERFORM CONSTRUCTION SERVICES FOR PROJECT AXQD232620, BLDG. 25 RENOVATION, AT THE 104 FW, WESTFIELD, MA 01085. NAICS CODE 236220 IS APPLICABLE TO THIS ACQUISITION. PROJECT MAGNITUDE IS BETWEEN $15M AND $20M. A SINGLE AWARD IS CONTEMPLATED. FAILURE TO SUBMIT AN OFFER ON ALL ITEMS SHALL RESULT IN REJECTION OF THE PROPOSAL. SOLICITATION AND ALL INFORMATION, NOTICES, AMENDMENTS FOR THIS SOLICITATION WILL BE POSTED AT HTTPS://SAM.GOV/. INSTRUCTIONS FOR OBTAINING PLANS AND SPECIFICATIONS AND OTHER SECURED DOCUMENTS FOR THIS SOLICITATION ARE LOCATED IN SECTION 00 21 00. AWARD WILL BE MADE TO THE OFFEROR WHO REPRESENTS THE BEST VALUE TO THE GOVERNMENT AS OUTLINED IN ACCORDANCE WITH THE CRITERIA SET FORTH WITHIN THE SOLICITATION. THE GOVERNMENT INTENDS TO AWARD WITHOUT NEGOTIATIONS BUT RESERVES THE RIGHT TO CONDUCT THEM IF NECESSARY.
-Solicitation08/05/2026
*** Bid opening results have been added as an attachment. *** Amendment 0002 has been issued updating plans and specs and extending the due date to 15 December 2025. ***Amendment 0001 has been issued providing site visit information and updating the due date to 8 December 2025. Invitation for Bids, Solicitation No. W912QR26BA001, is issued for a construction contract (Design/Bid/Build) for repair of the 37,000 SF Squadron Operations Facility, Building 7087, at Westover Air Reserve Base in Massachusetts. The contract duration is estimated at 519 calendar days from contract Administrative Notice to Proceed (NTP). Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
-Solicitation12/15/2025

Additional Details

Solicitation Number

W912WJ20R0001

Archive Date

Jul 22, 2020

Office Address

CONCORD, MA, 01742-2751