Notice ID: ac0ab1091564481b9d3fb688b0da3089Solicitation
Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal
Archived on February 10, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−05:00
- Posted
- January 27, 2021
- Notice type
- Solicitation
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW ENGLAND
- Place of performance
- Boston, 02128
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912WJ21B0001
- Notice ID
- ac0ab1091564481b9d3fb688b0da3089
Description
The third phase of the improvement project, this contract, shall remove the remaining material in the Boston Harbor Federal Navigation Project (FNP) to achieve authorized project depth. The project features include: removal of material in the Main Ship Channel (MSC) to the Conley Terminal, including the turning basin or "MSC Notch", to -49 feet MLLW, removal of material in the Reserved Channel to -49 feet MLLW, and removal of material in the President Roads Anchorage to -49 feet MLLW. A CAD file with the -49 foot MLLW Contour Limits will be provided to the Contractor. The Contractor shall be required to remove all material within that limit to -49 feet MLLW. There is an allowable 2-foot overdepth within the -49 foot MLLW Contour Limit. One limited area within the Main Ship Channel shall be brought to a depth of -42 feet MLLW with an allowable 2-foot overdepth. The Government will pay for a 1ft.V:1ft.H side slope. The material to be removed under this contract is material consisting primarily of rock with limited amounts of ordinary and hard material (clays, silts, sands and gravel) remaining as overburden.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ21B0001- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 16×SolicitationCurrentOct 14, 2020
Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912WJ21B0001
Archive Date
Feb 10, 2021
Office Address
CONCORD, MA, 01742-2751