Notice ID: b3c08d87aa244e11b2fbf3f2754c4e72Solicitation
Maintenance Dredging and Beach Fill Placement, Cape Cod Canal and Town Neck Beach, Bourne and Sandwich, MA
Archived on September 30, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- August 21, 2023
- Notice type
- Solicitation
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW ENGLAND
- Place of performance
- Bourne, MA, 02532
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- W912WJ23B0009
- Notice ID
- b3c08d87aa244e11b2fbf3f2754c4e72
Description
This project has a hopper dredge (with pump-out capability) only requirement and consists of maintenance dredging and advance maintenance dredging to remove approximately 80,000 cubic yards (cy) of clean sand and gravel from areas in the authorized, 32 foot deep by 500 foot wide, main-ship channel (Canal); the 25-foot-deep East Mooring Basin (EMB), and the 32-foot-deep West Mooring Basin (WMB) features of the Cape Cod Canal, FNP along with the placement of dredged material in a beach fill design on Town Neck Beach in Sandwich, MA. Dredging in the Canal and the EMB and WMB will be to a maximum elevation of -40? Mean Lower Low Water (MLLW) and remove approximately 80,000 cubic yards of sand and gravel. The material dredged from the FNP will be hauled to the east end of the Canal and pumped directly onto Town Neck Beach in Sandwich, MA. where it will be graded. Additional work requested by the Town of Sandwich including sand fence placement and dune plantings will be included as an optional bid item. The dredging and dredged material placement work is expected to take 6-8 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 October 2023 to 15 March 2024.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ23B0009- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJul 5, 2023
Cape Cod Canal Dredging. Bourne/Sandwich, MA
- 9×SolicitationCurrentJul 19, 2023
Maintenance Dredging and Beach Fill Placement, Cape Cod Canal and Town Neck Beach, Bourne and Sandwich, MA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912WJ23B0009
Archive Date
Sep 30, 2023
Office Address
CONCORD, MA, 01742-2751