GovChime
Notice ID: b3c08d87aa244e11b2fbf3f2754c4e72Solicitation

Maintenance Dredging and Beach Fill Placement, Cape Cod Canal and Town Neck Beach, Bourne and Sandwich, MA

Archived on September 30, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−04:00
Posted
August 21, 2023
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Place of performance
Bourne, MA, 02532
Last updated
Dec 6, 2025

Identifiers

Solicitation number
W912WJ23B0009
Notice ID
b3c08d87aa244e11b2fbf3f2754c4e72

Description

This project has a hopper dredge (with pump-out capability) only requirement and consists of maintenance dredging and advance maintenance dredging to remove approximately 80,000 cubic yards (cy) of clean sand and gravel from areas in the authorized, 32 foot deep by 500 foot wide, main-ship channel (Canal); the 25-foot-deep East Mooring Basin (EMB), and the 32-foot-deep West Mooring Basin (WMB) features of the Cape Cod Canal, FNP along with the placement of dredged material in a beach fill design on Town Neck Beach in Sandwich, MA. Dredging in the Canal and the EMB and WMB will be to a maximum elevation of -40? Mean Lower Low Water (MLLW) and remove approximately 80,000 cubic yards of sand and gravel. The material dredged from the FNP will be hauled to the east end of the Canal and pumped directly onto Town Neck Beach in Sandwich, MA. where it will be graded. Additional work requested by the Town of Sandwich including sand fence placement and dune plantings will be included as an optional bid item. The dredging and dredged material placement work is expected to take 6-8 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 October 2023 to 15 March 2024.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912WJ23B0009
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJul 5, 2023

    Cape Cod Canal Dredging. Bourne/Sandwich, MA

    Notice dad196c3ff8b4867bd281bff65353b46 on SAM.gov

  2. 9×
    SolicitationCurrentJul 19, 2023

    Maintenance Dredging and Beach Fill Placement, Cape Cod Canal and Town Neck Beach, Bourne and Sandwich, MA

    Notice b3c08d87aa244e11b2fbf3f2754c4e72 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ23B0009

Archive Date

Sep 30, 2023

Office Address

CONCORD, MA, 01742-2751