Notice ID: 1f8382006c46416db22e7690c6dc50c4Solicitation

Maintenance Dredging of Green Harbor, Marshfield, Massachusetts, Federal Navigation Project

Archived on August 20, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−04:00
Posted
August 30, 2023
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Place of performance
Green Harbor, MA, 02041
Last updated
Dec 6, 2025

Identifiers

Solicitation number
W912WJ23B0023
Notice ID
1f8382006c46416db22e7690c6dc50c4

Description

The proposed work in the FNP consists of maintenance dredging of the 6foot and 8 feet deep entrance channel and of the 6-foot-deep inner harboranchorage area. The project will require dredging of about 44,000 cubicyards (CY) of mixed sandy and silty material from the anchorage area andapproximately 15,000 CY of sand and cobbles from the entrance channel.Material dredged from the entrance channel will be placed (from 1November 2023 to 31 January 2024) at a previously used nearshore area, ahaul distance of about 1 nautical mile from the harbor. Material dredgedfrom the anchorage will be hauled to, and placed (from 1 October 2023 to31 December 2023) at, the Cape Cod Bay Disposal Site, about 13 nauticalmiles away from the harbor.This project will require floating marine plant consisting in part of a bargemounted mechanical (bucket) dredge, two or more scows for hauling thedredged materials, tugs to position the dredge and tow the scows,workboats to transfer crew, and survey boats. Dredging and disposaloperations are expected to take about three months to complete. Theavailable work window for this project is 1 October to 31 January asoutlined above. Contingent upon receiving competitive bids, work isanticipated to start in October 2023.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W912WJ23B0023
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 6×
    Pre-SolicitationJun 8, 2023

    Maintenance Dredging of the Federal Navigation Project (FNP) at Green Harbor located in Marshfield, Massachusetts

    Notice 1ef630509eaf4bb1b8c44478aff0f5c1 on SAM.gov

  2. 5×
    SolicitationCurrentJul 25, 2023

    Maintenance Dredging of Green Harbor, Marshfield, Massachusetts, Federal Navigation Project

    Notice 1f8382006c46416db22e7690c6dc50c4 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ23B0023

Archive Date

Aug 20, 2024

Office Address

CONCORD, MA, 01742-2751