Notice ID: 1f8382006c46416db22e7690c6dc50c4Solicitation
Maintenance Dredging of Green Harbor, Marshfield, Massachusetts, Federal Navigation Project
Archived on August 20, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- August 30, 2023
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW ENGLAND
- Place of performance
- Green Harbor, MA, 02041
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- W912WJ23B0023
- Notice ID
- 1f8382006c46416db22e7690c6dc50c4
Description
The proposed work in the FNP consists of maintenance dredging of the 6foot and 8 feet deep entrance channel and of the 6-foot-deep inner harboranchorage area. The project will require dredging of about 44,000 cubicyards (CY) of mixed sandy and silty material from the anchorage area andapproximately 15,000 CY of sand and cobbles from the entrance channel.Material dredged from the entrance channel will be placed (from 1November 2023 to 31 January 2024) at a previously used nearshore area, ahaul distance of about 1 nautical mile from the harbor. Material dredgedfrom the anchorage will be hauled to, and placed (from 1 October 2023 to31 December 2023) at, the Cape Cod Bay Disposal Site, about 13 nauticalmiles away from the harbor.This project will require floating marine plant consisting in part of a bargemounted mechanical (bucket) dredge, two or more scows for hauling thedredged materials, tugs to position the dredge and tow the scows,workboats to transfer crew, and survey boats. Dredging and disposaloperations are expected to take about three months to complete. Theavailable work window for this project is 1 October to 31 January asoutlined above. Contingent upon receiving competitive bids, work isanticipated to start in October 2023.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ23B0023- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 6×Pre-SolicitationJun 8, 2023
Maintenance Dredging of the Federal Navigation Project (FNP) at Green Harbor located in Marshfield, Massachusetts
- 5×SolicitationCurrentJul 25, 2023
Maintenance Dredging of Green Harbor, Marshfield, Massachusetts, Federal Navigation Project
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912WJ23B0023
Archive Date
Aug 20, 2024
Office Address
CONCORD, MA, 01742-2751