Notice ID: 543568c4dc704940a9f61c858fd7efa4Award NoticeAwarded
Concrete Repairs, Everett Dam, Weare, NH
Awarded on September 26, 2023. Full description on SAM.gov.
Awarded tounder W912WJ23P0136 (source: SAM.gov award notice)• $123.3K
Overview
- Posted
- September 26, 2023
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238110: Poured Concrete Foundation and Structure Contractors
- Agency
- Department of War
Notice details
- Last updated
- Sep 9, 2025
- Award date
- Sep 26, 2023
- Award amount (SAM.gov award notice)
- $123.3K
Identifiers
- Solicitation number
- W912WJ23Q0108
- Notice ID
- 543568c4dc704940a9f61c858fd7efa4
- Award number (PIID)
- W912WJ23P0136
Description
Summary of Work: Repair of deteriorated concrete at several locations within the overall facility. Several locations inside the Inlet Weir Box. Includes replacement of timber weir/stop logs. Minor spall and crack repairs at the Intake Tower Concrete repairs at the base of the Access Spillway Bridge Pier where it interfaces with the spillway structure. Works inside the Inlet Weir Box will be considered a Non-Permit Required Confined Space.. Time of Year Restriction: Works inside the Inlet Weir Box will be conducted during low water season between June 15th through September 30th, 2024. Temporary Control of Water: Contractor shall not need any temporary control of reservoir water level; however, contractor may still need some type of water control system to keep work areas inside the weir box dry during repair work due to back eddying of water, seepage, or rainwater into the weir box and center conduit. Contractor Staging Area and Access: Contractor staging area is at the grassy area north of the dam. Access to staging area and to all work within the weir box shall be through Clough Park Road through the Clough State Park. Coordination with Other Works: A separate paving replacement contract for the parking lot, Dam Crest Road and access road to the toe of the dam will be occurring at the same time with this concrete repair contract. Coordination with the other Contractor will be required for the Intake Tower and Bridge Pier repair works. Proposed Construction Sequencing: To minimize conflict with the Paving Contract, sequence work inside the weir box to start as close to June 15, 2024 as possible. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238110 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
Award Overview
Award Number
W912WJ23P0136
Award Amount (SAM.gov award notice)
$123.3K
Award Date
Sep 26, 2023
Awardee
Awardee UEI
KEDQANAVMA87
Original Solicitation
Notice ID: 543568c4dc704940a9f61c858fd7efa4
Posted Date: Sep 26, 2023
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ23Q0108- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationAug 1, 2023
Concrete Repairs, Everett Dam, Weare, NH
- 3×SolicitationAug 16, 2023
Concrete Repairs, Everett Dam, Weare, NH
- AwardedCurrentSep 26, 2023
Concrete Repairs, Everett Dam, Weare, NH
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912WJ23Q0108
Archive Date
Oct 11, 2023
Office Address