GovChime
Notice ID: 024b11a0959844ff849cd7b5d66248dfSolicitation

Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation

Archived on August 2, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−04:00
Posted
August 20, 2024
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Place of performance
Sandwich, MA
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912WJ24B0011
Notice ID
024b11a0959844ff849cd7b5d66248df

Description

The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation Project, located in Sandwich, Massachusetts. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take approximately 5 months to complete. The estimated construction cost is $5,000,000 to $10,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District.This project will require hydraulically dredging about 320,300 CY of sand within the established footprint of the nearshore Scussett Beach Borrow Area (SBBA) to a maximum elevation of -18 feet Mean Lower Low Water (MLLW). The material dredged from the SBBA will be pumped directly onto the beach via an estimated length of approximately 9,000 feet of hydraulic pipeline. Crossing the Canal with the hydraulic pipeline will be required between the SBBA and Town Neck Beach. Within the limits of the Canal the top of pipeline must be submerged at all times to depths equal to or greater than -38 feet MLLW and bottom of pipeline continuously resting on the ocean floor. Dredged material that is pumped directly onto Town Neck Beach will be spread, shaped, and graded to meet the beach?s required beach berm and dune profile.Under this contract the successful offeror will be required to provide the equipment (i.e., hydraulic pipeline dredge plant, booster pump(s), pipeline weights, and heavy equipment) and materials required for the removal of material from the aforementioned SBBA and for the placement of dredged materials onto Town Neck Beach including both publicly and privately owned properties. The anticipated dredging window for the project is from October 1, 2024 ? March 15, 2025. It is anticipated that a production rate (i.e. dredging and placement of dredged material) of 110,000 cubic yards per month will need to be achieved to complete the work within the designated dredging window.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912WJ24B0011
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    Pre-SolicitationMay 14, 2024

    Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation

    Notice d572e8a7fe63481087713638e857078b on SAM.gov

  2. 11×
    SolicitationCurrentJul 16, 2024

    Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation

    Notice 024b11a0959844ff849cd7b5d66248df on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ24B0011

Archive Date

Aug 2, 2025

Office Address

CONCORD, MA, 01742-2751