GovChime
Notice ID: 984dbe851559472e851db31a2d56f25fSolicitation

Gatehouse Electrical Upgrades, Franklin Falls Dam ? Franklin, NH

Archived on July 22, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−04:00
Posted
August 12, 2024
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
W2SD ENDIST NEW ENGLAND
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W912WJ24B0016
Notice ID
984dbe851559472e851db31a2d56f25f

Description

The work of this project involves electrical upgrades to the Gatehouse Structure at the Franklin Falls Dam in Franklin, New Hampshire. Specific work tasks include, but are not limited to, replacement of the existing motor disconnects for eight (8) gate hoists, replacement of the existing motor controllers for each gate hoist, and replacement of existing conductors from the gatehouse main switchboard to each gate hoist. All existing commercial and standby power infrastructure shall remain and continue to be utilized to support existing loads. The Contractor shall note that metal surfaces of the controllers and conduits and related items are coated with a lead-containing paint. Also, within the motor controller boxes are asbestos-cement electrical arc chutes. The Contractor shall follow all requirements for worker and environmental protection and hazardous material handling and disposal related to lead and asbestos work, as specified in this document and in accordance with Federal, State of New Hampshire, and local rules and regulations. The Contractor shall note that the sub-operating floor in the Gatehouse is considered a confined space. The Contractor shall follow all requirements for worker related to confined spaces, as specified in this document and in accordance with Federal, State of New Hampshire, and local rules and regulations.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912WJ24B0016
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    SolicitationCurrentJul 8, 2024

    Gatehouse Electrical Upgrades, Franklin Falls Dam ? Franklin, NH

    Notice 984dbe851559472e851db31a2d56f25f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ24B0016

Archive Date

Jul 22, 2025

Office Address

CONCORD, MA, 01742-2751