Notice ID: bbf9ec551fbe4b9aac1071508f5ee229Solicitation
Essex River Maintenance Dredging
Archived on August 20, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:15 PM UTC−04:00
- Posted
- August 21, 2024
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW ENGLAND
- Place of performance
- MA
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912WJ24B0018
- Notice ID
- bbf9ec551fbe4b9aac1071508f5ee229
Description
The U.S. Army Corps of Engineers, New England District will be issuing a Small Business Set aside Invitation for Bids (IFB) procurement for maintenance dredging of the Essex River Federal Navigation Project (FNP) located in Essex, ME. The NAICS code for the work is 237990 (size standard of $37M). Construction is expected to take approximately 3 to 4 months to complete. The estimated construction cost is between $1,000,000.00 and$5,000,000.00. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The proposed work consists of mechanically dredging approximately 17,500 cubic yards (cy) of sand and silty material from the 4-foot channel and 4-foot anchorage (below Mean Lower Low Water) and placing at two geographically different locations. Sandy shoal material dredged from the project will be hauled approximately 2 miles from the entrance of Essex River to the Ipswich Bay Nearshore site while the silty material from the head of navigation will be dredged and hauled approximately 29 miles from the mouth of the river to the Isle of Shoals North placement site. Of the 17,500 cy project total approximately 7,000 cy is required dredging with the remaining 10,500 cy considered 1-foot of allowable over depth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Essex River sees tide ranges as high as 9 feet during normal tide cycles. Dredging and disposal operations will be performed between October 1, 2024 and March 23, 2025 to meet environmental time of year (TOY) restrictions. In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 8,000 CY per 30 calendar days. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
W912WJ24B0018- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJun 18, 2024
Essex River Maintenance Dredging
- 6×SolicitationCurrentJul 19, 2024
Essex River Maintenance Dredging
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Maintenance Dredging, Wareham Harbor, Wareham, MA | 98% | Solicitation | 01/21/2026 |
The Isle au Haut Thoroughfare Federal Navigation Project, located between Isle au Haut, Maine and Kimball Island, Maine on the outskirts of Penobscot Bay, about six miles southeast of Stonington and 25 miles east of Rockland. The Federal Navigation Project consists of a -6-foot Mean Lower Low Water (MLLW) deep by 75-foot wide extending 1,200-foot in length through the shoal in the thoroughfare.The proposed work consists of mechanically dredging approximately 3,355 cubic yards (cy) (1,183 cy required, plus 2,172 cy overdepth) of shoaled material consisting of highly compacted coarse sand and gravel, with areas of cobbles and isolated small boulders from the channel. Due to the material type, a mechanical dredge with the ability to dig highly compacted coarse sand and gravel will be required. The proposed action is to dredge to the authorized depth of -6-foot MLLW plus an additional 1-foot of required advance maintenance with an additional allowable 1-foot of overdepth (e.g. -7-foot MLLW required + 1-foot allowable OD). One-time, advanced maintenance is approved for the entirety of the 1200-foot long authorized channel. The dredged material will be placed at the Flake Island Disposal Site (FIDS) which is approximately 1 nautical mile northwest of the FNP. Placement of the dredged material (sand, gravel and cobble) at Flake Island Disposal Site will benefit both juvenile lobster habitat and juvenile cod by increasing the areas habitat complexity.The anticipated allowable dredging window is between September 15 and April 1 to avoid impacts to spawning shellfish, benthic resources, Essential Fish Habitat (EFH) of federally managed species, threatened and endangered species and interactions with mobile fishing gear. | 87% | Solicitation | 11/10/2026 |
The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Wareham Harbor Federal Navigation Project, located in Wareham, Massachusetts. This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Wareham Harbor FNP consists of a 2.4 mile long, 9-foot deep Mean Lower Low Water (MLLW) channel. The channel is comprised of several reaches of varying widths (100-ft to 250-ft widths) to include the entrance channel through Cromeset Neck Reach, Quahaug Bar Reach, Parkwood Beach Reach, and the Inner Harbor Reach. The proposed work consists of mechanically dredging up to appropriately 52,000 cubic yards (CY) of shoaled material over a 10.2-acre area. Most of the material is fine-grained/silt and will be transported by scow and placed at Cape Cod Bay Disposal Site (CCBDS), approximately 35 miles away. Transit from Wareham to CCBDS will occur through the Cape Cod Canal. A smaller portion of the material is sand (approx. 1,000 CY) and will be placed beneficially at a nearshore site off of Church's Beach in Cuttyhunk, Massachusetts (approximately 28 miles away). Dredging operations can start on July 1, 2026 for maintenance dredging using a mechanical dredge and placement in open water at CCBDS and Church’s Beach Nearshore Placement Site. All work must be complete by December 31, 2026. In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 28,500 CY per 30 consecutive calendar day period. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-November 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://www.sam.gov/) and the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at heather.m.skorik@usace.army.mil. The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Wareham Harbor Federal Navigation Project, located in Wareham, Massachusetts. This procurement is a Small Business Set Aside Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Wareham Harbor FNP consists of a 2.4 mile long, 9-foot deep Mean Lower Low Water (MLLW) channel. The channel is comprised of several reaches of varying widths (100-ft to 250-ft widths) to include the entrance channel through Cromeset Neck Reach, Quahaug Bar Reach, Parkwood Beach Reach, and the Inner Harbor Reach. The proposed work consists of mechanically dredging up to appropriately 52,000 cubic yards (CY) of shoaled material over a 10.2-acre area. Most of the material is fine-grained/silt and will be transported by scow and placed at Cape Cod Bay Disposal Site (CCBDS), approximately 35 miles away. Transit from Wareham to CCBDS will occur through the Cape Cod Canal. A smaller portion of the material is sand (approx. 1,000 CY) and will be placed beneficially at a nearshore site off of Church's Beach in Cuttyhunk, Massachusetts (approximately 28 miles away). Dredging operations can start on July 1, 2026 for maintenance dredging using a mechanical dredge and placement in open water at CCBDS and Church’s Beach Nearshore Placement Site. All work must be complete by December 31, 2026. In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 28,500 CY per 30 consecutive calendar day period. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about mid-November 2025. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award Management website (https://www.sam.gov/) and the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at heather.m.skorik@usace.army.mil. | 82% | Pre-Solicitation | Open |
Award from Solicitation No. W911XK26BA009 for the Alpena Harbor Maintenance Dredging | 81% | Awarded | Open |
Amendment 0001 issued on July 20, 2022 Amendment 0002 issued on August 09, 2022 Amendment 0003 issued on August 22, 2022 Amendment 0004 issued on August 26, 2022 Abstract of Bids issued on August 30, 2022 Lower Wicomico River Maintenance Dredging at Wicomico County, MD This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237990 “Other Heavy and Civil Engineering Construction” with a size standard of $39,500,000.00. Total 100% Small Business Set-aside. This project is to include the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable over depth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. The pipeline will be placed atop the existing berm at the WMA impoundment and a diffuser shall be used at multiple locations to place the material at a lower velocity into the placement site. The outflow of the pipeline shall be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 70 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. Wetland restoration is meant to increase migratory bird nesting habitat. To ensure the restoration goals are met the placement location shall also include placing straw bales as natural containment around the southern end of the placement site. The straw bales are to act as containment for dredged material placed for wetland restoration and increasing migratory bird nesting habitat. Approximately 11,000 strawbales will be used stacked two high with an additional single stacked row at the interior of the placement site to provide proper containment of the dredged material. Tidal ditch plugs shall be constructed in areas of high erosion or open water. Approximately 20 ditch plugs of varying size are to be constructed. After dredged material placement, vegetation will be planted to restore the wetland. Planting of vegetation will occur over the two growing seasons post dredged material placement. Vegetation will be Spartina patens and Distichlis spicata, and possibly a smaller amount of Panicum. Vegetation the first growing season may require aerial seeding, based on consolidation of the dredged material. Vegetation the first growing season shall also require the exterior edge only to be hand planted to provide stabilization, with interior planting occurring the second growing season once material has consolidated. | 81% | Solicitation | 08/30/2022 |
Additional Details
Solicitation Number
W912WJ24B0018
Archive Date
Aug 20, 2025
Office Address
CONCORD, MA, 01742-2751