GovChime
Notice ID: 9793514b5a284b4496ee9df4f33cd494SolicitationArchived

Construction Services to Paint Old Route 8 Bridge, Colebrook River Lake Dam, Sandisfield, MA

Archived on September 30, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EDT
Posted
September 22, 2025
Notice type
Solicitation

Notice details

Place of performance
Sandisfield
Last updated
Nov 7, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912WJ25BA026
Notice ID
9793514b5a284b4496ee9df4f33cd494

Description

The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Old Route 8 Bridge Painting in Sandisfield, MA. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238320 and the size standard is $19 million. The project is planned to be issued in August 2025 and will be set aside for Small Business. The period of performance will be approximately 90 days. The estimated magnitude of this project is between $250,000 to $500,000.The Old Route 8 Bridge is a single span through truss which carries Old Route 8 over the West Branch of the Farmington River in the Colebrook River Lake area of Colebrook, Connecticut. The bridge itself is located in Sandisfield, Massachusetts and was built in 1927. The site of the work is fully within the Commonwealth of Massachusetts.The span length of the bridge is 136?-2? center-to-center of bearings. The roadway width is 28?-0?between 21? wide by 8? high concrete safety curbs with steel angle wheel guards. The deck slab variesin thickness from 8-5/8? at the center to 6 ?? at the curb and is supported by 18?-5? or 20?-10? long by18? deep American Standard I-beam stringers spaced at 3?-7 ?? on center. The I-beams are framed into3?-1/2? deep floor beams and are spaced either 18?-5? or 20?-0? on center. The floor beams are framedinto the truss on both sides. The chords of each truss are braced laterally in each bay. The bridge is on a41? skew.The work of this project consists of cleaning, preparation, and painting of the Old Route 8 bridge. Theexisting paint on the bridge is believed to include the original coatings and subsequent maintenancecoatings (the number of these maintenance coatings is unknown) applied over the original at variouspoints over the life of the bridge. The last maintenance painting was performed in 2008. Full removalof coatings has never been performed for this structure. Data pertaining to the paints used for theoriginal coatings and subsequent coatings is not available, however, the Contractor shall assume thatlead-containing paint was used for the original coatings and possibly some of the subsequentmaintenance coatings as well and that lead concentrations are high (1.0 mg/cm? or 0.5% (5,000 ppm)or greater). Sampling and testing of the existing coatings for lead has not been performed.Due to the high likelihood that lead containing coatings remain on the steel members of the bridgestructure, the Contractor is required to implement worker health and safety measures andenvironmental protection measures as required by these specifications and by applicable Federal, Stateof Massachusetts, and local laws and regulations, including any applicable permits or licensing. Scaffolding may be required and fall protection safety measures will be needed.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (1)

  • Bid Abstract.pdf

    978 KBAdded in Solicitation version 6Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Construction Services to Paint Old Route 8 Bridge, Colebrook River Lake Dam, Colebrook, CT

    Notice f3bb56394e93489a9b005a357bd62192 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Construction Services to Paint Old Route 8 Bridge, Colebrook River Lake Dam, Sandisfield, MA

    Notice ccb80231810441538df98d528acc3c5a on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Construction Services to Paint Old Route 8 Bridge, Colebrook River Lake Dam, Sandisfield, MA

    Notice 98b52b7a7d2c4179b93599d13256d64a on SAM.gov

  4. 4
    Version 4SolicitationArchived

    Construction Services to Paint Old Route 8 Bridge, Colebrook River Lake Dam, Sandisfield, MA

    Notice dd605a1b19c944178b7586af3ae17688 on SAM.gov

  5. 5
    Version 5SolicitationArchived

    Construction Services to Paint Old Route 8 Bridge, Colebrook River Lake Dam, Sandisfield, MA

    Notice b00af1f1b9e046ae98441afa35969f35 on SAM.gov

  6. 6
    Version 6SolicitationArchived

    Construction Services to Paint Old Route 8 Bridge, Colebrook River Lake Dam, Sandisfield, MA

    Notice bdbf5b9fd3dd41cd9896910830d60e79 on SAM.gov

  7. 7
    Version 7SolicitationArchivedCurrent

    Construction Services to Paint Old Route 8 Bridge, Colebrook River Lake Dam, Sandisfield, MA

    Notice 9793514b5a284b4496ee9df4f33cd494 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeJul 24, 2025

    Old Route 8 Bridge Painting, Colebrook Lake Dam, Sandisfield, MA

    Notice 9b8e45662dfa4f499fdcd21bd7b91ec4 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912WJ25BA026

Archive Date

Sep 30, 2025