Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA.
Archived on October 16, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- October 14, 2026
- Notice type
- Special Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW ENGLAND.W2SD ENDIST NEW ENGLAND
- Place of performance
- Hanscom AFB, Massachusetts, 01731
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912WJ26BA011
- Notice ID
- 2c9002c851fd4789b3675a2c52c3c953
Description
PREQUALIFICATION ANNOUNCEMENT
This is a PREQUALIFICATION OF SOURCES announcement, issued in accordance with DFARS 236.101-70 (DFARS CD 2026-O0019) - Prequalification of Sources, and the U.S. Army Corps of Engineers Acquisition Instruction (UAI) 5136.272. No reimbursement will be made for any costs associated with providing information in response to this announcement.
The U.S. Army Corps of Engineers (USACE), New England District is seeking to prequalify sources for Solicitation W912WJ26BA011, Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA. Only those sources that submit a prequalification package and are found qualified will be eligible to compete in the resulting Invitation for Bid (IFB).
The project solicitation is planned to be issued on or around the end of July 2026. This procurement will be an unrestricted procurement. All eligible firms, regardless of size standard, are eligible to submit for prequalification. The estimated magnitude of this project is between $25M to $50M.
BACKGROUND
This acquisition is to build a new fire station at HAFB, a new APT, and demolish Building 1721. The current fire station is in Building 1721, which also includes HAFB’s APT. A new APT will be constructed near its current location. The new fire station will be built on HAFB at the site of an abandoned gas station, Building 1639. Building 1639 is currently being demolished under a separate contract. The new fire station will be a single story, 25,532 square foot (SF), fully functional facility. The program includes apparatus bays for six vehicles, living quarters, and administration spaces. Proposed construction will consist of a concrete foundation, reinforced floor slabs, steel framing and masonry walls, HVAC, central fire alarm, Emergency Communications Center with Fire and Security Forces Dispatch, paving, and landscaping. The APT will be constructed north of existing Building 1721 and will be a single story 5,156 SF facility. The APT will include the safety offices, Distinguished Visitors lounge, pavement for building access and turnaround, as well as sidewalks. The existing flightline perimeter fence will be re-routed to the new APT building location. Building 1721, to be demolished, is an existing multi-story, 21,270 SF, facility that houses the existing fire station, safety offices, air passenger terminal, and Distinguished Visitor lounge. Building 1721 must remain operational until the two new buildings have been completed and the tenants have moved into their new respective buildings.
QUALIFICATION REQUIREMENTS:
Submit an example of one prior construction project. All of the following must be true:
- Project consisted of one building (not multiple buildings within a single project);
- Project was new vertical construction (not renovation);
- Minimum total construction cost of $30M;
- Minimum interior area of 18,000 square feet;
- Project reached 100% completion within the last ten years.
A project is defined as work performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the IDIQ contract should not be submitted as a project; rather, potential bidders should submit the work performed under a task order as a project.
The entity that bids on W912WJ26BA011 must either:
- Be the exact same entity as the prime general contractor for the prequalification project; or
- Include in its prequalification submission a Letter of Commitment from the prime general contractor for the prequalification project. The letter shall include a commitment to be meaningfully involved during contract performance. The subcontractor/partner must be utilized during performance of the contract and cannot be replaced without approval from the Contracting Officer. Replacement without Contracting Officer approval will be grounds for contract termination.
***It is anticipated that a Project Labor Agreement will be required for this procurement. Further details/requirements will be included in the solicitation. ***
DOCUMENTATION REQUIREMENTS
Each potential bidder shall send USACE the following –
- CAGE Code and evidence of active registration in SAM.
2. Prior project narrative (not to exceed 5 pages) that includes:
- All elements listed above;
- Description of the work performed;
- Location of the prior project;
- Role of potential bidder on prior project;
- Project customer contact information.
3. Letter of Commitment (if required)
SOLICITATION PROCESS:
Following Prequalification procedures, qualified Bidders will be invited to submit a bid in response to an Invitation for Bid. Only those contractors prequalified will be eligible to receive an invitation for bid. The apparent low bid will be reviewed for responsiveness and the bidder reviewed for responsibility.
PREQUALIFICATION RESPONSES
Interested firms shall respond to this Prequalification of Sources announcement no later than 2:00pm 23 July 2026, to be eligible for evaluation of their qualifications. All interested firms must be actively registered at www.sam.gov using NAICS 236220 to be eligible for award of federal contracts. Respondents will be notified of whether they passed the prequalification review.
Email your electronic response to Elizabeth Glasgow at elizabeth.k.glasgow@usace.army.mil.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
- 1Version 1Special NoticeArchived
Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA.
- 3Version 3Special NoticeArchived
Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA.
- 4Version 4Special NoticeArchived
Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA.
- 5Version 5Special NoticeArchivedCurrent
Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA.
Other notices for this solicitation
- Pre-SolicitationRelated noticeMar 9, 2026
Construction of Fire Station and Air Passenger Terminal (APT), Demolish Building 1721 at Hanscom AFB (HAFB), MA.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center operations which will limit laydown and storage areas during construction. | - | Solicitation | 11/20/2026 |
The U.S. Army Corps of Engineers, New England District is issuing this Request for Qualifications for the Demolition and Construction of Thayer Hall at the United States Military Academy, West Point, New York. This project will be executed as a Construction Manager at Risk (CMAR) Other Transaction Agreement (OTA) under the statutory authority of 10 U.S.C. 2808a, Facility Construction or Repair. This approach will involve the general contractor during the design phase to provide feedback and input to the designer of record and the government on constructability, operability, cost, and value engineering on the design being developed. | - | Solicitation | 09/24/2026 |
The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for the New Project Office at the East Brimfield Lake Dam in Fiskdale, Massachusetts. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 236220 with a size standard of $45M. The project is planned to be issued in June 2026 and will be set aside for Small Businesses. The period of performance will be approximately 365 days. The estimated magnitude of this project is between $1,500,000 and $3,500,000The work of this project involves the demolition of two existing out-buildings (which will include lead paint abatement), and the construction of a new one-story wood framed project office building with a pitched roof. The building consists of offices, kitchen, restroom, reception spaces and an attached two-bay garage.The project includes the redevelopment and expansion of the existing paved area to provide additional parking spaces, and improvements to accessible access to the building.The work will also include all necessary utility and earthwork, such as, but not limited to excavation, filling, backfilling, trenching, compaction, and grading; placing topsoil and seeding at disturbed areas. | - | Solicitation | 09/03/2026 |
PROJECT TITLE: BLDG 25 RENOVATION PROJECT LOCATION: BARNES ANGB, WESTFIELD, MA THIS COMMERCIAL CONSTRUCTION PROJECT REQUIRES ALL LABOR, TOOLS, EQUIPMENT, TRANSPORTATION, AND SUPERVISION; AS REQUIRED FOR THE PROJECT ELEMENTS AS DESCRIBED IN THE ATTACHED SPECIFICATION AND PLANS TO PERFORM CONSTRUCTION SERVICES FOR PROJECT AXQD232620, BLDG. 25 RENOVATION, AT THE 104 FW, WESTFIELD, MA 01085. NAICS CODE 236220 IS APPLICABLE TO THIS ACQUISITION. PROJECT MAGNITUDE IS BETWEEN $15M AND $20M. A SINGLE AWARD IS CONTEMPLATED. FAILURE TO SUBMIT AN OFFER ON ALL ITEMS SHALL RESULT IN REJECTION OF THE PROPOSAL. SOLICITATION AND ALL INFORMATION, NOTICES, AMENDMENTS FOR THIS SOLICITATION WILL BE POSTED AT HTTPS://SAM.GOV/. INSTRUCTIONS FOR OBTAINING PLANS AND SPECIFICATIONS AND OTHER SECURED DOCUMENTS FOR THIS SOLICITATION ARE LOCATED IN SECTION 00 21 00. AWARD WILL BE MADE TO THE OFFEROR WHO REPRESENTS THE BEST VALUE TO THE GOVERNMENT AS OUTLINED IN ACCORDANCE WITH THE CRITERIA SET FORTH WITHIN THE SOLICITATION. THE GOVERNMENT INTENDS TO AWARD WITHOUT NEGOTIATIONS BUT RESERVES THE RIGHT TO CONDUCT THEM IF NECESSARY. | - | Solicitation | 08/05/2026 |
*** Bid opening results have been added as an attachment. *** Amendment 0002 has been issued updating plans and specs and extending the due date to 15 December 2025. ***Amendment 0001 has been issued providing site visit information and updating the due date to 8 December 2025. Invitation for Bids, Solicitation No. W912QR26BA001, is issued for a construction contract (Design/Bid/Build) for repair of the 37,000 SF Squadron Operations Facility, Building 7087, at Westover Air Reserve Base in Massachusetts. The contract duration is estimated at 519 calendar days from contract Administrative Notice to Proceed (NTP). Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. | - | Solicitation | 12/15/2025 |
Additional Details
Solicitation Number
W912WJ26BA011
Archive Date
Oct 16, 2026
Office Address
CONCORD, MA, 01742-2751