Notice ID: f5a1692dbd7a41be90faca4b3a7a067aAward NoticeAwarded

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

Awarded on September 25, 2026. Award Notice posted by DEPT OF DEFENSE (DEPT OF THE ARMY) on September 28, 2026. Solicitation W912WJ26CA019.

NAICS 237130 (Power and Communication Line and Related Structures Construction). Place of performance: Bourne, Massachusetts. Full description on SAM.gov.

Awarded tounder W912WJ26CA019 (source: SAM.gov award notice)• $131.9M

Description

Power Generation Microgrid construction at Cape Cod Space Force Station in Borune, MA

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Army
Office:US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW ENGLAND.W2SD ENDIST NEW ENGLAND
Posted:September 28, 2026
NAICS:237130: Power and Communication Line and Related Structures Construction
Last Updated:Oct 10, 2026
PSC:Y1QA: CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Response Deadline:
Not specified
Set-Aside:Not specified
Type:Award Notice
Place of Performance:Bourne, Massachusetts
Award Date:Sep 25, 2026
Award Amount (SAM.gov award notice):$131.9M

Award Overview

Award Number

W912WJ26CA019

Award Amount (SAM.gov award notice)

$131.9M

Award Date

Sep 25, 2026

Awardee

Awardee UEI

EATDZJL6JFJ5

Awardee CAGE Code

1GMT3

Original Solicitation

Notice ID: f5a1692dbd7a41be90faca4b3a7a067a

Posted Date: Sep 28, 2026

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912WJ26CA019
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentSep 28, 2026

    Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

    Notice f5a1692dbd7a41be90faca4b3a7a067a on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with minimal dis?ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en?ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa?cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con?trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera?tors, uninterrupted power supplies, critical and non-critical power distribution re?sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis?sion critical operations and impacted pro?tective HEMP barriers.
Solicitation237130No Set-Aside03/06/202603/11/2026Bourne, MA
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers.
Solicitation237130No Set-Aside03/06/202603/11/2026Bourne, MA
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers.
Solicitation237130No Set-Aside03/04/202603/11/2026Bourne, MA
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers.
Solicitation237130No Set-Aside03/03/202603/11/2026Bourne, MA
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with minimal dis?ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en?ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa?cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con?trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera?tors, uninterrupted power supplies, critical and non-critical power distribution re?sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis?sion critical operations and impacted pro?tective HEMP barriers.
Solicitation237130No Set-Aside02/27/202603/11/2026Bourne, MA

Additional Details

Solicitation Number

W912WJ26CA019

Archive Date

Oct 10, 2026

Office Address