Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA
Awarded on September 25, 2026. Award Notice posted by DEPT OF DEFENSE (DEPT OF THE ARMY) on September 28, 2026. Solicitation W912WJ26CA019.
NAICS 237130 (Power and Communication Line and Related Structures Construction). Place of performance: Bourne, Massachusetts. Full description on SAM.gov.
Description
Power Generation Microgrid construction at Cape Cod Space Force Station in Borune, MA
Overview
Award Overview
Award Number
W912WJ26CA019
Award Amount (SAM.gov award notice)
$131.9M
Award Date
Sep 25, 2026
Awardee
Awardee UEI
EATDZJL6JFJ5
Awardee CAGE Code
1GMT3
Original Solicitation
Notice ID: f5a1692dbd7a41be90faca4b3a7a067a
Posted Date: Sep 28, 2026
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
W912WJ26CA019- Awarded
This opportunity has been awarded.
- AwardedCurrentSep 28, 2026
Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with minimal dis?ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en?ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa?cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con?trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera?tors, uninterrupted power supplies, critical and non-critical power distribution re?sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis?sion critical operations and impacted pro?tective HEMP barriers. | Solicitation | 237130 | No Set-Aside | 03/06/2026 | 03/11/2026 | Bourne, MA | |
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers. | Solicitation | 237130 | No Set-Aside | 03/06/2026 | 03/11/2026 | Bourne, MA | |
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers. | Solicitation | 237130 | No Set-Aside | 03/04/2026 | 03/11/2026 | Bourne, MA | |
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers. | Solicitation | 237130 | No Set-Aside | 03/03/2026 | 03/11/2026 | Bourne, MA | |
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with minimal dis?ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en?ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa?cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con?trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera?tors, uninterrupted power supplies, critical and non-critical power distribution re?sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis?sion critical operations and impacted pro?tective HEMP barriers. | Solicitation | 237130 | No Set-Aside | 02/27/2026 | 03/11/2026 | Bourne, MA |
Additional Details
Solicitation Number
W912WJ26CA019
Archive Date
Oct 10, 2026
Office Address
CONCORD, MA, 01742-2751