Construct New Public Water Supply Well at Cape Cod Space Force Station

Archived on July 18, 2026. Sources Sought posted by DEPT OF DEFENSE (DEPT OF THE ARMY) on June 3, 2026. Solicitation W912WJ26X1BVC.

NAICS 237110 (Water and Sewer Line and Related Structures Construction). Place of performance: Bourne, Massachusetts. Original response deadline: . Full description on SAM.gov.

Description

Action Code:  Sources Sought Notice

Subject:  Construct New Public Water Supply Well at Cape Cod Space Force Station (CCSFS) in Bourne, Massachusetts  

Solicitation Number:  PANNAD-26-P-0000 032411

NACIS Code:   237110 (Water and Sewer Line and Related Structures Construction)

Response date:   3 July 2026

Place of Performance: CCSFS, Bourne, MA

US Army Corps of Engineers, New England District

696 Virginia Road

Concord, MA 01742-2751

The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Notice (SSN) for Construction Services to execute a Design-Build contract for the Construction of a New Public Water Supply Well project located at CCSFS, Bourne, MA.  This announcement is to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned and Small Business concerns for this project.  The NAICS code for this procurement is 237110 with a size standard of $45M.  The project is planned to be issued in the Winter of 2026 with construction to begin in the Spring of 2027.  The estimated construction cost is between $500,000 - $1,000,000.

The project will be constructed within the extents of CCSFS with most work taking place in an access controlled secure area. CCSFS is an active-duty military installation located in the northwest corner of Joint Base Cape Cod, on Flatrock Hill in Bourne, Massachusetts. The objective of this project is to enhance water security and resiliency at CCSFS by constructing a new water supply well to serve as the primary source for all occupants. There are currently two (2) water supply wells at the installation drilled in overburden near the base of a glacial deposit. The scope includes all work required to turn over a fully functional and Massachusetts Department of Environmental Protection (MassDEP) compliant water supply well to the Government. The project will require the Contractor to be the Designer of Record and complete all compliance tasks in accordance with MassDEP’s New Source Approval Process, MassDEP Drinking Water Regulations 310 CMR 22.00, and MassDEP policies for developing, testing, and design, as applicable, for new public groundwater supply drinking wells. Work for this project will likely include, but not limited to, the following:

  • Design services to construct a new water supply well including all civil, survey, site, mechanical, and electrical details for integration into the existing water supply infrastructure.
  • Facilitate and coordinate all regulatory compliance actions for MassDEP approval of the new water supply well in accordance with the MassDEP New Source Approval Process as described in the MassDEP Guidelines and Policies for Public Water Systems (as amended).
  • Mobilize appropriate equipment and conduct drilling operations to develop a new well that meets project criteria such as a 400-foot depth with a gravel or filter pack design.
  • Excavate and install 200 linear feet of new potable water piping from the well head to the existing treatment building and integrate piping with existing distribution headers.
  • Install and program a new pump control panel capable of independently controlling and sequencing multiple water supply pumps.
  • During construction all facilities will remain occupied, and the Contractor must maintain continuous, safe potable water service to the installation for the duration of the project using the existing drinking water wells.

Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience in performing the work components stated above. Please include up to three (3) specific examples of the firm’s experience performing the work requirements stated above, with at least one (1) example of the firm’s experience in Massachusetts following the MassDEP New Source Approval Process such as drilling new public supply gravel-packed wells in deep overburden, prolonged pumping tests, and design and construction of active new groundwater supply water wells that required water treatment (i.e., Secondary Contaminants, organics, etc.). The projects must have been completed within the last seven (7) years. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, specifically in Massachusetts, which will be used to support the offeror’s effort, and their experience must also have been performed within the last seven (7) years. Proof of bonding capability is required. Responses are limited to twenty (20) pages.  Responses are due by July 3, 2026.  Responses should be emailed to:

Ann Murphy Adley – ann.m.adley@usace.army.mil

Phone Contact: (978) 318-8255

Interested firms shall provide the above documentation in one original form and one copy.  The Government will not pay for any material provided in response to this market survey nor return the data provided.  This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation.  The results of this survey will be considered to be in effect for a period of one year from the date of this notice. 

Government Agency URL: www.nae.usace.army.mil

Government Agency URL Description: New England District, US Army Corps of Engineers

Full description on SAM.gov

Overview

Agency:
Department of WarDepartment of the Army
Office:US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW ENGLAND.W2SD ENDIST NEW ENGLAND
Posted:June 3, 2026
NAICS:237110: Water and Sewer Line and Related Structures Construction
Last Updated:Aug 21, 2026
PSC:Not specified
Response Deadline:
Set-Aside:Not specified
Type:Sources Sought
Place of Performance:Bourne, Massachusetts

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:W912WJ26X1BVC
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentJun 3, 2026

    Construct New Public Water Supply Well at Cape Cod Space Force Station

    Notice d2b55dd3b50a46b0b85e48225a879b2c on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
Assateague Island National Seashore - REPLACE SEPTAGE RECEIVING STATION
Awarded237110No Set-Aside07/12/2026Open-
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers.
Solicitation237130No Set-Aside03/06/202603/11/2026Bourne, MA
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with minimal dis?ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en?ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa?cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con?trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera?tors, uninterrupted power supplies, critical and non-critical power distribution re?sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis?sion critical operations and impacted pro?tective HEMP barriers.
Solicitation237130No Set-Aside03/06/202603/11/2026Bourne, MA
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers.
Solicitation237130No Set-Aside03/04/202603/11/2026Bourne, MA
Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con�structed within the grounds of CCSFS in fa�cilities which are in restricted areas requir�ing enhanced security protocols. The im�pacted facilities are to remain occupied throughout construction with minimal dis�ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en�ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa�cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con�trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera�tors, uninterrupted power supplies, critical and non-critical power distribution re�sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis�sion critical operations and impacted pro�tective HEMP barriers.
Solicitation237130No Set-Aside03/03/202603/11/2026Bourne, MA

Additional Details

Solicitation Number

W912WJ26X1BVC

Archive Date

Jul 18, 2026

Office Address

CONCORD, MA, 01742-2751