GovChime

RSmeans - Intent to Award Sole Source

Overview

Response deadline
3:00 PM UTC−04:00
Posted
July 20, 2022
Notice type
Special Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
NATIONAL GUARD BUREAU
Place of performance
Arlington, VA, 22204
Last updated
Dec 4, 2025

Identifiers

Solicitation number
W9133L22Q4105
Notice ID
41dfaf91ef8b41fb964e7c5880b2310d

Description

RSmeans. Intent to Award Sole Source

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:W9133L22Q4105
  1. Special NoticeCurrentJul 20, 2022

    RSmeans - Intent to Award Sole Source

    Notice 41dfaf91ef8b41fb964e7c5880b2310d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 236220 – Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), in support of U.S. Army Materiel Command (AMC), IMCOM Directorate – Sustainment, and USAG Fort Belvoir, has a requirement for the design and construction of a project to restore and modernize Building 1809 located at 6020 30th Engineer Road, Fort Belvoir, Fairfax County, Virginia (22060-5200). The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional, modernized, and code-compliant administrative and general-purpose storage facility on the Installation. Building 1809 was placed in service on July 24, 1961, and has exceeded its original 40-year estimated useful life. The asset is a single-story (1 floor above ground, 0 floors below ground, 20 feet in height), semi-permanent concrete structure (Construction Material Code: CONC; Structure Code: S20; Roof Code: R11; Wall Code: W25) comprising a total of 26,247 Square Feet (SF) with a design capacity of 76 persons (PN). The facility is configured for dual-purpose operations: Administrative Building, General Purpose (Category Code 61050): 16,014.61 SF (Design Capacity: 76 PN), supporting Air Force / U.S. Special Operations Command (AFELM US SOCOM, UIC: FFDY01). Storage Building, General Purpose, Installation (Category Code 44220): 10,232.66 SF, supporting USAG Fort Belvoir (UIC: W4VNAA). Despite a 100% utilization rate and a Mission Critical (Readiness Tier T1) designation, the facility currently holds a Current Use Functionality Capability Code of F3, indicating a significant requirement for restoration and modernization funds to make the asset capable of meeting the function for which it is used. Furthermore, the asset holds a Facility Physical Quality Code of Q4 (Physical Quality Rating: 57), meaning the sum of all necessary restoration and modernization costs is greater than 40 percent of the Plant Replacement Value (PRV). Summary of Building 1809 Real Property & Facility Parameters: Facility Parameter Specification / Status Facility Building 1809 Location 6020 30th Engineer Road, Fort Belvoir, Fairfax County, VA 22060-5200 Date Placed in Service July 24, 1961 (Original 40-year estimated useful life exceeded) Structure & Dimensions Single-story semi-permanent concrete (CONC / S20 / R11 / W25); 20 ft height Total Gross Area & Capacity 26,247.27 SF total (16,014.61 SF Admin; 10,232.66 SF Storage) | 76 PN Readiness & Condition Codes Mission Critical (Tier T1) | Functionality: F3 | Physical Quality: Q4 (Rating: 57) Key facility deficiencies and modernization requirements include: Fire Protection & Life Safety: The building is currently classified under Facility Fire Rating Code 1 (Unsprinklered Combustible). Comprehensive fire suppression and life safety upgrades are required to meet current UFC and NFPA codes. HVAC & Mechanical Systems: While the building is serviced by water, sewer, electrical, and telephone utilities, it currently lacks air conditioning (Air Conditioning: N). Modernized HVAC and climate control systems are required to support administrative personnel and storage preservation. Accessibility & Sustainability: The facility has not yet been evaluated for ADA compliance (Code: NEVL) or Sustainability (Code: 3 – Not Yet Evaluated). Full architectural, structural, mechanical, electrical, and plumbing (MEP) modernization is needed to achieve code compliance, energy efficiency, and operational resilience. Historic Status: Determined Not Eligible for Listing (DNE, evaluated January 7, 2016). Metering: There are currently no utility metering records associated with this asset; smart utility metering integration will be required. Estimated Acquisition Magnitude: $10-12M PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: Progressive Design Build (PDB) via Other Transaction Authority (OTA). The Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority authorizes transactions other than standard contracts to carry out facility repair and construction projects – including planning, design, engineering, piloting and execution – enabling early contractor involvement, commercial pricing transparency, and schedule and cost efficiencies. Currently, the Government is evaluating conceptual requirements for the following facility modernization features: Installation of modern automatic fire suppression (sprinkler) and mass notification systems to eliminate unsprinklered combustible hazards. Complete mechanical/HVAC installation to provide full air conditioning, ventilation, and climate control across the 16,014.61 SF administrative space and 10,232.66 SF storage space. Building envelope rehabilitation (roofing, walls, structural concrete repairs) and interior reconfiguration to meet ADA accessibility and modern sustainability standards. Utility infrastructure upgrades, including advanced metering and electrical/communications modernization to support Mission Critical (T1) operations. The most recent physical existence inspection was conducted on August 28, 2023. The Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB via an OT Agreement under the authority of 10 U.S.C. § 2808a. The PDB Course of Action (10 U.S.C. § 2808a): The evaluation process for selection of the most highly qualified design-builder would be qualifications based. A streamlined, two-step Qualifications-Based Selection would occur: Step 1: White Papers/Statement of Qualifications submission. Step 2: Down selected design builders would be invited to Pitch Meetings/Presentations. The most highly qualified firm following pitch meetings would be selected to enter into negotiations. The OT Award would be two phases: Phase 1 (Design & Pre-Construction): The Government team will negotiate the price of Agreement Phase I – Design and Pre-Construction Services with the selected design-builder. work collaboratively to advance the design, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Collaborative Delivery Experience: Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects utilizing OTA. Q11. Collaborative Delivery Experience: Describe your experience executing Construction Management at Risk (CMAR), Progressive Design Build (PDB), Integrated Design and Construction (IDAC), Early Contractor Involvement (ECI) or other highly collaborative delivery methods. Fort Belvoir Building 1809 Restoration & Modernization Q12. Describe your experience/expertise with the comprehensive restoration, modernization, and MEP/fire-suppression retrofit of aging (1960s-era) military administrative and storage facilities. Q13. What are the greatest supply chain, scheduling, phasing, or technical risks you foresee on a project of this type at Fort Belvoir (particularly regarding mission continuity for T1 Mission Critical users, adding HVAC/sprinklers to an existing concrete structure, and addressing Q4 physical quality deficiencies), and how could the PDB delivery method help mitigate them? Feedback on the Acquisition Strategy & Alternatives: Q14. What project characteristics make PDB particularly advantageous or disadvantageous for this requirement? Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, phasing approaches (e.g. swing space vs. phased occupied renovation), or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? Q17. Differentiating Evaluation Criteria: To differentiate high-performing collaborative design builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery, technical approach, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation? Bonding Capability: Q18. Project Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture. SUBMISSION INSTRUCTIONS Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at: https://forms.osi.apps.mil/r/YpZAfbSSKF or via the QR Code provided in the attachment. Please submit your responses by 24 November 2026 at 1700 Eastern Time. The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach.
-Market Research11/24/2026
***ADDRESS HAS BEEN UPDATED in the LOCATION/LOGISTICS SECTION*** The U.S. Army Corps of Engineers (USACE) Louisville District is issuing this special notice to announce an Industry Day for upcoming construction requirement for Construction of a 300-member Army Reserve Center (ARC) at Defense Supply Center, Richmond, VA. The Louisville District is considering Construction Manager at Risk (CMAR) under 10 USC §2808a Other Transaction Authority for this requirement. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official Request for Qualifications (RFQ) release. INDUSTRY DAYS USACE intends to conduct an Industry Day on 19 November 2026 at 0900 Eastern Time to provide an overview of the project, potential acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and potential Construction Manager at Risk (CMAR) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official RFQ release. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future RFQ. Official Questions and Answers (Q&A) will be accepted and addressed following the release of the RFQ. Contractors and subcontractors interested in participating are requested to submit their Name, Company Name and contact information (email and phone) to the USACE Contracting Specialist no later than 1600 on 17 November 2026. Please use the information below to request Installation/Base access: Step 1: Badge Requests: To obtain pass/badge for one day or more, the contractor shall complete DBIDS pre-registration online using the following link DBIDS Pre-Enrollment or at https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page. Once pre-registration has been complete, the visitor/contractor shall record and send the QR code/alpha-numeric code as a PDF/screenshot to the COR/PM via email (if multiple people are visiting or being vetted, the contractor shall compile all QR/alpha-numeric codes into a single email) at least 5 business days prior to visit/start date. The contractor shall include requested dates, times and names of personnel in the email. Failure to provide all the above information may lead to delays in requests being processed which could result in missed site visits, meetings etc. The COR/PM will notify the contractor upon their approval or denial. If approved, the contractor will have 30 days to pick up their visitor pass or project badge. When picking up the project badge the contractor is required to present their QR or alphanumeric code along with a valid form of ID. When filling out the QR code form, for the Service Site - select All. State – Virginia. Filter – Defense Logistics Agency Richmond. Note, a valid DOD ID card (Retired military, CAC etc.) is NOT permitted to be used to enter DCSR for commercial purposes. Step 2: Send a copy of their QR codes to Steven.Hall@DLA.MIL and he can forward them to security for vetting. Usually security will get back within a day or two of the submittal and let me know if they’ve been approved or not and then they are able to come and pick up a badge at the pass office. LOCATION/LOGISTICS Industry Day Presentation Location: 6090 Strathmore Road (Bldg 70), North Chesterfield, VA 23237 (Red, brick building with a large chimney right past the visitors center when you enter the gate) NOTE: Onsite parking space may be limited, overflow parking is available in the vicinity. PROJECT OVERVIEW Project Title: Construction of Army Reserve Center (ARC) Location: Richmond, Virginia Agency: U.S. Army Corps of Engineers, Louisville District NAICS Code: 236220 PROJECT DESCRIPTION Primary facilities include a 56,500 SF Army Reserve Center and 1200 SF Unheated Storage Building. Facilities will be designed in accordance with the Army Reserve Design Guide. Supporting facilities include land clearing, general site improvements, lighting, walks, signage, curbs and gutters, storm drainage, paving, information systems, and utility connections. Sustainability/Energy and cybersecurity measures are included. All fixtures, furnishings, and equipment will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including minimum standoff distances from roads, parking areas and vehicle unloading areas. Access for individuals with disabilities will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. The project contains options such as: Bona fide need collateral equipment. The Contract Duration is estimated at 790 calendar days from Notice to Proceed on Construction Award. ACQUISITION STRATEGY – PRE-AWARD USACE, Louisville District plans to use a streamlined competitive selection process: Step 1 – White Papers/Qualification Statements: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ. Following evaluation of the qualification packages, the Government intends to down-select a target of three (3) highest qualified firms to proceed to Step 2. Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected as the Construction Manager for negotiation and award of Agreement 1 for preconstruction services. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction of the ARC, which will be added as a bilateral modification at a later date. ACQUISITION STRATEGY – AWARD The agreement would be awarded to the most qualified Construction Manager at Risk (CMAR) to provide preconstruction services and construction. Phase 1 of the CMAR agreement would include pre-construction services. The selected CMAR would act as an expert consultant to the Government, collaborating directly with USACE and the third-party Designer of Record during active design progression. The Government’s intent is to award the Phase I Agreement for Preconstruction Services prior to the 95% design review meeting. Phase 2 of the agreement would include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP). All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ. VIRTUAL PARTICIPATION OPPORTUNITY For those who are unable to attend the Industry Day event in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below: Microsoft Teams Meeting Join: https://dod.teams.microsoft.us/meet/993202545806?p=OoGJrDe3gE2XSV5cjy Meeting ID: 993 202 545 806 Passcode: aR7VH6d9
-Special Notice11/16/2026
This solicitation pertains to a Full and Open Firm Fixed-Price Contract for design-bid-build construction services in support of the U.S. Army Corps of Engineers (USACE) Southwestern Middle East District (SWM) Apache Alert Mission Complex for the Kuwait Air Force (KAF) at Ali Al Salem Airbase, Kuwait.
-Solicitation01/08/2027
Purpose: Posting the Abstract of Offerors from the bid opening for solicitation W9123626BA006, Fort Lee Vehicle Recovery Range.
-Solicitation10/13/2026
The U.S. Army Corps of Engineers (USACE) Southwestern Division, Middle East District (SWM) is issuing this Sources Sought notice for market research purposes to identify qualified and capable industry partners for an anticipated Integrated Design and Construction (IDaC) contract for the Space Campus project at Al Udeid Air Base, Qatar. The scope includes pre-construction support and construction of secure facilities adhering to Intelligence Community Directive (ICD) 705 standards. Operating within the dynamic CENTCOM AOR requires an agile, integrated contracting approach capable of rapidly accommodating technical evolution while protecting mission schedules and operational readiness.This notice is published solely for planning and market research in accordance with RFO Part 10; it does not constitute a solicitation, RFP, or commitment by the Government, nor will the Government reimburse any submission costs. Interested firms must submit capability statements by completing the questionnaire at https://forms.osi.apps.mil/r/5fVChgVRkU no later than 30 October 2026 at 5:00 PM EDT. Direct all inquiries via email to Contract Specialist Mikayla Shanholtzer (Mikayla.B.Shanholtzer@usace.army.mil) and Contracting Officer Tracy Gusukuma (Tracy.M.Gusukuma@usace.army.mil) with the subject line: MARKET RESEARCH - SPACE CAMPUS IDaC.
-Market Research10/30/2026

Additional Details

Solicitation Number

W9133L22Q4105

Archive Date

Not specified