GovChime
Notice ID: f93a7dd8f2baa9cca8de02493c3bdd2bAward NoticeAwarded

J--USACE ERDC CRREL - ANNUAL STATE OF NEW HAMPSHIRE ABOVE-GROUND AND UNDERGROUND FUEL TANK INSPECTION SERVICES

Awarded on September 24, 2014. Full description on SAM.gov.

Awarded tounder W913E5-14-P-0056 (source: SAM.gov award notice)• $14.6K

Overview

Posted
September 25, 2014
Notice type
Award Notice
NAICS
237120: Oil and Gas Pipeline and Related Structures Construction
Agency
Department of War

Notice details

Place of performance
USACE CRREL, Hanover 72 Lyme Road, Hanover NH 03755-1290 US
PSC
J: MAINT, REPAIR, REBUILD EQUIPMENT
Last updated
Oct 6, 2025
Award date
Sep 24, 2014
Award amount (SAM.gov award notice)
$14.6K

Identifiers

Solicitation number
W913E514T0034
Notice ID
f93a7dd8f2baa9cca8de02493c3bdd2b
Award number (PIID)
W913E5-14-P-0056

Description

The U.S. Army Engineer Research and Development Center (ERDC), Cold Regions Research and Engineering Laboratory (CRREL) in Hanover, NH has a requirement for the performance of annual State of New Hampshire required fuel tank inspection of the Above Ground Fuel Storage Tanks (AST) and the Underground Storage Tanks (UST) at the USACRREL facility in Hanover, NH. Services include inspection, testing, maintenance and repair.

Full description on SAM.gov

Award Overview

Award Number

W913E5-14-P-0056

Award Amount (SAM.gov award notice)

$14.6K

Award Date

Sep 24, 2014

Awardee

Awardee UEI

GQTATQRMN1L1

Original Solicitation

Notice ID: f93a7dd8f2baa9cca8de02493c3bdd2b

Posted Date: Sep 25, 2014

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Ashley Jenkins, 217-373-7297 USACE CRRAEL, Hanover

Documents

No documents available.

Lifecycle

Solicitation:W913E514T0034
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. Combined SynopsisSep 11, 2014

    J--USACE ERDC CRREL - ANNUAL STATE OF NEW HAMPSHIRE ABOVE-GROUND AND UNDERGROUND FUEL TANK INSPECION SERVICES

    Notice 93df24b08c764ddc0e9dfdc3f797b713 on SAM.gov

  2. AwardedCurrentSep 25, 2014

    J--USACE ERDC CRREL - ANNUAL STATE OF NEW HAMPSHIRE ABOVE-GROUND AND UNDERGROUND FUEL TANK INSPECTION SERVICES

    Notice f93a7dd8f2baa9cca8de02493c3bdd2b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the entirety of the tank, and replace the audible and visual alarms. o Fix the remote containment basin drainage issue. o Replace the asphalt on the NE side of the fueling facility. o Repair the refueler parking concrete. o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump. o Replace the asphalt near the loading/unloading facility with a concrete path. o Replace POL building of the same size and at the same location. o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS. o Relocate the generator that is inside the compartmentalized area.
-Solicitation12/04/2026
***This solicitation is a Small Business set-a-sided, restricted to 100% small business only.***The project includes repairs and upgrades to an existing fuel storage and dispensing facility. Work includes repairing concrete and pavement; removing water from an underground communications access box; installing an emergency fuel shutoff station and leak detection equipment; and repairing and recoating fuel system canopies, piping, and related components. Additional work includes replacing tank vents, repairing and improving grounding systems, modifying platforms to provide safe access to tank equipment, and upgrading the automatic tank gauging (ATG) system and associated controls.*****Proposal Due Date has been extended from 11/23/2026 to 12/21/2026 at 14:00 CST*****
-Solicitation11/23/2026
Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.
-Solicitation01/25/2027
The scope will include the design and construction to include the demolition of all existing fueling systems. Following demolition, the Contractor will be responsible for designing and constructing new offloads and fillstands with secondary containment, remote containment basin, required asphalt pavement, a pump shelter with snow shields, fencing, receipt piping and ATG installation.
-Market Research10/29/2026
Amendment 0002 is to provide a complete list of questions and answers from Bidder Inquiry in ProjNet. This is a total small business set-aside. All Work Complete for Tank 2186 Repair (R) including replace tank roof, repair issue piping, repair receipt piping, repair low suction piping, remove mechanical tape gauge, remove and replace spiral stairs, repair stilling well, re-install tank ATG system, repair shell manholes, replace tank chime sealant, repair containment area, repair tank grounding, repair weld spacing, and provide tank data plate. All Work Complete for Tank 2186 Maintenance (M) including replace tank and piping coatings, provide tank strapping charts, and perform final API 653 inspection.
-Solicitation10/20/2026

Additional Details

Solicitation Number

W913E514T0034

Archive Date

Nov 10, 2014