GovChime
Notice ID: 9b7bdcc089e741568a14da6233775d50Combined Synopsis/Solicitation

Alaska Backcountry Outfitter-Guide Services

Archived on February 1, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM UTC−06:00
Posted
January 12, 2024
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
Agency
Department of WarDepartment of the Army

Notice details

Office
W2R2 COLD RGNS RSCH ENG LAB
Place of performance
Fort Wainwright
Last updated
Sep 25, 2026

Identifiers

Solicitation number
W913E524Q0003
Notice ID
9b7bdcc089e741568a14da6233775d50

Description

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The solicitation number W913E524Q0003 is being issued as a Request for Quotation (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-02. The associated North American Industry Classification System (NAICS) code is 713990 – All Other Amusement and Recreation Industries which has a size standard of $9M. This requirement is a Total Small Business Set-Aside in accordance with FAR 19.502-2. The U.S. Army Engineer Research and Development Center (ERDC), Cold Regions Research and Engineering Laboratory (CRREL)’s Biogeochemical Sciences Branch (BSB) in Fort Wainwright, Alaska requires a Contractor to provide backcountry outfitter-guide services working in the eastern Brooks Range of Alaska to float (using rafts with guides) sections of either the Canning or Shaviovik River starting in a mountainous region through to the coast of Alaska in late July 2024 or August 2024. CRREL requires the outfitter to provide services for six (6) scientists with scientific gear for approximately 5-10 days (pending guidance from the Contractor indicating normal float times) including normal float trip times plus extra time for enroute sampling events. Requirement: The Contractor shall furnish all items necessary, including but not limited to all guides, rafts and rafting equipment, transportation, equipment, gear, safety equipment, operating supplies, and incidentals to perform outfitter-guide services to the Government. The Contractor shall: Obtain permits with Arctic National Wildlife Refuge, State of Alaska, and the North Slope Borough for operation in the Eastern Brooks Range and obtain all the requisite permits needed for July 2024 – August 2024. Deliver float trip services with necessary science stops in the Brooks Range of Alaska on the Canning River or Shaviovik River. Provide all logistical solutions needed for the trip starting in Fairbanks Alaska to the Canning River or Shaviovik River, and then returning to Fairbanks Alaska. CRREL also requires that the outfitter provide all the equipment (such as tents, boats, paddles, safety gear, etc.) and supplies required to shelter, transport, keep safe, and sustain the lives of the CRREL scientists in the this very remote area of Alaska. Provide emergency communication via satellite phones and mechanisms in the field to keep the phone charged / recharged. Provide guides that are familiar with bear safety and act as bear guards. Please reference the attached RFQ for full details of the requirement as well as all applicable provisions and clauses. Award will be made to the responsible offeror whose offer represents the Best Value to the Government, in consideration of all factors. The following factors will be used to determine the most advantageous offeror to the Government: 1) technical capability to provide the requested services and materials in its entirety; 2) past experience; and 3) price. A technically acceptable quote is one that clearly represents the ability to satisfy the minimum specified requirements outlined in Section C, Performance Work Statement (PWS), and the quote submission Instructions to Offerors outlined in Section L of the attached RFQ. The basis for award will be an acceptable offer, the price of which may not be the lowest. FOB Destination: CRREL, Fort Wainwright, Alaska 99703. Payment Terms: Net 30 Please provide responses to this notice, no later than Wednesday, 17 January 2024, 12:00 PM, Central Standard Time (CST) to: Kim.D.Roberson@usace.army.mil Telephone responses will not be accepted. *Note: To be eligible for award of a Government contract, vendors must be actively registered in the System for Award Management (SAM), have no active exclusions, and complete representations and certifications. For more information, review the SAM website at https://www.sam.gov.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:W913E524Q0003
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentJan 5, 2024

    Alaska Backcountry Outfitter-Guide Services

    Notice 9b7bdcc089e741568a14da6233775d50 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The Department of Transportation (DOT), Maritime Administration (MARAD), is conducting a market research for Marine Coaching Services to support the Kings Point Waterfront Program at the United States Merchant Academy (USMMA). This is a Sources Sought notice for market research purpses only. This notice is not a request for proposals or quotes; the Government will not be responsible for any costs incurred by interested parties in responding to this request. Please review the attached Performance Work Statement (PWS) and RFI questinnaires. Interested vendors should submit their responses, including a capability statement, to durba.ray@dot.gov and brian.wiley.ctr@dot.gov no later than Wednesday, July 22, 2026, at 2:00PM EDT.
42%
Market Research07/22/2026
*** 11/16/2026: AMENDMENT 07 ISSUED - SEE SUMMARY OF AMENDMENT AT BOTTOM OF POSTING*** ***SUMMARY ONLY - SEE ATTACHED COMBINED SYNOPSIS/SOLICITATION DOCUMENT FOR FULL DETAIL*** APS _ Combined Synopsis/Solicitation Brief: Combined Synopsis/Solicitation for Commercial Items Agile Professional Services ("APS”) Department of the Army Project Name: Agile Professional Services ("APS") Solicitation Number: W900KK-26-R-A023 NAICS Code: 541990 (All Other Professional, Scientific, and Technical Services) Set-Aside: Total Small Business Set-Aside Contract Type: Labor Hours/T&M 1. General Information This combined synopsis/solicitation is issued by Army Contracting Command - APG - Orlando Division to procure Agile Professional Services ("APS"). The acquisition is structured to support critical technical and professional operations under a flexible framework, to be proposed and developed by the successful offeror. Key acquisition parameters include: • Set-Aside Status: 100% Total Small Business Set-Aside. • Small Business Size Standard: $19.5M, or as defined by SBA regulations. • Primary NAICS Classification: 541990 — All Other Professional, Scientific, and Technical Services. • Contract Vehicle Type: Labor Hours/T&M 2. Solicitation Details This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This combined synopsis/solicitation is prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-06, effective August 27, 2025.and DFARS Publication Notice (DPN) July 2, 2026. As described in the attached FAR 52.212-2, The Army will adopt aspects of FAR Part 15 evaluation procedures. Considering the novel, and commercial, nature of these services this is deemed necessary to balance fairness, transparency, and competition with the interests of expediency and flexibility 3. Description of Requirement CPE ST3 has a need for Agile Professional Services (APS) support services to provide the organization with the ability to augment its Military and Government Civilian workforce in order to execute its mission. The services will be limited to providing professional support services, under a Performance Based Services model, to CPE ST3 and CPE ST3 customers for limited requirements which are related to CPE ST3’s mission. Since its inception, CPE ST3 has relied on contractor support to conduct its mission in all phases of life cycle management due to insufficient personnel within the organization to successfully perform the required services. This model of a Government footprint with a scalable contractor workforce has enabled CPE ST3 to be very flexible and agile in its mission to support the changing needs of the Army. The services to be performed will include related activities in support of all aspects of providing responsive integrated and interoperable infrastructure for simulation, training, testing, and threat solutions. APS support services are required for effective, efficient, and responsive full lifecycle management of efforts to include, but not limited to: vision statements and doctrine, development of architectures, program support (e.g., acquisition and budget planning, business and financial programming and execution, modeling, simulation, simulator, training device, and instrumentation development, documentation, fielding and execution, system analysis and integration, integrated logistics support, strategic planning, contingency and mission support, security cooperation/international relations, program oversight, independent verification validation and test evaluation, prototype development, sustainment and operations, and analysis of emerging technologies support), and subject matter experts on military tactics, techniques, and procedures. Potential areas of growth are envisioned but not limited to be in the areas of Cyber and Information Warfare, Robotics, Unmanned Vehicles, Home Station Training, Multi-Sensory Simulation, Artificial Intelligence, Hypersonics, Directed Energy, Electronic Warfare, Autonomous Systems, Multi-Domain Integration, Target and Threat Systems, Environment Modeling, Human Performance Training, Security Cooperation, Nuclear Engineering, and Medical Training. The critical performance requirement is the successful development and transition of CPE ST3 from a traditional, staffing-based support model to a task-based, outcome-driven Agile delivery framework that is to be developed by the Performer. Success will be measured by the contractor's ability to develop and iterate, through performance under the resultant contract, a framework that both provides the following, and is able to be replicated across future requirements. 4. Period of Performance / Performance Locations: Total Performance Period shall not exceed 66-months: Base Period – (15-Mar-27 to 14-Sep-27) Agile Development and Transition In Option Period 1 – (15-Sep-27 to 14-Sep-28) – Enterprise Performance Option Period 2 – (15-Sep-28 to 14-Sep-29) – Enterprise Performance Option Period 3 – (15-Sep-29 to 14-Sep-30) – Enterprise Performance Option Period 4 – (15-Sep-30 to 14-Sep-31) – Enterprise Performance Option Period 5 – (15-Sep-31 to 14-Mar-32) – Enterprise Performance and Transition Out Option Period 6 – (15-Mar-32 to 14-Sep-32) – Option to Extend the Term of Service under FAR 52.217-8 * Work will be performed at Government facilities, Contractor facilities, and Remote locations. Primary Government sites include Orlando, FL, and Redstone Arsenal, AL (including 24/7 operations). Additional Government sites include: Fort Campbell, KY; Fort Hood, TX; Fort Drum, NY; Fort Irwin, CA; Fort Polk, LA; Fort Rucker, AL; Fort Bragg, NC; Hohenfels, Germany; and Camp Humphreys, South Korea. 5. Applicable FAR Provisions/Provisions: See Attachment 7. The provisions and clauses apply to this acquisition and are incorporated by reference or full text as applicable. The full text of the FAR and DFARS clauses may be accessed electronically at https://www.acquisition.gov/. 6. Proposal Submission Instructions Phase II responses to this solicitation are due by 30 November 2026 / 10:00am (Eastern). Submission due dates for all subsequent Phases will be issued via Advisory Notifications / Invitations. a. Electronic Submission Requirement All proposals must be submitted electronically via the Department of Defense Secure Access File Exchange (DoD SAFE) application at https://safe.apps.mil . Hardcopy submissions or proposals sent directly via standard email will not be accepted. b. DoD SAFE Link Upon issuance of Phase II Notification / Invitation, the Government will be issuing each respective Offeror (2) DoD SAFE links. Links will be sent to the POC identified in the Phase I Cover Letter: DoD SAFE Link #1 - Pick Up - JIRA Data: Each Offeror will receive an email from DoD SAFE with a link in which to download all the JIRA Data and Instructions. DoD SAFE Link #2 - Drop Off - Phase II Proposal Submittal: Each Offeror will receive a secondary email from DoD SAFE with a link to upload all their respective documents for Phase II, including the final PowerPoint Presentation and their attendee list for Oral Presentations. Link Validity: Once the Government issues the pick-up and drop-off, each Offeror will receive automated emails from DoD SAFE containing the unique links and instructions. These links are valid for exactly 14 days from the date of receipt. WARNING: The Government will not be held responsible for late proposals resulting from an offeror's failure to submit a drop-off by the established deadline. c. Submission Protocol Upon receipt of the automated DoD SAFE email link: Click the link inside the automated email to access the secure upload portal. Upload all required solicitation attachments, ensuring they are named clearly. Click "Submit" or "Drop-off" to complete the upload process. d. Timeliness of Submissions The Submission Timeframe: For a submission to be considered timely, the completed DoD SAFE upload must be finalized, and the automated system notification must arrive in the Government recipients' inboxes on or before the official Proposal Due Date and Time. Upload Buffer: Depending on your network speed and the size of your proposal volumes, uploads can take time. Offerors are highly encouraged to start their upload several hours before the deadline. Technical difficulties, network latency, or Offeror delays in upload initiation will not be used as a justification to accept late submissions. * Late Submissions: Late submissions will be handled in accordance with FAR 52.212-1(f). See FAR 52.212-1, Instructions to Offerors — Commercial Items; for proposal submission instructions. 7. Additional Information i. Questions: The deadline to submit questions for this RFP has passed. ii. Security Clearance Requirements: See DD254 for specifics. a. Probable Facility Clearance without Storage b. Probable Secret, Top-Secret, and TS/SCI requirements for certain employees. 8. Attachments: i. Statement of Objectives (SOO), dated 8 September 2026 ii. FAR 52.212-1 – Instructions to Offerors - Proposal Submission instructions iii. FAR 52.212-2 – Evaluation Criteria – Evaluation Plan iv. Wage Determinations a. WD 2015-4377 REV 33 20260820 NC b. WD 2015-4553 REV 31 20260730 FL c. WD 2015-4603 REV 34 20260820 AL d. WD 2015-4631 REV 34 20260812 AL e. WD 2015-4719 REV 34 20260812 KY f. WD 2015-5197 REV 33 20260812 LA g. WD 2015-5237 REV 32 20260812 TX h. WD 2015-5629 REV 29 20260513 CA i. WD 2015-5775 REV 32 20260812 NY v. PWS Template vi. QASP Template vii. Provisions and Clauses viii. CDRLs a. A001 – Contractor’s Progress and Status Report b. A002 – Phase-Out Transition Plan c. A003 – Agile Dashboard d. A004 – Agile Management Plan ix. DD 254 a. SAP Addendum (incorporated into Attachment 9 (“ix.”)) b. SCI Addendum (incorporated into Attachment 9 (“ix.”)) x. APS Pricing Workbook xi. Army DSO JIRA Settings (TO BE PROVIDED PRIOR TO PHASE II PROPOSAL SUBMISSIONS) xii. Compliance Matrix (Government Format) Acknowledgement of Amendments: 1. Amendment 01: The purpose of this amendment was to provide Attachment-6_Quality_Assurance_Surveillance_Plan_(QASP)_Proposal_Template_-_APS_20260903 2. Amendment 02: The purpose of this amendment was to do provide responses to Industry questions, to revise the Combined Synopsis/Solicitation, to provide for revised submission dates, and to provide updated Attachments 1, 2, 3, 4.e, 5, and 10. 3. Amendment 03: The purpose of this Amendment was to update the proposal submission instructions incorporating submission requirements and instructions for the use of DOD SAFE as the sole method of submission. 4. Amendment 04: The purpose of this amendment was to update the Combined Synopsis Solicitation, Proposal Submission Instructions -1, Evaluation -2, and the Pricing Workbook for clarity and changes to Phase II information. This amendment does NOT impact the Phase I Proposal Submission Requirements / Deadline. 5. Amendment 05: The purpose of this Amendment was to update the following: 1) Revise Section 7 (Proposal Submission Instructions) of the Combined Synopsis/Solicitation Attachment, updating the DoDSAFE "drop request" date, updating the submission due date; and 2) Revise Section 6 of the SAM.Gov posting to reflect the above. 6. Amendment 06: The purpose of this Amendment was to update the following: a) Revise Attachment 10 – APS Pricing Workbook with revised Periods of Performance, b) Revise and incorporate the Government’s required template for Attachment 12 – Compliance Matrix, c) Revise Attachment 02 - FAR 52.212-1 – Instructions to Offerors - Proposal Submission instructions with the Government’s required template usage for Attachment 12 – Compliance Matrix, d) Revise Attachment 03 - FAR 52.212-2 – Evaluation Criteria – Evaluation Plan with the Government’s required template usage for Attachment 12 – Compliance Matrix, and e) Revise Section 5 of the SAM.Gov posting for the Period of Performances and Government’s Tentative Milestone Schedule. 7. Amendment 07: The purpose of this Amendment was to update the following: a) Update the Combined Synopsis Solicitation and Proposal Submission Instructions -1 to reflect revised Phase II guidance. b) Revise Section 6 of the SAM.Gov posting to reflect the above **SUMMARY ONLY - SEE ATTACHED COMBINED SYNOPSIS/SOLICITATION DOCUMENT FOR FULL DETAIL***
37%
Combined Synopsis11/30/2026
The175th Wing is implementing a local/state level Drug Demand Reduction Program service contract for the Maryland Air National Guard. This contract will provide trained personnel to perform Drug Testing Program Administrative Manager and observer roles to support the installation DDR Program.The purpose of this amendment is to add the SCA WD 2015-4265 Rv. 35. Additionally, updating the submission of quotes to PIEE on 20 Nov 2026 instead of 175WG.MSC.Org@us.af.mil.
37%
Combined Synopsis11/20/2026
**This is an amendment to the below offer. The purpose of the amendment (Amendment 2) is to provide an addendum to Section L, updated PWS, and updated Price Schedule. The document with answers to vendors' requests for information is posted.** This is an offer for a to provide MRRIC Chair professional services, in close coordination with MRRIC, the lead agency, and one or more meeting facilitators. Services include supporting the diverse Committee members as an impartial leader in enabling members to articulate their underlying interests and perspectives and help the Committee formulate consensus-based recommendations to the lead agency as it relates to the USACE MRRP and assist the USACE in planning and leading constructive MRRIC engagements per the Performance Work Statement (PWS)
37%
Combined Synopsis11/24/2026
The U.S. Army Corps of Engineers (USACE), Caribbean District issues this Request for Proposals (RFP) to award an Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for Quality Assurance Services across Puerto Rico and the U.S. Virgin Islands. This procurement follows the presolicitation notice previously synopsized under solicitation number W51DQV26RA007. The contractor shall provide comprehensive quality assurance oversight supporting Civil Works, International and Interagency Services (IIS), and Military Construction (MILCON) projects, including navigation, flood risk management, coastal protection, environmental restoration, water resources, and military or federal installations. Services encompass monitoring contractor compliance with plans and specifications, reviewing engineering submittals and technical reports, conducting on-site field inspections of dams, levees, berms, cutoff walls, pump stations, flood control gates, and electrical systems, and performing certified sampling and laboratory testing of soil, concrete, and water. Contract personnel shall also perform daily safety monitoring and prepare daily quality assurance inspection reports. This action is a total small business set-aside under NAICS code 541990 (All Other Professional, Scientific, and Technical Services) with an applicable small business size standard of $19.5 million. The contract ordering period comprises a one-year base period, four 12-month option periods, and one six-month option period, not to exceed a total duration of five years and six months, with a maximum program capacity of $35 million across the contract life.
37%
Solicitation11/20/2026

Additional Details

Solicitation Number

W913E524Q0003

Archive Date

Feb 1, 2024

Office Address

HANOVER, NH, 03755-1290