GovChime
Notice ID: 43a5c276a8ab464fa717c5f6b194da6fCombined Synopsis/SolicitationArchived

Riehle UTM Control System Upgrade

Archived on May 29, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 PM CDT
Posted
May 8, 2025
Notice type
Combined Synopsis/Solicitation
NAICS
333517: Machine Tool Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
W2R2 COLD RGNS RSCH ENG LAB
Place of performance
Hanover, NH, 03755
Last updated
Nov 13, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W913E525Q0007
Notice ID
43a5c276a8ab464fa717c5f6b194da6f

Description

This combined synopsis/solicitation for commercial items prepared in accordance with the format at FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested. The solicitation number W913E525Q0007 is being issued as a Request For Quotation (RFQ). The associated North American Industry Classification System (NAICS) code is 333517 Machine Tool Manufacturing, was determined to best represent this requirement. The U.S. Army Engineer Research and Development Center (ERDC), Cold Regions Research and Engineering Laboratory (CRREL) requires an upgraded control system for their Riehle 300kip Universal Testing Machine (UTM). Specifications. Relevant details of the frame to be upgraded as well as the requirements for the upgrade are as follows: Existing Frame Specifications Riehle FH-300 300,000lb design load capacity 11.2-inch piston diameter 6-inch piston stroke 208VAC 3-phase power required for crosshead positioning motor (1.5 HP 4.8A) 2. Unit requirements: Automatic servo-hydraulic system Dual Load Ranges 300,000lb ( 0.5% accuracy of reading) 25,000lb ( 0.5% accuracy of reading) via auxiliary load cell or secondary pressure transducer Maximum piston movement rate of at least 2 inches per minute Real time display of load and strain/position measurements Minimum of 6 preprogrammed and password protected test methods Load, position, and strain rate control capability Servo control profiles must include ramp to break, sawtooth, ramp and hold Ability to download data to PC for analysis Minimum of two (2) auxiliary simultaneous strain input channels compatible with Epsilon concrete axial and circumferential extensometers Pendant control for crosshead positioning and platen jog Movable console for control interface and hydraulic components, including flexible hoses for attachment to frame Fixture for testing concrete beams up to 6 x6 x20 according to ASTM C78 Control system must accept either 208VAC 3 Phase power or 120VAC single phase power Equipment shipped to CRREL, and on-site installation, setup, and calibration services shall be included Please reference the attached RFQ W913E525Q0007 for instructions and applicable provisions and clauses. The following factors shall be used to evaluate offers; 1.) Technical capability to fulfill the Governments requirements in its entirety, 2.) Total quoted price (including shipping FOB Destination to Hanover, NH 03755-1920) and 3.) Proposed delivery schedule (lead time) and installation service date. Award will be made to the responsible offeror whose quote represents the lowest price technically acceptable to the Government, in consideration of all factors. FOB Destination: CRREL Hanover, NH 03755-1290 Payment Terms: Net 30 Please provide responses to this notice, no later than Wednesday, 14 May 2025, 12:00 PM, Central Daylight Time (CDT) to: Tomeka.J.McNeely@usace.army.mil Telephone responses will not be accepted. *Note: To be eligible for award of a Government contract, vendors must be actively registered in the System for Award Management (SAM), have no active exclusions, and complete representations and certifications. For more information, review the SAM website at https://www.sam.gov.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Files (2)

  • B08.02 Questions and Answers.pdf

    108 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • B08.02 RFQ W913E525Q0007.pdf

    636 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Riehle UTM Control System Upgrade

    Notice 09f5052a5ab14681a2d3e68609c6a135 on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    Riehle UTM Control System Upgrade

    Notice 43a5c276a8ab464fa717c5f6b194da6f on SAM.gov

  3. 6
    Version 6Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    Riehle UTM Control System Upgrade

    Notice e13ebd0cfb804b32b750edefb1204a2d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W913E525Q0007

Archive Date

May 29, 2025

Office Address

HANOVER, NH, 03755-1290