Notice ID: 887d7510faf6582f681180ce9dedad1bSolicitation
54--The Regional Contracting Office (RCO) - Bogota has a requirement for a Prefabricated Building for the United States Military Group - Colombia (USMILGP-CO).
Archived on September 21, 2011. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- September 6, 2011
- Notice type
- Solicitation
- NAICS
- 332311: Prefabricated Metal Building and Component Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- 0410 AQ HQ CONTRACT
- Place of performance
- Bogota Branch (PARC Americas 410th CSB) KO Directorate of Contracting , Unit 5136 US Embassy Colombia APO AA 34038-0008 CO
- PSC
- 54: PREFAB STRUCTURES/SCAFFOLDING
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- W913FT11T0119
- Notice ID
- 887d7510faf6582f681180ce9dedad1b
Description
The Regional Contracting Office (RCO) - Bogota has a requirement for a Prefabricated Building for the United States Military Group - Colombia (USMILGP-CO). The contractor will be responsible for shipping the items to Villavicencio, Colombia within 45 days after date of contract award. Award will be conducted under the provisions of FAR Part 12 Acquisition of Commercial Items and FAR Part 13 Simplified Acquisition Procedures. The solicitation will be posted on ASFI/FBO and the U.S. Embassy - Bogota contracting website on or before 6 September 2011. It is the responsibility of the prospective offeror to monitor the website for the release of amendments (if any) or other information pertaining to the solicitation. Inquiries may be made to the contract specialist via e-mail at: mateusr@tcsc.southcom.mil OR annabelle.miller@us.army.mil FSC CODE: 5410 NAICS CODE: 332311
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Rosalba Mateus, 5713832552 Bogota Branch (PARC Americas 410th CSB)
Documents
No documents available.
Lifecycle
Solicitation:
W913FT11T0119- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 6, 2011
54--The Regional Contracting Office (RCO) - Bogota has a requirement for a Prefabricated Building for the United States Military Group - Colombia (USMILGP-CO).
- SolicitationCurrentSep 6, 2011
54--The Regional Contracting Office (RCO) - Bogota has a requirement for a Prefabricated Building for the United States Military Group - Colombia (USMILGP-CO).
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Prefabricated steel sheds with Installation Labor Solicitation | 56% | Combined Synopsis | 11/16/2026 |
SOLICITATION NOTICE: The 173rd Fighter Wing Mission Support Contracting Office is seeking a Prefabricated Shelter, prefabricated or precast, for delivery and placement at Kingsley Field Air National Guard Base in Klamath Falls, Oregon 97603. | 56% | Solicitation | 06/19/2026 |
Climate Controlled Storage Building | 55% | Combined Synopsis | 09/02/2026 |
Climate Controlled Storage Building | 55% | Combined Synopsis | 09/02/2026 |
The chemical storage building must meet several specifications for construction, safety, and utility. The required minimum dimensions are 42 feet in length, 8 feet in width, and 8 feet 3 inches in height. Access shall be provided by a 60-inch by 80-inch set of double doors, with at least one 36-inch active leaf, centered on one of the 42-foot walls and secured with a padlock-compatible handle. For spill containment, the building must include a sump with a minimum capacity of 1200 gallons.The structure must feature a robust fire-rated design, with walls tested by Intertek for a minimum 4-hour rating and a roof tested for a minimum 3-hour rating. Electrical specifications include a 12-space, 100-amp NEMA 3R main breaker panel (120V/240V), two Class 1, Division 2 explosion-proof LED light fixtures with a switch for the interior, and a dust/vapor-resistant exterior light with a photocell installed outside the hazard zone. Ventilation will be handled by an explosion-proof exhaust system rated for 335 CFM or higher, suitable for petroleum-based storage and compliant with all NFPA/UFC codes, complete with an indicator light and an emergency shut-off switch.For safety and functionality, the building shall be equipped with a grounding kit including an 8-foot ground rod, 10 feet of cable, and a clamp. The interior will be furnished with three-tier, 5-foot-long shelves that are 14 inches deep with a 2-inch lip. A non-perforated, skid-resistant steel ramp, measuring at least 52 inches wide by 72 inches long, must be included. Additionally, the unit shall come with three 10-pound ABC dry chemical fire extinguishers: two installed inside on either side of the door, and one mounted outside in a weatherproof cabinet. The completed chemical storage building is to be delivered to Building P-91, Railroad Street, Fort Drum, NY 13602. | 55% | Combined Synopsis | 08/27/2026 |
Additional Details
Solicitation Number
W913FT11T0119
Archive Date
Sep 21, 2011