GovChime

36--1ea 30 ton Boom Truck - LCS funded Shall be delivered within 150 days after the receipt of order Door to Door Delivery, Pohang City, Korea

Overview

Response deadline
6:00 AM UTC+01:00
Posted
October 27, 2014
Notice type
Solicitation
Agency
Department of WarDepartment of the Army

Notice details

Office
0411 AQ HQ CONTRACT AUG
Place of performance
411th CSB (PARC Korea) Unit #15289, APO AP 96205-5289 UF
PSC
36: SPECIAL INDUSTRY MACHINERY
Last updated
Dec 5, 2025

Identifiers

Solicitation number
W91QVN15R0004
Notice ID
e0326a414af6abe84fbd34d61c4c2f1b

Description

1ea 30 Ton Boom Truck Crane Manufacturer: Junjin /Product No.: JK-300T (Brand Name or Equal) 1.General Requirements : 1)Crane Capacity: maximum 30 ton or more at 2.44m or higher 2)Boom: 5 Section, from 9.1 up to 35.1m 3)Gross Vehicle Weight: 25.5 ton (+/-1% acceptable) 4)Max Traveling Speed: at least 90km/h at maximum speed 2. Crane Requirements 1)Telescopic boom: 5 Sections full power synchronized telescoping boom of pentagonal box construction. The synchronization system consists of a telescopic cylinder, extension and retraction cables. Fully retracted length: 9.1m/ fully extended length: 35.1m 2)Lattice-type jib Single lattice type. Dual offset (5 ,30 )type Stored side base boom section. Single Sheave at jib head. Jib length: 8.5m 3)Elevation: -By a double-acting hydraulic cylinder, fitted with holding valve -Elevating angle: .-8 - +80 (+/-1% acceptable) 4)Main winch Hydraulic axial piston motor through winch speed reducer. Equipped with automatic brake (neutral brake), counterbalance valves, cable follower Single Lie Pull: 42.2 KM(4,138kgf) Wire Rope: Spin-resistant type Single Line speed: 115m/min(at 3rd layer) Diameter X Length : 16mm X 150m 5)Hook Main Hook: 30 tons capacity, 4-sheaves, swivel type hook with safety latch Auxiliary hook: 5 tons capacity, swivel type hook with safety latch for single line use 6)Swing(Swing Speed : at least 2.5 rpm) Hydraulic axle piston motor driven through planetary swing speed reducer Continuous 360 full circle swing on ball bearing slew ring. Enable to select power-controlled or free swing Swing lever is fitted with a horn switch. Equipped with hand-operated swing brake. 7)Hydraulic system Pumps: Quadruple gear pump driven by carrier engine through PTO Control valve: Multiple valves actuated by joystick with integral pressure relief valves. Circuit: Equipped with air cooled type oil cooler Hydraulic oil tank capacity: 350 liter (+/-1% acceptable) Filters: Return line filter 8)Crane Control: By 4-control joystick based on ISO Standard layout 9)Superstructure cabin Steel construction with open door access and safety glass windows opening at sides. Cloth covered reclining seat with headrest is height-adjustable and back-and-for the adjustable. Equipment: Engine start and stop switch Accelerator lock button Electric windshield wiper and electric sky-light wiper 10)Safety Devices Boom angle indicator Pendent type over-winding cutout Winch automatic fail-safe brake Hook Safety latch Pilot check valves Holding valves Counterbalance valves Hydraulic pressure relief valves Front jack overload alarm Spring Center system (Control levers) 11)Automatic Moment Limiter (Model: JASS-BT) Main unit in crane cab gives audible and visible and visual warning of approach to overload. Automatically cuts crane motions before overload. With working range limit function. Working area for each outrigger position is given separately. Eight Functions are constantly displayed. Digital Liquid crystal display: Boom angle Either boom length or potential hook height Actual working radius Actual hook load Permissible load Either jib offset angle or jib length Bar graphical display: Either moment as percentage or main hydraulic pressure and accumulator pressure (Display changes by alternation key) 12)Hydraulic outrigger 4-hydraulically operated outriggers. Each outrigger controlled simultaneously or independently from either side or carrier. Equipped with sight level gauges. All cylinders fitted with pilot check valves. Extended with Fully: .7,200mm, Middle: 5,540 mm, Minimum: . 2,200mm Float size (Diameter): 600 mm 13)Front Jack A fifth hydraulically operated outrigger jack. Mounted to the front frame of carrier to permit 360 lifting capabilities. Hydraulic cylinder fitted with pilot check valve. Float size (Diameter): 240 mm 14)Standard Equipment Control pedals for telescoping and auxiliary winch. 3 working lights External lamp (AML) Sun visor Cap floor mat 3.Carrier RequirementsK Shall be capability to withstand all functionality of the crane in number 2. 1)Specify Manufacturer 2)Type: Commercial Truck, Left-hand mounted cab on 3-acle chassis Drive type 6x4x2, Over Middle Wheel Base 3)Engine -Type: 4 Cycle, 6cylinder, Water cooled Diesel Engine -Output Power: at least 330KW (450ps)/1,900rpm Max. Torque: at least 2,107 Nm (215kgfm)/1,300rpm The engine emission at least complies with Euro 5 4)Clutch: Dry single plate, hydraulically operated clutch release mechanism with air assisted Booster 5)Transmission: 16 Forward and 2 Reverse Speeds 6)Axle Front: Reverse-elliot type, I-beam Rear: Full floating type 7)Suspension Front: Semi-elliptic leaf spring Rear: parallel leaf spring type 8)Steering: Mechanical steering system with hydraulic booster 9)Brake Service Brake: Foot operated full air brake on all wheels, dual air line system, internal Jake and Intarder Brake Auxiliary Brake: Electro-Pneumatic operated exhaust brake Parking Brake: Mechanically operated by hand brake lever, Internal expanding duo-serve shoe type acting on drum at transmission case rear Emergency: Pneumatically controlled spring brake, Acting on all rear axles. 10)Electric System: 24V DC, 2 batteries of 12v/ Alternator : 24V-80A 11)Fuel Tank: at least 400 Liter 12)Carrier Cabin: Steel construction, one sided 2-persons type 13)Tires: 365/70R 22.5-20PR, suitable for heavy-duty vehicle. Universal and easy replacement.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Yi, Sung Yong, 315-724-6604 411th CSB (PARC Korea)

Documents

No documents available.

Lifecycle

Solicitation:W91QVN15R0004
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationOct 27, 2014

    36--1ea 30 ton Boom Truck - LCS funded Shall be delivered within 150 days after the receipt of order Door to Door Delivery, Pohang City, Korea

    Notice 29e55dd6224efeb222d1c5aef606360c on SAM.gov

  2. SolicitationCurrentOct 27, 2014

    36--1ea 30 ton Boom Truck - LCS funded Shall be delivered within 150 days after the receipt of order Door to Door Delivery, Pohang City, Korea

    Notice e0326a414af6abe84fbd34d61c4c2f1b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W91QVN15R0004

Archive Date

Dec 10, 2014