Notice ID: 614010aefbae4ff5bad10e6cbe333d93Combined Synopsis/Solicitation
12K # Sling Load Training Block
Archived on September 22, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM UTC−08:00
- Posted
- August 30, 2023
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238120: Structural Steel and Precast Concrete Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W7MU USPFO ACTIVITY AK ARNG
- Place of performance
- Jber, AK, 99505
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- W91ZRU23R0013
- Notice ID
- 614010aefbae4ff5bad10e6cbe333d93
Description
Previous publication received no responsive offers. This is a repost under Total Small Business Set-Aside. Please see revised "Combo Synopsis_Solicitation Sling Load Block" document in Attachments.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
W91ZRU23R0013- Combined Synopsis
- 2×Combined SynopsisCurrentAug 23, 2023
12K # Sling Load Training Block
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
THIS IS A REQUEST FOR INFORMATION (RFI) ONLY AND YOUR RESPONSE IS NOT AN OFFER. SERIOUS INQUIRIES ONLY AND SUBMISSIONS MUST BE FROM A US-BASED CONTRACTOR. THIS IS NOT A REQUEST FOR QUOTES (RFQ). NO SOLICITATION IS AVAILABLE AT THIS TIME. THIS REQUEST FOR INFORMATION DOES NOT COMMIT THE GOVERNMENT TO PAY ANY COSTS INCURRED IN PREPARATION OF ANY SUBMISSION TO THIS NOTICE, OR TO CONTRACT FOR ITEMS/SERVICES. This Request for Information (RFI) is issued solely for information and planning purposes and does not constitute a solicitation. All information received in response to this RFI marked Proprietary will be handled accordingly. Responses to the RFI will not be returned. Information provided in response to this RFI will be used to assess tradeoffs and alternatives available for determining how to proceed in the acquisition process for a solution. In accordance with RFO 15.101(c)(2), responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. BACKGROUND/PURPOSE: The U.S. Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) is conducting market research to determine sources’ competencies and capabilities to execute the on-site fabrication and final assembly of a three-bay, monolithic reinforced concrete High-Performance Magazine (HPM) structure. This is for a test structure for experimental purposes only and in the course of testing the structure will be completely destroyed and the site will be retrograded. The scope requires the full, in-situ assembly of the HPM structure at a designated Government test range at Fort Polk, LA. The process involves mobilizing all materials and equipment to the site, erecting temporary formwork systems, installing reinforcing steel cages, and placing concrete to form the final test structure according to the attached Description of Requirement (DOR). This is not a pre-cast or modular system; the final deliverable is the fully assembled and cured structure fabricated at its final location. The primary materials to be procured and processes to be performed are listed below. Reinforcing Steel (Rebar): Procure, deliver, and install prefabricated steel reinforcement into a intergrated cage within the formwork Cast-in-Place Concrete: Procure and received ready-mix concrete; place material into the erected formwork; perform consolidation, finishing and curing. Structural Sand Fill: Procure, deliver, and install sand into desiginated wall cavities post-concrete. Concrete Formwork: Fabricate or procure formwork panels; perform on-site erection, bracing, and subsequent stripping of the complete system for walls, slabs, and doors. Reinforced Concrete Doors: Perform on-site formwork erection, rebar installation, and concrete placement for three separate door components. Embedded Items: Procure and install all required embeds, sleeves, and plates within the formwork prior to concrete placement. A DRAFT Description of Requirement (DOR), which includes a detailed description of the structure, is attached. Please note this is subject to change. The purpose of this Request for Information (RFI) is to obtain information on the availability and capability of vendors to procure the necessary raw materials, provide shipping of materials and equipment to Fort Polk, LA, and perform the complete on-site fabrication and assembly of the structure to specification. Additionally, this RFI seeks to determine industry interest in participation for market research purposes before a Request for Quote (RFQ) is released for these requirements. Not responding to this RFI does not preclude participation in any future RFQ or RFP, if any is issued. If a solicitation is released, it will be synopsized on the SAM.gov website. It is the responsibility of the potential offerors to monitor this site for additional information pertaining to this requirement. Respondents are requested to review the attached DRAFT DOR and submit responses to the following questions: 1. Contact information: Interested organizations should respond by providing the Government the following information: Company name, Address, Point of Contact, business title, Telephone number, Email address, Company Cage Code, Primary NAICS, Business Size, i.e., Large, Small (if small, state your category). Current Registration in SAM, Webpage address. 2. Capabilities Statement: A description of capabilities in providing 1) the minimum required items and capabilities described in the RFI and Draft DOR to the specified location(s) and 2) Experience. Previous procurement information, including contract numbers and customers, is recommended. 3. Business Status (based on NAICS 238120): Please indicate the business status of your company (Socio-Economic Factors: 8(a), HUBZone, Service-Disabled Veteran-Owned Business, Small Disadvantaged Business etc.). 4. Answer the following Questions: All interested contractors are requested to provide comprehensive written responses to the questions below. Question #1- Project Experience: Provide at least two (2) and no more than four (4) examples of projects completed by your company within the last 7 years that are of a similar scale and complexity to the HPM structure. For each project, provide the following details: Project Name and a brief description. Final concrete compressive strength(s) and total cubic yards placed. Approximate final reinforcing steel density (lbs/CY). A summary of your company's role (e.g., Prime Contractor, Concrete Subcontractor). Question #2- Self-Consolidating Concrete (SCC) Experience: The requirement is for 10,000 PSI SCC. Describe your company's experience with high-strength SCC. Specify your approach to: Mix design submittal and verification. Managing the high fluid pressure of SCC on formwork systems. On-site Quality Control testing Question #3- Formwork Systems: This project requires a robust, engineered formwork system. Does your company have in-house engineering capability to design and develop formwork plans, or is this service subcontracted? Please describe a challenging formwork scenario your company has successfully managed on a past project. Question #4- Reinforcing Steel: The project specifications require continuous, non-spliced rebar in many areas. Describe your company's experience and methods for installing long, heavy, and continuous reinforcing steel in congested, multi-layered wall and slab assemblies. Question #5- Core Competencies (Self-Perform vs. Subcontract): Please indicate which of the following core activities your company typically self-performs versus subcontracts: Heavy Concrete Formwork Design and Erection Reinforcing Steel Installation Concrete Placement and Finishing Earthwork and Site Logistics Materials QC Testing Question #6- Overall Capability: After reviewing the Description of Requirement, does your company have the capability to procure all materials and fully execute the on-site fabrication and assembly of the HPM structure as specified? If not, please specify which items or processes cannot be provided and why. Interested vendors must provide the above information no later than 3:00 PM Central Standard Time (CST) on 04 November 2026. Responses must be emailed to Shinita Jordan at Shinita.M.Jordan@usace.army.mil AND Sonia Boyd at Sonia.J.Boyd@usace.army.mil. Any questions related to this notice must be submitted in writing to Shinita Jordan and Sonia Boyd. Verbal questions will NOT be accepted. The Government will not reimburse companies for any costs associated with the submissions of their responses. | 38% | Market Research | 11/04/2026 |
***UPDATE 9/21/26: Uploaded Amendment 0002. This Amendment incorporates Am0002 to the Specifications. Also uploaded the Site Visit sign in sheet from 9/3/26. ***UPDATE 9/2/26: Uploaded Amendment 0001. This Amendment updates Section 00 22 00 to include the Small Business Participation Proposal Worksheet.*** The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for Gavins Point Intake Crane Rail Replacement. The solicitation will close on 02 October 2026. The solicitation is(Unrestricted and Open to Both Large and Small Business Participation. A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation via FAR Clause 52.236-27. The site visit is scheduled for 03 September 2026. This project will involve removal and replacement of the Gavins Point Powerhouse Intake crane runway rail located near Yankton, South Dakota. The 80-ton Gavins Point Intake Gantry Crane rail shall be installed and aligned to Crane Manufacturers Association of America, CMAA 70 standards. The total length of the rails is 328 ft x 2 centerline of rail to the powerhouse wall. The work will include an initial survey of the rail alignment, existing grout pocket condition, demolition and removal of existing intake crane rail and components, rail clips, asphalt, base plates, and non-shrink grout. Demolition and removal of the existing concrete anchors will be based on the concrete imaging reports, and the grout pocket condition assessment between each anchor pair along the deck. For bidding purposes, it is assumed 80 percent of the existing anchors will be replaced and all concrete anchors at joint bars will be replaced. The contractor will provide anchors suitable for use in cracked concrete and under seismic loading. Once the rail and hardware are replaced and aligned to the required standards the grout pockets will be filled with two-component aliphatic polyurethane elastomer grout along the full length of the intake crane runway as shown on the drawings. The sequencing of demolition and installation of the crane rails must minimize project time without an operational intake crane and typically progress from one side of the dam to the other with the transfer of the crane from old to new rail during completion of the final rail segment. The Contractor will be required to commence work upon receipt of contract award and complete the work 365 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. The estimated construction cost of this project is between $1,000,000 and $5,000,000. The Primary North American Industry Classification System (NAICS) code for this solicitation is 238120, Structural Steel and Precast Concrete Contractors, with a size standard for Small Business of $19M. All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the solicitation). The Contracting Office is USACE Omaha District, 1616 Capital Ave, Omaha, NE 68102. The Place of Performance is Gavins Point Project, Crofton, NE 68730. | 38% | Solicitation | 10/02/2026 |
On or about 10 August 2026, the Government intends to issue a solicitation for Gavins Point Crane Rail Replacement. The solicitation will close on or about 29 September 2026. The solicitation is Unrestricted and Open to Both Large and Small Business Participation. A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via FAR Clause 52.236-27. The site visit is tentatively scheduled for 26 August 2026.This project will involve removal and replacement of the Gavins Point Powerhouse Intake crane runway rail located near Yankton, South Dakota. The 80-ton Gavins Point Intake Gantry Crane rail shall be installed and aligned to Crane Manufacturers Association of America, CMAA 70 standards.The total length of the rails is 328 ft x 2 centerline of rail to the powerhouse wall. The work will include an initial survey of the rail alignment, existing grout pocket condition, demolition and removal of existing intake crane rail and components, rail clips, asphalt, base plates, and non-shrink grout. Demolition and removal of the existing concrete anchors will be based on the concrete imaging reports, and the grout pocket condition assessment between each anchor pair along the deck. For bidding purposes, it is assumed 80 percent of the existing anchors will be replaced and all concrete anchors at joint bars will be replaced. The contractor will provide anchors suitable for use in cracked concrete and under seismic loading. Once the rail and hardware are replaced and aligned to the required standards the grout pockets will be filled with two-component aliphatic polyurethane elastomer grout along the full length of the intake crane runway as shown on the drawings. The sequencing of demolition and installation of the crane rails must minimize project time without an operational intake crane and typically progress from one side of the dam to the other with the transfer of the crane from old to new rail during completion of the final rail segment. The Contractor will be required to commence work upon receipt of contract award and complete the work 360 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. The estimated construction cost of this project is between $1,000,000 and $5,000,000. The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 238120 ? Structural Steel and Precast Concrete Contractors, with a size standard for Small Business of $19M. All questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance). The Contracting Office is USACE Omaha District, 1616 Capital Ave, Omaha, NE 68102. The Place of Performance is Gavins Point Project, Crofton, NE 68730. | 38% | Pre-Solicitation | 08/10/2026 |
4 TON HVAC UNIT - Bard | 37% | Combined Synopsis | 11/16/2026 |
Light commercial baseboard radiation unit and Supply valve Model 185C | 37% | Combined Synopsis | 10/06/2026 |
Additional Details
Solicitation Number
W91ZRU23R0013
Archive Date
Sep 22, 2023
Office Address
FORT RICHARDSON, AK, 99505-5800