Do 5907MCCARTHY ANDERSON/MAC
Overview
Award facts
- Period of performance
- Sep 9, 2011 to Dec 16, 2011
- Ended
- Modifications
- 8
- Latest action Sep 12, 2011
- Contract type
- Do
- PIID 5907
Description of requirement
TAS::57 3404::TAS RECOVERY - FXBM081107 - REPAIR TO LEED-TRANSPORTATION COMPLEX (B101, B102, & B104), ELLSWORTH AFB SD CONSIST OF DESIGN, INVESTIGATE, AND REPAIR TO LEED TRANSPORTATION COMPLEX, BUILDIGS 101, 102, AND 104. ACCOMPLISH ALL DESIGN, INVESTIGATE, AND REPAIR WORK FOR BUILDINGS 101, 102 ,AND 104 AS DETAILED IN THE STATEMENT OF WORK ACCOMPLISHING VARIOUS ENERGY AND FACILITY IMPROVEMENTS TO THE TRANSPORTATION COMPLEX (BUILDINGS 101, 102, AND 104). AS A MINIMUM, THE FOLLOWING WORK SHALL BE ACCOMPLISHED: A. BUILDING 101: I. REPLACE OVERHEAD DOORS WITH 2 INSULATED OVERHEAD DOOR AND INSTALL NEW WEATHER STRIPPING. INTERIOR FINISH SHALL BE SUITABLE FOR A CAR WASH ENVIRONMENT II. REPLACE EXISTING SIDING AND ROOFING. NEW WALL PANELS SHALL BE R-19 WITH AN INTERIOR FINISH SUITABLE FOR A CAR WASH ENVIRONMENT. NEW ROOF PANELS SHALL BE R-33 WITH AN INTERIOR FINISH SUITABLE FOR A CAR WASH ENVIRONMENT. EXTERIOR COLORS TO MATCH BASE ARCHITECTURAL SCHEME. III. REPLACE EXISTING HOT WATER BOILER WITH HIGH EFFICIENCY, CONDENSING TYPE BOILERS. REPLACE EXISTING PUMPS SERVING THE FLOOR HEAT SYSTEM. IV. REPLACE THE EXISTING CAR WASH HOT WATER HEATER WITH A HIGH EFFICIENCY, CONDENSING TYPE WATER HEATER. V. REPLACE EXISTING LIGHTING WITH ENERGY EFFICIENT LIGHTING. INSTALL OCCUPANCY SENSORS WHERE APPLICABLE. INVESTIGATE AND PROPOSE POSSIBLE DAY LIGHTING OPTIONS. VI. NEW MECHANICAL EQUIPMENT SHALL INCLUDE POINTS THAT TIE INTO THE EXISTING HONEYWELL CONTROL SYSTEM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROGRAMMING ALL NEW DEVICES INCLUDING PROGRAMMING ON THE EXISTING HONEYWELL EBI SYSTEM. B. BUILDING 102: I. REPLACE EXTERIOR WINDOWS WITH 1 THICK THERMAL PANE WINDOWS, CLAD EXTERIOR AND INSIDE LIGHT LAMINATED FOR FORCE PROTECTION. EXTERIOR CLAD COLOR AND INTERIOR FINISH TO MATCH EXISTING FINISHES. INVESTIGATE THE POSSIBILITY OF INSTALLING INSULATED PANELS INSTEAD OF WINDOWS IN SOME LOCATIONS. II. REPLACE ALL SEALS AND WEATHER STRIPPING ON OVERHEAD DOORS. III. REPLACE EXISTING LIGHTING WITH ENERGY EFFICIENT LIGHTING. IV. REPLACE EXISTING ELECTRICAL TRANSFORMERS WITHIN THE FACILITY WITH HIGH EFFICIENCY K RATED TRANSFORMERS. C. BUILDING 104: I. REPLACE WALL INSULATION IN VEHICLE PARKING AREA WITH R-19 INSULATION. II. REPLACE MECHANICAL SYSTEMS THAT SERVE THE OFFICE AREAS. III. REFURBISH AND REACTIVATE THE AIR HANDLING UNIT IN THE VEHICLE PARKING AREA. IV. REPLACE EXISTING LIGHTING WITH ENERGY EFFICIENT LIGHTING. V. NEW MECHANICAL EQUIPMENT SHALL INCLUDE POINTS THAT TIE INTO THE EXISTING HONEYWELL CONTROL SYSTEM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROGRAMMING ALL NEW DEVICES INCLUDING PROGRAMMING ON THE EXISTING HONEYWELL EBI SYSTEM. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACCOMPLISHING ALL DESIGN AND INVESTIGATIVE SERVICES FOR THIS PROJECT. ARRA::YES::ARRA
Dates and value
- Award date
- Signed on Jun 22, 2009
- Potential end of performance
- Dec 15, 2011
- Parent contract vehicle
- FA469007DK101 (IDC, multiple award) — 31 orders recorded under it
The Department of Defense funded and awarded this contract. DoD contract actions are withheld at the source for about 90 days after signature, so actions signed after Aug 8, 2026 are not yet public.
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 12, 2011. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
Self-reported at the time of the action.
Agency and place
Awarding and funding
- Awarded by
- Department of Defense
- Department Of The Air Force
- FA4690 28 CONS PKC
- Funded by
- Department of Defense
- Department Of The Air Force
- FA4690 28 CONS PKC
Place of performance
- Place of performance
- Ellsworth Afb, Meade County, South Dakota 57706-4904
- Congressional district (place of performance)
- SD-00As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- Z299MAINT, REP/ALTER/ALL OTHER (service)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Fair opportunity exception
- Fair opportunity givenFAIR
- Solicitation procedures
- Subject to multiple award fair opportunityMAFO
- Set-aside
- 8a competed8A
- Contract pricing
- Firm fixed priceJ
- Offers received
- 7
Solicitation and notices
- Solicitation ID
- FA469007RK101(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Cost Accounting Standards clause
- Not applicable exempt from CASX
- Certified cost or pricing data
- No
- Contract financing
- FAR 52.232-16 progress paymentsA
- Commercial procedures
- Commercial itemA
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Transaction history
Modification history
- Base award
- Jun 22, 2009Base obligation at award: $1,094,445
- Latest action
- Sep 12, 2011 — Supplemental agreement (within scope)Modification 8; obligation change +$18,727
- Latest substantive action
- Sep 12, 2011 — Supplemental agreement (within scope)Modification 8; obligation change +$18,727
- Actions by type
- Base award1
- Supplemental agreement (within scope)6
- Other administrative action2
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $18,727
- Latest action: change in base and all options
- $18,727
Socio-economic and policy
- Recovered materials and sustainability
- FAR 52.223-4 and FAR 52.223-9 includedB
- EPA-designated product
- Not requiredE
- Construction wage rates (Davis-Bacon)
- Yes
Place and origin
- Place of manufacture
- Not a manufactured end productC
- Sea transportation
- No
Structure
- Award or IDV
- Award
- Award type
- DoC
- Parent vehicle type
- IDCB
- Parent vehicle: multiple or single award
- Multiple awardM
- Parent vehicle agency
- Department of Defense9700
- IT commercial item category
- Not IT products or servicesZ
- DoD claimant program
- ConstructionC2
- Awarding agency code
- 9700
- Awarding sub-tier code
- 5700
- Contracting office code
- FA4690
- Transactions recorded under this award key
- 9
Funding
- Funding agency code
- 9700
- Funding sub-tier code
- 5700
- Funding office code
- FA4690