Delivery order NNK15MA04TSIERRA NEVADA COMPANY, LLC
Overview
Award facts
- Net obligations
- $4.34M
- $4,343,286of $4.34M potential value
- Period of performance
- Dec 6, 2017 to Jan 31, 2018
- Ended
- Modifications
- 14
- Latest action Dec 6, 2017
- Contract type
- Delivery order
- PIID NNK15MA04T
Description of requirement
IGF::OT::IGF TASK ORDER 2 FOR ADVANCED PLANT HABITAT. THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: 1.0 THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS FOR THE ADVANCED PLANT HABITAT (APH) PROJECT IS TO FABRICATE AND CERTIFY A PLANT HABITAT (PH) FACILITY FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRES FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY WHICH INCLUDES SUBSYSTEMS/ORBITAL REPLACEMENT UNIT (ORU) AND PARTS TO REPAIR THE SUBSYSTEMS/ORU IN ACCORDANCE WITH ATTACHMENT J-01 SYSTEMS REQUIREMENTS DOCUMENT FOR THE PLANT HABITAT (PH), PH-R0001 AND ATTACHMENT J-02 CONTRACT WORK BREAKDOWN STRUCTURE. 2.0 THE CONTRACTOR SHALL FABRICATE FLIGHT PH THAT CONSISTS OF THE FOLLOWING: A. AVIONICS (2.1) THE PLANT HABITAT AVIONICS REAL-TIME MANAGER (PHARMER) IN EXPEDITE THE PROCESSING OF EXPERIMENTS TO SPACE STATION (EXPRESS) RACK IS THE PRIMARY HARDWARE THAT COMMUNICATES WITH THE CORE MICROCONTROLLERS THAT EXISTS IN EACH SUBSYSTEM AND ALLOWS CONTROL AND COLLECTION OF SYSTEM AND SCIENCE DATA. B. SOFTWARE (2.2) THE SOFTWARE CONTROLS BOTH SYSTEM AND PLANT GROWTH CHAMBER PARAMETERS AND COLLECTS BOTH SCIENCE AND SYSTEM DATA. THE THREE SOFTWARE'S BEING DEVELOPED IS FOR THE PHARMER, GROUND SCIENCE STATION, AND THE EXPRESS RACK COMPUTER ON THE ISS. C. GROWTH LIGHT ASSEMBLY (GLA) (2.3) THE GLA PROVIDES THE NECESSARY LIGHT INTENSITY (UP TO 1000 MOL/M2S @ 15CM) AND LIGHT LEVEL ( MOL/M2S @ 15CM) AT 600 RED, 400 BLUE, 100 GREEN, 50 FAR RED, 600 WHITE, AND INFRA-RED (IR) FOR NIGHT FOR PLANT GROWTH. THE GLA ALSO CONTAINS A CAMERA FOR TOP VIEW IMAGING OF THE PLANTS. D. POWER DISTRIBUTION ASSEMBLY (PDA) (2.4) THE PDA RECEIVES 28V POWER FROM FOUR EXPRESS RACK POWER FEEDS. THE PDA CONVERTS THAT POWER AS NECESSARY (DIFFERENT VOLTAGES) TO PROVIDE POWER TO THE OTHER SUBSYSTEMS WITHIN PH AS REQUIRED. E. THERMAL CONTROL SYSTEM (TCS) (2.5) THE TCS CONSIST OF THE MODERATE TEMPERATURE LOOP (MTL) COLDPLATES ON THE ENVIRONMENTAL CONTROL SYSTEM (ECS), AVIONICS UNIT, PDA, AND GLA; IT ALSO CONSIST OF THE AVIONICS AIR ASSEMBLY (AAA) FORCED AIR FROM THE EXPRESS RACK THAT COOLS THE ORU DRAWER INSIDE THE PH CAVITY, AND INSIDE THE INTERNATIONAL SUBRACK INTERFACE STANDARD)(ISIS) DRAWER. F. WATER RECOVERY AND DELIVERY SYSTEM (WRADS) (2.6) THE WRADS STORES RECOVERED CONDENSATE WATER DELIVERED BY THE ECS, TRANSFER WATER FROM THE RECOVERY STORAGE RESERVOIR TO THE HUMIDITY CONTROL UNIT DURING PRIMING OPERATIONS, TRANSFER RECOVERED CONDENSATE WATER TO THE DISTRIBUTION STORAGE RESERVOIR, TRANSFER WATER FROM THE DISTRIBUTION STORAGE RESERVOIR TO THE SCIENCE CARRIER ROOT TRAY FOR MOISTURE CONTROL (FEEDING), AND PRIME THE SCIENCE CARRIER ROOT TRAY FOR SEED GERMINATION. G. ENVIRONMENTAL CONTROL SYSTEM (ECS) (2.7) THE ECS HAS CAPABILITY FOR AIR CIRCULATION&TEMPERATURE/HUMIDITY CONTROL, CARBON DIOXIDE CONTROL, ETHYLENE REMOVAL&AIR SAMPLE, AND ECS PRESSURE AND OXYGEN CONCENTRATION MAINTENANCE. H. SCIENCE CARRIER (2.8) THE SCIENCE CARRIER IS A REMOVABLE AND RECONFIGURABLE TRAY WITHIN THE APH THAT WILL PROVIDE THE PRINCIPLE STRUCTURAL SUPPORT AND FINAL WATER DELIVERY TO THE ROOT-ZONE FOR PLANT GROWTH EXPERIMENTATION. I. GROWTH CHAMBER (2.9) THE GROWTH CHAMBER IS THE PLANT GROW AREA. IT INTERFACES WITH THE ECS MODULES, SCIENCE CARRIER, AND THE GLA (THROUGH A WINDOW). IT ALSO CONTAINS COMPONENTS ON THE BACK OF THE CHAMBER FOR ATMOSPHERE CONTROL, IMAGING CAPABILITY (2 CAMERAS), AND A POWER&COMMUNICATION MICROCONTROLLER. J. STRUCTURAL MOUNTING ASSEMBLY (SMA) (2.10) THE SMA CONSISTS OF THE BACKPLATE, OUTER SKIN, BOTTOM PAN, AND ORU/CHAMBER MOUNTING RAILS, ORU DRAWER, AND AIR FILTRATION ASSEMBLY. 3.0 THE CONTRACTOR SHALL FABRICATE ORBITAL REPLACEMENT UNIT (ORU) FOR PH THAT CONSISTS OF A
Dates and value
- Award date
- Signed on Feb 5, 2015
- Potential end of performance
- Jan 30, 2018
- Current value
- $4,343,286Base and exercised options
- Potential value (if all options are exercised)
- $4,343,286
- Parent contract vehicle
- NNK15MA02B (IDC, single award) — 7 orders recorded under it
Obligations by fiscal year of action
- FY2016: $144,976
- FY2015: $4,198,310
Total across 2 fiscal years: $4,343,286
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Dec 6, 2017. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA KENNEDY SPACE CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA KENNEDY SPACE CENTER
Place of performance
- Place of performance
- Madison, Dane County, Wisconsin 53717-1961
- Congressional district (place of performance)
- WI-02As reported at the time of the action
Classification and competition
Classification
Competition
- Extent competed
- Not competedC
- Reason not competed
- Follow-on contract (FAR 6.302-1(A)(2)(II/III))FOC
- Solicitation procedures
- Only one sourceSSS
- Set-aside
- No set-aside used
- Contract pricing
- Firm fixed priceJ
- Offers received
- 1
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Advanced plant habitat (APH)
- Certified cost or pricing data
- Yes
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- Yes
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Feb 5, 2015Base obligation at award: $4,198,310
- Latest action
- Dec 6, 2017 — Supplemental agreement (within scope)Modification 14
- Latest substantive action
- Dec 6, 2017 — Supplemental agreement (within scope)Modification 14
- Actions by type
- Base award1
- Supplemental agreement (within scope)8
- Other administrative action6
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Synopsized publicly (SAM.gov / FedBizOpps)
- Yes
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Inherently governmental functions
- Other functionsOT
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Delivery orderC
- Parent vehicle type
- IDCB
- Parent vehicle: multiple or single award
- Single awardS
- Parent vehicle agency
- National Aeronautics and Space Administration8000
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80KSC0
- Transactions recorded under this award key
- 15
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80KSC0