Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
Archived on May 30, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- May 6, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NEW YORK.W2SD ENDIST NEW YORK
- Place of performance
- Fort Drum, New York, 13602
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912DS25RA003
- Notice ID
- a7f2bb8f69f44dfeb20a54229e4db138
Description
W912DS25RA003 - Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
Summary of Work: This construction project will install a major lighting infrastructure upgrade at the Wheeler Sack Army Airfield and will also repave a section of the main runway. The work includes construction of an airfield lighting vault, runway lighting fixtures, electrical infrastructure, concrete duct bank, utilities, HVAC, airfield paving, runway lighting and controls, site excavation, and restoration. All construction trades required. The project will need to be done in phases as mission operations must continue throughout the construction. A strong site superintendent will be required. The contract duration will be 852 calendar days for the entire project with phasing work involved. The North American Industry Classification System (NAICS) code is for general construction; 237310 for Highway, Street and Bridge Construction.
This project is subject to the Project Labor Agreement (PLA) requirements of Executive Order 14063. See FAR provision 52.222-33, Alt 1, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract.
Please see the attached solicitation documents for further information.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (38)
- Download
Amendment 13 - W912DS25RA003.pdf
2.0 MBAdded in Solicitation version 19Posted - Download
Amendment 12 - W912DS25RA003.pdf
3.8 MBAdded in Solicitation version 17Posted - Download
Ft_Drum_Pre-Award_Re-Phasing_Specifications.pdf
3.8 MBAdded in Solicitation version 17Posted - Download
Ft Drum Pre-Award Re-Phasing Drawings_041726.pdf
31 MBAdded in Solicitation version 17Posted - Download
FortDrum_SWPPP_Rephasing_Stamped_R1-20 Apr 26.pdf
36 MBAdded in Solicitation version 17Posted - Download
FortDrum-WSAAF-Request_for_Disturbance_Letter.pdf
31 KBAdded in Solicitation version 17Posted - Download
Amendment 11 W912DS25RA003.pdf
3.9 MBAdded in Solicitation version 16Posted - Download
Amendment 10 - W912DS25RA003.pdf
3.8 MBAdded in Solicitation version 15Posted - Download
Amendment 9 W912DS25RA003.pdf
3.3 MBAdded in Solicitation version 14Posted - Download
GC101 - Phasing and Schedule Market Research.pdf
932 KBAdded in Solicitation version 14Posted - Download
Phasing and Schedule Market Research.pdf
29 KBAdded in Solicitation version 14Posted - Download
Amendment 8 - W912DS25RA003.pdf
3.3 MBAdded in Solicitation version 13Posted - Download
Amendment 7 - W912DS25RA003.pdf
3.3 MBAdded in Solicitation version 12Posted - Download
Amendment 6 - W912DS25RA003.pdf
3.3 MBAdded in Solicitation version 11Posted - Download
Amendment 5 - W912DS25RA003.pdf
3.3 MBAdded in Solicitation version 10Posted - Download
Amendment 4 W912DS25RA003.pdf
3.3 MBAdded in Solicitation version 9Posted - Download
Amendment 2 W912DS25RA003.pdf
3.3 MBAdded in Solicitation version 9Posted - Download
Basis of Award W912DS25RA003 18Dec2025.pdf
594 KBAdded in Solicitation version 14Posted - Download
Electric and Water Utilities on the Concrete Batch Plant Site.pdf
90 KBAdded in Solicitation version 12Posted - Download
32 12 15.13.pdf
118 KBAdded in Solicitation version 11Posted - Download
Ft_Drum_SWPPP_FINAL_04252025_UPD07OCT25.pdf
39 MBAdded in Solicitation version 8Posted - Download
Amendment 3 - W912DS25RA003.pdf
3.3 MBAdded in Solicitation version 8Posted - Download
Amendment 0003 Specs - Ft Drum Runway Lighting Repair (WSAAF).pdf
1.4 MBAdded in Solicitation version 8Posted - Download
Sign-in Sheet.pdf
262 KBAdded in Solicitation version 8Posted - Download
Ft Drum Runway Lighting Repair - Final RTA Plans (1-54).pdf
14 MBAdded in Solicitation version 7Posted - Download
Ft Drum Runway Lighting Repair - Final RTA Plans (55-108).pdf
32 MBAdded in Solicitation version 7Posted - Download
Ft Drum Runway Lighting Repair - Final RTA Plans (109-217).pdf
39 MBAdded in Solicitation version 7Posted - Download
Ft Drum Runway Lighting Repair - Final RTA Plans (218-326).pdf
39 MBAdded in Solicitation version 7Posted - Download
Ft Drum Runway Lighting Repair - Final RTA Plans (327-433).pdf
36 MBAdded in Solicitation version 7Posted - Download
Ft_Drum_RTA_Specifications_Reprint.pdf
31 MBAdded in Solicitation version 7Posted - Download
Solicitation Amendment W912DS25RA0030001 SF 30.pdf
3.3 MBAdded in Solicitation version 6Posted - Download
WSAAF Lighting Upgrade JA - Trane Tracer Ensemble_Redacted.pdf
2.6 MBAdded in Solicitation version 6Posted - Download
WSAAF Lighting Upgrade JA - Monaco Fire Alarm_signed-_Redacted.pdf
2.1 MBAdded in Solicitation version 6Posted - Download
Bidder Walkthrough Visitor Pass Instructions R1.pdf
188 KBAdded in Solicitation version 6Posted - Download
Solicitation - W912DS25RA003.pdf
5.7 MBAdded in Solicitation version 4Posted - Download
IMDR-ES_Form_2_APPLICATION_FOR_SPONSORSHIPv7.pdf
122 KBAdded in Solicitation version 4Posted - Download
Ft Drum Map (WSAAF Bidder Walkthrough).pdf
1.6 MBAdded in Solicitation version 4Posted - Download
Bidder Walkthrough Plan.pdf
943 KBAdded in Solicitation version 4Posted
Lifecycle
- 3Version 3Special NoticeArchived
Advance Notice: Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 4Version 4SolicitationArchived
Type changed from Special Notice to Solicitation
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 5Version 5SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 6Version 6SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 7Version 7SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 8Version 8SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 9Version 9SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 10Version 10SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 11Version 11SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 12Version 12SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 13Version 13SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 14Version 14SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 15Version 15SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 16Version 16SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 17Version 17SolicitationArchived
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
- 19Version 19SolicitationArchivedCurrent
Construction of Wheeler Sack Army Airfield (WSAAF) Lighting Upgrade Fort Drum, NY
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912DS25RA003
Archive Date
May 30, 2026
Office Address
NEW YORK, NY, 10278-0004