Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
Archived on May 5, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM CDT
- Posted
- May 1, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST ROCK ISLAND.W07V ENDIST ROCK ISLAND
- Place of performance
- Cedar Rapids, Iowa
- PSC
- Y1QA: CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912EK26BA001
- Notice ID
- fd7ade7d7ffb4bb48a8d19ec2d26bf4b
Description
**Updated Virtual Bid Opening Call-In Information** The access code has been updated. To access the virtual bid opening, please use the following information:
Phone: 503-207-9433
Access Code: 759 365 344#
**Reminder: Submission of bids are due on 18 March 2026 at 1:00 PM CST and the Bid Opening will be held at 2:00 PM CST.**
ATTENTION
Due to file sizes and SAM.gov limitations at the time of release, not all of the files that are needed are posted. The files:
1. Solicitation with Specifications (solicitation document without contract specifications was posted)
2. Attachment J-2 Plan Set - VOL 401 Floodwall
Please email Samantha Johanson and Brunson Grothus at the following emails and you will get a link to the files via DoD SAFE:
samantha.k.johanson@usace.army.mil
brunson.e.grothus@usace.army.mil
The U.S. Army Corps of Engineers, Rock Island District has a requirement for a construction contract for the project known as: Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station.
The work includes, but is not limited to: site demolition; temporary traffic controls; clearing, grubbing and stripping; pavement removal, levee removal, utility removal, plugging and abandonment of utilities; construction of rigid and flexible pavements, construction of utilities such as storm sewers, manholes and catch basins; construction of cast-in-place concrete floodwall, storm sewer outlets, gate wells, geotechnical instrumentation and relief wells, trench and toe drains, and pump station construction.
NAICS Code: 237990
Size Standard: $45,000,000.00
Estimated Range: Between $25,000,000 and $100,000,000
Unrestricted, Invitation for Bid
A site visit will be conducted on 02 December 2025 at 9:00 AM CST. **Please RSVP to Matthew Hosford at (309)252-2008 or matthew.m.hosford@usace.army.mil by 28 November 2025 at 10:00 AM CST if you plan to attend.** See clause 52.236-27 in the solicitation document for additional details.
Questions regarding this solicitation shall be submitted via ProjNet by 2:00 PM CST on 18 December 2025. See "Question and Answer via ProjNet" within the Instructions to Bidders Section of the solicitation document for additional information.
**Amendment 0001 - The purpose of this amendment is to update the contract completion days from 850 to 970 consecutive calendar days, as well as extend the due dates for receipt of questions and bids. See attachment titled, "A22 - Solicitation Amendment W912EK26BA0010001" for details.
**Amendment 0002 - The purpose of this amendment is to update the Plans and Specifications based on questions received, add FAR Clause 52.219-4, update the Instructions to Bidders to include a list of what should be submitted with the Bid Package, and **Suspend bid submission due date and bid opening indefinitely. The bid submission due date of 08 April 2026 is set strictly as a placeholder. Another amendment will be issued in the future to re-establish a new date for receipt of bids and bid opening.**
**Amendment 0003 - The purpose of this amendment is to *remove the Project Labor Agreement requirement*, re-open the Q&A period, *establish a new due date for receipt of bids and bid opening*, update the Plans and Specifications based on questions received, update the Wage Determination to the most current version, and include an additional reference plan set as Attachment J-6. **Questions can be submitted via ProjNet until 02 March 2026 at 2:00 PM CST.**Submission of bids are due on 18 March 2026 at 1:00 PM CST and the Bid Opening will be held at 2:00 PM CST.**
**Amendment 0004 - The purpose of this amendment is to update the Plans and Specifications based on questions received. See attachments titled, "A22 - Solicitation Amendment W912EK26BA0010004 with Specs Rev3" and "A22 - Amendment 0004 - Attachment J-2 Plan Set - VOL 401 Floodwall Rev3" for details.
**Bid Summary Sheet is posted in the Attachments section.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (17)
- Download
Bid Summary Abstract.pdf
232 KBAdded in Solicitation version 15Posted - Download
A22 - Solicitation Amendment W912EK26BA0010004 with Specs Rev3.pdf
1.6 MBAdded in Solicitation version 15Posted - Download
A22 - Amendment 0004 - Attachment J-2 Plan Set - VOL 401 Floodwall Rev3.pdf
4.3 MBAdded in Solicitation version 15Posted - Download
A22 - Amendment 0003 - Attachment J-6 - Reference Plan Set 2.pdf
11 MBAdded in Solicitation version 15Posted - Download
A22 - Amendment 0003 - Attachment J-3 Plan Set - VOL 403 Pump Station Rev1.pdf
2.4 MBAdded in Solicitation version 15Posted - Download
A22 - Amendment 0003 - Attachment J-2 Plan Set - VOL 401 Floodwall Rev2.pdf
13 MBAdded in Solicitation version 15Posted - Download
A22 - Amendment 0003 - Attachment J-1 Wage Determination Rev1.pdf
86 KBAdded in Solicitation version 15Posted - Download
A22 - Solicitation Amendment W912EK26BA0010003 SF 30 with Specs Rev2.pdf
1.8 MBAdded in Solicitation version 15Posted - Download
A22 - Solicitation Amendment W912EK26BA0010002 with Specs Rev1.pdf
40 MBAdded in Solicitation version 15Posted - Download
A22 - Amendment 0002 - Attachment J-2 Plan Set - VOL 401 Floodwall Rev1.pdf
31 MBAdded in Solicitation version 15Posted - Download
A22 - Amendment 0002 - Attachment J-5 - Reference Plan Set.pdf
38 MBAdded in Solicitation version 15Posted - Download
A23 - Reach 4 Phase 1 Pre-Bid Sign In Sheet.pdf
9.9 MBAdded in Solicitation version 15Posted - Download
A22 - Solicitation Amendment W912EK26BA0010001.pdf
3.3 MBAdded in Solicitation version 15Posted - Download
A22 - Solicitation - W912EK26BA001 - IFB only.pdf
5.6 MBAdded in Solicitation version 15Posted - Download
A22 - Attachment J-1 Wage Determination.pdf
88 KBAdded in Solicitation version 15Posted - Download
A22 - Attachment J-3 Plan Set - VOL 403 Pump Station.pdf
35 MBAdded in Solicitation version 15Posted - Download
A22 - Attachment J-4 Supplemental Data.pdf
63 MBAdded in Solicitation version 15Posted
Lifecycle
- 4Version 4PresolicitationArchived
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 5Version 5SolicitationArchived
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 6Version 6SolicitationArchived
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 7Version 7SolicitationArchived
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 8Version 8SolicitationArchived
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 9Version 9SolicitationArchived
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 10Version 10SolicitationArchived
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 12Version 12SolicitationArchived
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 15Version 15SolicitationArchivedCurrent
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
- 18Version 18Award NoticeArchived
Type changed from Solicitation to Award Notice
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
Similar Opportunities
Additional Details
Solicitation Number
W912EK26BA001
Archive Date
May 5, 2026
Office Address
ROCK ISLAND, IL, 61299-5001