Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM EDT
- Posted
- August 6, 2026
- Notice type
- Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Office
- PCAC (36C776)
- Place of performance
- Charles George VA Medical Center, Asheville, North Carolina, 28805
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C77626R0066
- Notice ID
- 05c449abe73f48f19210989d7b0cd554
Description
Amendment 0007 has been posted. This amendment responds to RFIs, updates Attachment 9, provides Addendum 1, and extends the date for receipt of offers. The update to Attachment 9 corrects the incorrect solicitation number and location in the header. The new date and time for receipt of offers is 8/17 at 3PM EDT. Specifications and drawings found in Addendum 1 dated 8-6-26 replace the corresponding specification section or drawing in the original package.
Amendment 0006 has been posted. This amendment extends the date for offers due to 8/14 at 3PM EDT.
Amendment 0005 has been posted. This amendment extends the date for offers due to 8/7 at 3PM EDT. It also adds FAR clause 52.212-4 and removes FAR clauses 52.249-2 and FAR 52.249-10.
Amendment 0004 has been posted. This amendment extends the date for offers due to 7/27 at 3PM EDT.
Amendment 0003 has been posted. This amendment extends the date for offers due to 7/13 at 3PM EDT.
Amendment 0002 has been posted. This amendment extends the date for offers due to 7/1 at 3PM EDT.
Amendment 0001 has been posted along with its attachments. This amendment adds the site visit sign-in sheet and agenda from the site visit on 6/9.
The contractor shall provide all tools, equipment, materials, labor, supervision, and management to complete the construction of infrastructure upgrades to the campus. Construction practices shall comply with all VA solicitation drawings and specifications, VA regulations, procedures, and conditions for work at the medical center and any applicable codes as per requirements of all governing agencies.
Work includes, but is not limited to, electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, asses for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), Renovation Datacenter work (HVAC, UPS, Power distribution, cable management, expansion of space, fire suppression, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project buildings include: Buildings 47, 62, 14, 15, 9, 7, 6, 5, 4, 3, 2, 73, 70, 11, 12 and site.
Contractor shall complete the intent of project 637-22-700 in strict accordance with the drawings and specifications. All work not specifically identified by the drawings and/or specifications but necessary for a complete system shall be included as if specifically identified in the Contract Documents.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Vendor
GROUP III MANAGEMENT INCContract end date
Jan 19, 2027
NAICS
236220
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (26)
- Download
Addendum 1 8-6-26.zip
16 MBAdded in Solicitation version 11Posted - Download
Attachment 9 - Key Subcontractor Information.docx
101 KBAdded in Solicitation version 11Posted - Download
Amendment 0007.pdf
86 KBAdded in Solicitation version 11Posted - Download
RFI Responses.docx
137 KBAdded in Solicitation version 11Posted - Download
Amendment 0006.pdf
85 KBAdded in Solicitation version 10Posted - Download
Amendment 0005.pdf
133 KBAdded in Solicitation version 9Posted - Download
Amendment 0004.pdf
84 KBAdded in Solicitation version 6Posted - Download
Amendment 0003.pdf
84 KBAdded in Solicitation version 5Posted - Download
Amendment 0002.pdf
85 KBAdded in Solicitation version 4Posted - Download
Amendment 0001 - Site Visit Sign In.pdf
995 KBAdded in Solicitation version 3Posted - Download
Amendment 0001 - Site Visit Agenda.pdf
129 KBAdded in Solicitation version 3Posted - Download
Amendment 0001.pdf
83 KBAdded in Solicitation version 3Posted - Download
Attachment 12 - Wage Determination.pdf
36 KBAdded in Solicitation version 2Posted - Download
Attachment 13 - Site Visit Details.pdf
22 KBAdded in Solicitation version 2Posted - Download
Attachment 10 - Key Personnel.docx
101 KBAdded in Solicitation version 2Posted - Download
Attachment 11 - Division Pricing Template.xlsx
9.9 KBAdded in Solicitation version 2Posted - Download
Attachment 8 - Limitations on Subcontracting - Construction.docx
28 KBAdded in Solicitation version 2Posted - Download
Attachment 7 - Drawings Volume VI.pdf
9.5 MBAdded in Solicitation version 2Posted - Download
Attachment 6 - Drawings Volume V.pdf
13 MBAdded in Solicitation version 2Posted - Download
Attachment 5 - Drawings Volume IV.pdf
20 MBAdded in Solicitation version 2Posted - Download
Attachment 4 - Drawings Volume III.pdf
12 MBAdded in Solicitation version 2Posted - Download
Attachment 3 - Drawings Volume II.pdf
21 MBAdded in Solicitation version 2Posted - Download
Attachment 2 - Drawings Volume I.pdf
29 MBAdded in Solicitation version 2Posted - Download
Attachment 1 - Specifications.pdf
17 MBAdded in Solicitation version 2Posted - Download
36C77626R0066.pdf
585 KBAdded in Solicitation version 2Posted - Download
36C77626R0066_1.docx
18 KBAdded in Presolicitation version 4Posted
Links (1)
- Department of Veterans Affairs Homepagewww.va.govPosted
Lifecycle
- 7Version 7PresolicitationArchived
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Ashville, NC |
- 2Version 2Solicitation
Type changed from Presolicitation to Solicitation
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Ashville, NC |
- 3Version 3Solicitation
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Ashville, NC |
- 4Version 4Solicitation
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Ashville, NC |
- 5Version 5Solicitation
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Ashville, NC |
- 6Version 6Solicitation
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Ashville, NC |
- 9Version 9Solicitation
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
- 10Version 10Solicitation
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
- 11Version 11SolicitationCurrent
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Replace Chillers in AHUs 1 & 2 558-22-172 | - | Awarded | Open |
STATEMENT OF WORK Project Number: 558-22-172 Replace Chillers for AHU 1 and 2 Scope: The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. Construction Period - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants. Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting. As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats. Hours of Operation and Phasing: Construction should be phased and timed such that: General Operation of the affected areas is not interrupted The facility operates on a 24-hour, 7 day per week schedule Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR. Contractor to develop and coordinate phasing plan with input from staff and final approval of COR. Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date. Storage: No storage of any material will be allowed on VA property unless approved by the COR. Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP). Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption. General Requirements The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space. Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR. All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance. New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition. The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project. END OF SCOPE OF WORK | - | Solicitation | 08/27/2026 |
SOW 565-22-500 Correct Electrical Deficiencies Fayetteville VAMC Intent The project consists of correcting electrical deficiencies as noted from previous VA facility assessments. Improvements include; New electrical entrance building, medium voltage loop replacement, replace electrical distribution equipment, ground conductor corrections, incidental electrical equipment cleanup throughout the Fayetteville VAMC, and minor HVAC and Plumbing improvements. Period of performance 1,174 calendar days. Medium Voltage VA owned medium voltage loop and entrance equipment will be modified or replaced with the following scope: Replace existing medium voltage entrance equipment with new at campus entrance. Provide new building: Slab on grade, brick on CMU wall, Slate roof tile (to match existing facility) Provide new VA owned medium voltage cables in concrete encased duct bank for medium voltage loop. Approximately 300 . Demo and remove old VA owned medium voltage entrance metal shack. Replace medium voltage sectionalized switch. Provide new metal-clad switchgear with draw-out vacuum circuit breakers. Replace medium voltage oil filled transformer (1) Panel Replacement and Branch Circuit Improvements Correct deficiencies to electrical panels and branch circuit wiring which are not correctly sized, protected, or are at end of useful life, as identified through various inspections over the years. o All work will be phased. All replacements to existing equipment will require the contractor to filled-out a phasing plan for VA approval. All replacements to existing equipment will require a temporary power solution to minimize electrical outage to existing areas. Such deficiencies include: Replace-in-same-room building entrance and large distribution equipment: Normal (service entrance) Switchboards: approx. 2 Generator switchboards: approx. 2 Automatic transfer switch: approx. 7 Replace-in-place distribution panels and panelboards distribution equipment Distribution Panels: approx. 5 Panelboards: approx. 68 Replace undersized feeders Redundant Gound Provide redundant equipment grounding conductor to a portion of the facility. Approx. 100,000 square feet of existing electrical branch circuit distribution in occupied space. HVAC And Plumbing Reroute (vertically & horizontally) Sewer piping and hot water piping to avoid electrical room. Provide exhaust fan to new Medium Voltage building. Incidental Electrical Equipment Cleanup Provide Identification tag to new and existing equipment throughout the facility: approx. 100 tags Clean debris from existing electrical enclosures throughout the facility: approx. 30 enclosures. Correct panel grounding, terminate cable directly to existing panel s ground bar: approx. 30 panels. ALTERNATE NO.1: BASE BID except delete Bldg 1, Floor 1 and Floor 3 of deficiency item 134 which directs the contractor to provide ground conductors in existing conduit. Which is noted on Sheet B01-E200. | - | Solicitation | 12/08/2026 |
Replace Domestic Water, Chilled Water, and Steam Piping Project Number 558-24-160 STATEMENT OF WORK Description of Work - Summary: The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping. General: The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications. The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control—dual hat. Safety officer must remain separate. Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations. Period of Performance: Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items. | - | Solicitation | 12/02/2026 |
| - | Solicitation | 10/29/2026 |
Additional Details
Solicitation Number
36C77626R0066
Archive Date
Nov 27, 2026
Office Address
INDEPENDENCE, OH, 44131