Notice ID: 865fa0d7f7674f0faca826c0c4a4d3e8Award NoticeAwardedArchived
Dragonfly IV AME System
Awarded on August 25, 2025. Full description on SAM.gov.
Awarded tounder FA8571-25-P-0110 (source: SAM.gov award notice)• $249.0K
Overview
- Posted
- August 25, 2025
- Notice type
- Award Notice
- Set-aside
- No Set aside used
- NAICS
- 333248: All Other Industrial Machinery Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- FA8571 MAINT CONTRACTING AFSC PZIM
- Place of performance
- Warner Robins, 31098
- Last updated
- Nov 9, 2026
- First published
- Last updated on SAM.gov
- Award date
- Aug 25, 2025
- Award amount (SAM.gov award notice)
- $249.0K
Identifiers
- Solicitation number
- FA857125Q0106
- Notice ID
- 865fa0d7f7674f0faca826c0c4a4d3e8
- Award number (PIID)
- FA8571-25-P-0110
Description
This requirement is a sole source commercial supply for a certified, pre-owned Dragonfly IV Additive Manufacturing Electronics (AME) System to the 402d Electronics Maintenance Group (EMXG) at Robins AFB, GA. This procurement will be awarded to the OEM, Nano Dimension USA Inc. They are the developer of the Dragonfly IV AME System and do no allow for third party resellers/distributors of this product.
Award Overview
Award Number
FA8571-25-P-0110
Award Amount (SAM.gov award notice)
$249.0K
Award Date
Aug 25, 2025
Awardee
Awardee UEI
KHMYS7EV3FU6
Original Solicitation
Notice ID: 865fa0d7f7674f0faca826c0c4a4d3e8
Posted Date: Aug 25, 2025
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $50.0KSigned Sep 9, 2025
- $18.8KSigned Mar 19, 2025
Contacts
Contracting Officer
Primary Contact
Andrea Cervantes
Secondary Contact
Phillip Richardson
Documents
Files (8)
- Download
SSJ_Redacted.pdf
79 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Appendix C.pdf
283 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
CDRL A004 - Accident Incident Report .pdf
255 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
CDRL A003 - Contractors Safety Plan .pdf
252 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
CDRL A002 - Status Report - EnMS Training .pdf
253 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
CDRL A001 - Status Report - EMS Training .pdf
252 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Purchase Description .pdf
230 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Solicitation - FA857125Q0106.pdf
2.2 MBAdded in Combined Synopsis/Solicitation version 4Posted
Lifecycle
- 4Version 4Combined Synopsis/SolicitationArchived
Dragonfly IV AME System
- 6Version 6Award NoticeArchivedCurrent
Type changed from Combined Synopsis/Solicitation to Award Notice
Dragonfly IV AME System
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
See solicitation and it's attachments | - | Solicitation | 11/19/2026 |
The 76th CMXG Maintenance Group is looking for an AMT Equipment Maintenance and shall meet the specifications refereced below and in the attachment. 1. Period of Performance: The Contractor shall provide a Base Year and 2 Option Years 2. AMT HyperCare Maintenance Agreement (Applicable to: SF100, S/N: 4149003000751): This plan shall include, at a minimum: a) Support Help Desk Access: Direct access to AMT's expert support team for troubleshooting. b) Unlimited Service Visits: Covers all service visits due to machine errors (operator errors are excluded). c) Unlimited Parts Replacement: Covers replacements for parts that fail due to machine error. d) Ancillary Coverage: Coverage extends to included ancillary systems. e) Yearly Preventative Maintenance (PM): Schedule and perform one (1) comprehensive on-site PM inspection and optimization visit per contract year. 1) Annual Carbon Filter Replacement: Supply and install replacement carbon filters during the scheduled annual PM visit to maintain safety and efficiency 2) The Contractor shall provide a copy of the annual preventative maintenance (PM) schedule to the Government Point of Contact (GPOC) within ten (10) business days after contract award. 3) The Contractor shall notify the GPOC at least seven (7) business days prior to the actual scheduled PM visit to coordinate on-site arrival and base access. f)The Contractor shall be responsible for ensuring all services, replacement parts, and OEM components provided under this contract conform to the manufacturer's equipment specifications and are in accordance with (IAW) the terms and conditions outlined in this SOW. g) The Contractor must meet all requirements outlined IAW this SOW. h) The Contractor shall make all necessary adjustments to the work performed under the AMT Equipment Maintenance Service Agreement until the item/s are fully operational IAW the Original Equipment Manufacturer (OEM) specifications and to what is stated in this SOW. 3. One-Time PM Reinstatement Kit (Base Year Only) SF100, S/N: 414900300075 is currently out of warranty, Contractor shall provide all parts and labor required to allow equipment to be put on Hypercare Maintenance Agreement. | - | Market Research | 10/30/2026 |
*UPDATE* 12 November 2026 Please let Erin Crider @ erin.crider@us.af.mil know by 30 November 2026 if you would like a one-on-one session. Also, depending on participation we may extend the Industry day to 10 Dec 2026 to accommodate all interested vendors. *9 November 20206* The Warner Robins Air Logistics Center (ALC) is hosting an Industry Day on 9 December 2026, to solicit feedback from interested industry representatives regarding an initiative by AFLCMC/ROZ to sustain the Halvorsen Aircraft Loader (ACL) system. If your company is interested in participating in the Industry Day, please review the attached invitation which provides more details. ATTACMENTS: Industry Day Invitation DRAFT Performance Work Statement (PWS) | - | Special Notice | 12/02/2026 |
GasFlow DLP Printing Interface, developed by scientists at Los Alamos National Laboratory, helps resin-based 3D printing systems produce finer details, faster builds and more consistent part quality by controlling oxygen where curing happens most critically. The open-surface approach fits well with bottom-up DLP and related vat photopolymer processes, and it can enhance existing printer designs, as well as new platforms, by improving print fidelity, process stability and material flexibility. How it Works The system adds a second liquid beneath the printable resin inside the vat, creating a stable fluid-fluid interface between the two liquids. This interface is where the resin is polymerized, removing the need to pull the polymerized layer off the surface - an inherent default in the DLP process. The lower liquid is chosen to be an immiscible, high-density fluid, such as a perfluorinated fluid, that is treated with an inert gas and circulated continuously during printing. As it flows beneath the resin and above the transparent vat window, the lower liquid removes oxygen from the resin and introduces inert gas in its place, which reduces oxygen inhibition at the curing zone. With less oxygen interfering with polymerization, projected light can cure smaller features more reliably, more quickly and more uniformly across the part with less bleeding. Technical Description The patented GasFlow DLP Printing Interface is designed for additive manufacturing methods such as DLP, SLA and related photopolymer printing processes. The GasFlow DLP Printing Interface uses a first container or vat with a transparent portion, a first fluid positioned against that transparent portion and a second fluid that serves as the printable resin. The first fluid and second fluid form a fluid-fluid interface, with the first fluid located between the vat window and the resin. A circulation system moves the first fluid through the vat and an associated treatment container by way of conduits and a pumping mechanism. In representative embodiments, the first fluid is a perfluorinated solvent that has been treated with an inert gas such as nitrogen, helium, argon or carbon dioxide. As the treated first fluid circulates, it removes oxygen from resin at the interface and helps replace that oxygen with inert gas, which improves polymerization performance at the print surface. Oxygen in standard resin systems can suppress curing, which means more energy is required than necessary which in turn can create uneven polymerization that leaves parts overcured in some regions and undercured in others making very small features difficult to print. Features below about 50 microns in diameter may fail to print when normal oxygen levels are present. GasFlow DLP Printing demonstrated print speed improvement of at least one-third, with larger gains considered possible under optimized conditions. An added benefit to flowing fluid is that the system can provide temperature-control to help manage heat buildup during printing, which can improve part quality and widen the range of usable resin chemistries. Advantages Produces finer features and higher print resolution Reduces oxygen-related defects during curing Speeds printing compared with standard setups (oxygen exposed) Improves consistency across the part, including edge-to-center uniformity Supports retrofit potential for many bottom-up DLP printers Increases lifetime of liquid resin May enable use of resin chemistries that are otherwise difficult to process because of overheating or curing instability Market Applications Additive Manufacturing (resin 3D printers, printer upgrades, production platforms) Industrial Manufacturing (precision polymer parts, lightweight structures, fabrication tooling) Medical and Dental (custom polymer components, device fabrication, detailed models) Electronics and Microfabrication (fine-feature polymer structures, patterned parts, prototyping) Research and Laboratory Equipment (materials development, process testing, advanced printing systems) Aerospace and Defense (complex geometries, lattice structures, specialty components) TRL 4 US Patent No. 11,911,955 LA-UR-26-29477 LANL Tech Partnerships: Unlock the Innovative Potential Los Alamos National Laboratory offers a wide range of cutting-edge technologies and capabilities that may provide your company with a competitive edge in the market and unlock the innovative potential that can enhance, refine, and revolutionize your products. LANL’s licensing program focuses on moving inventions developed by our researchers to commercial innovations. Patented and patent pending inventions and copyrighted software are available to existing and start-up companies through exclusive and non-exclusive licensing agreements. For specific discussions, please contact licensing@lanl.gov. Note: This is not a call for external services for the development of this technology. https://www.lanl.gov/engage/collaboration/feynman-center/partner-with-us/licensing-technology m.lanl.gov/tech-search | - | Special Notice | 04/06/2027 |
* UPDATE 7 October 2026* Extend the response due date to 5 November 2026 5:00 PM EST *UPDATE* 30 September 2026 - Add Attachment 6 - DRAFT PWS - Update retrieval instructions for Attachment 2 - Technical Manual Operations Instructions (Please see attachment section below for retrieval instructions) 24 September 2026 This market survey is being conducted to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements for qualification laid out in the PWS of the Halvorsen 25k Aircraft Cargo Loader for use by United States Air Force (USAF) personnel. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The government will not reimburse participants for any expenses associated with their participation in this survey. *All responses are due by 5 November 2026* *Please note all of the attachments will not be attached. Please see below for instructions: ATTACHMENTS: Attachment 1: THPO Report Attachment 2: Technical Manual Operations Instructions (please see page 2, instruction #5 on Sources Sought Synopsis to request this attachment) Attachment 3: Technical Manual Work Package Operator and Maintenance Instructions (please see page 2, instruction # 5 on Sources Sought Synopsis to request this attachment) Attachment 4: Halvorsen OIM 623-4300-OI, 2019 (please see page 2, instruction #5 on Sources Sought Synopsis to request this attachment) Attachment 5: Halvorsen Follow-On Sources Sought Synopsis Attachment 6: DRAFT Performance Work Statement (PWS) | - | Market Research | 11/05/2026 |
Additional Details
Solicitation Number
FA857125Q0106
Archive Date
Sep 9, 2025