GovChime
Notice ID: d5638ed8daeb4468ae25fb64d322149aSolicitationArchived

Emergency Water Conveyance Prototype (EWCP)

Archived on September 25, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM AKDT
Posted
September 1, 2026
Notice type
Solicitation
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION PACIFIC OCEAN.ENDIST ALASKA.W2SN ENDIST ALASKA
Place of performance
Juneau, AK, Juneau, Alaska, 99801
PSC
Y1LC: CONSTRUCTION OF TUNNELS AND SUBSURFACE STRUCTURES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W911KB26RWP02
Notice ID
d5638ed8daeb4468ae25fb64d322149a

Description

Project Requirement: Develop and demonstrate a proof of concept for, and design and construct, a new EWCP to protect the Mendenhall Valley, Juneau, Alaska associated with the severe and escalating flood hazard from GLOFs originating in Suicide Basin. The intent of this project is to prevent water levels in Suicide Basin from reaching an elevation sufficient to produce enough hydraulic pressure against Mendenhall Glacier to initiate a GLOF event. The EWCP shall prevent water levels in the Suicide Basin GDL from rising above an elevation of 1,100 feet, NAVD88 while safely managing peak discharge rates of approximately 1,000 cubic feet per second (CFS) to protect downstream communities.

Project Background: The Mendenhall Valley in Juneau, Alaska, is subject to recurrent glacial lake outburst flood (GLOF) events. A GLOF is characterized by the rapid discharge of water from a glacier-dammed lake (GDL), which releases a high-volume surge of water downstream. The GLOF events affecting the Mendenhall Valley originate from Suicide Basin, an over-deepened bedrock depression dammed by the Mendenhall Glacier. Suicide Basin was formed by the retreat of the Suicide Glacier, a tributary that formerly joined the main Mendenhall Glacier. Suicide Basin GLOF events typically initiate shortly after the basin reaches maximum capacity and begins to overtop the surface of the Mendenhall Glacier, which is estimated to impound a pool at an elevation of 1,350 feet, North American Vertical Datum of 1988 (NAVD88) in the year 2026. The resulting floodwaters route subglacially beneath the Mendenhall Glacier, discharge into Mendenhall Lake, and flow down the Mendenhall River to its outlet at Fritz Cove. Following the release of water from a GLOF event, the pool elevation in Suicide Basin is about 980 feet, NAVD88. The water levels begin to increase again as Mendenhall Glacier impounds rainfall and ice melt runoff in Suicide Basin. Recent events suggest the basin is capable of filling and releasing a GLOF event at least once per year. Due to the dynamic nature of the system and glaciers, these elevations are subject to change. These GLOF events have been documented annually since 2011, with a marked escalation in peak discharge magnitude from 2023 through 2025. These recent high-flow events have resulted in severe inundation and significant damage within the City and Borough of Juneau, Alaska.

Industry Day: An Industry Day will be held in Juneau, Alaska on Friday, August 21, 2026 from 9:00 - 11:00 AM AKDT at Andrew Hope Building, Council Chambers (3rd Floor), 320 W. Willoughby Ave., Juneau, AK. A virtual option will be available for Interested Offerors unable to attend in person. Registration is REQUIRED. Please review the full posting for more information including registration instructions for this upcoming event at: https://sam.gov/workspace/contract/opp/b8c8afee7ca542a294106bf7f966a434/view

Industry Day Update: A copy of the video presentation, slide show and attendance rosters from the Industry Day are available online at: https://sam.gov/workspace/contract/opp/9c796bf35e024cc7941802d0a4e9dacf/view

Amendment 0001: Published 1 September 2026, Amendment 0001 includes revisions to the Program Solicitation, Attachment 1: Request for White Papers, Attachment 2: Draft STEP 2: Invitation for Pitch Presentation and the inclusion of the questions and answers from the Bidder Inquiry Report. There are no changes to the Attachment 3 - Draft Model OT Agreement at this time.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Lifecycle

  1. 1
    Version 1SolicitationArchived

    Emergency Water Conveyance Prototype (EWCP)

    Notice 0cbaa5fc6b504694a34c251244ea7f0f on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Emergency Water Conveyance Prototype (EWCP)

    Notice 756ec2c715f74cb38d5935061cfb6bcc on SAM.gov

  3. 3
    Version 3SolicitationArchived

    Emergency Water Conveyance Prototype (EWCP)

    Notice a6eaa7dc33f84f9f90137b9ebbfe5c09 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    Emergency Water Conveyance Prototype (EWCP)

    Notice 3c67c92a16f549679bf5cc5a9fa8ea0c on SAM.gov

  5. 5
    Version 5SolicitationArchived

    Emergency Water Conveyance Prototype (EWCP)

    Notice 3e8070da57f4411c8652157388c1ab6e on SAM.gov

  6. 7
    Version 7SolicitationArchivedCurrent

    Emergency Water Conveyance Prototype (EWCP)

    Notice d5638ed8daeb4468ae25fb64d322149a on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

W911KB26RWP02

Archive Date

Sep 25, 2026

Office Address

ANCHORAGE, AK, 99506-0898