Notice ID: 28aad5fa2c224916ac7fb98b2e921a12Sources Sought
Norfolk CSRM Phase 1A-Water Street Floodwall Standalone Construction DBB Project located in Norfolk, Virginia
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- August 10, 2026
- Notice type
- Sources Sought
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST NORFOLK.W2SD ENDIST NORFOLK
- Place of performance
- Norfolk, Virginia, 23510
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W9123626X1CBJ
- Notice ID
- 28aad5fa2c224916ac7fb98b2e921a12
Description
Please see attachment for detials.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (1)
- Download
I.A.02_Sources Sought for NCSRM PH1A-Water Street Floodwall 08102026.pdf
219 KBAdded in Sources Sought version 4Posted
Links (2)
- Norfolk City CSRM Linkwww.resilientnorfolk.comPosted
- USACE Norfolk CSRM Linkwww.nao.usace.army.milPosted
Lifecycle
- 2Version 2Special NoticeArchived
Industry Day for Norfolk CSRM Phase 1A Construction Project located in Norfolk, VA
- 3Version 3Sources Sought
Type changed from Special Notice to Sources Sought
Norfolk CSRM Phase 1A-Water Street Floodwall Standalone Construction DBB Project located in Norfolk, Virginia
- 4Version 4Sources SoughtCurrent
Norfolk CSRM Phase 1A-Water Street Floodwall Standalone Construction DBB Project located in Norfolk, Virginia
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
10/30/2026 - Dear Participants, Thank you for your active participation and invaluable support during our Norfolk CSRM PH1A Industry Day! We hope you found the session informative and walked away with valuable insights about our ongoing initiatives. To help you stay connected and informed, we have compiled the event materials for your reference: Industry Day Slides - Attached for you review and future reference. Industry Day Handout - Attached for your review and future reference. Session Recording - Watch the full presentation on YouTube--link provided below! Attendance Sheet - Now updated and attached to this record. Questions FROM Industry - Responses pending. Please continue to follow our program updates as we move forward. We appreciate your continued partnership and look forward to working with you on future milestones! REMINDER: We are still accepting responses for our Questions TO Industry, see attached below. 10/20/2026 - Questions TO Industry added as attachment. Response requested NLT 04 NOVEMBER 2026. 10/07/2026 - Update made to the Eventbrite attachment to remove FAR reference 36.3, which is a reference to DB and is not applicablle to this procurement. The U.S. Army Corps of Engineers (USACE) Norfolk District is scheduled to host an “Industry Day” event on October 29, 2026, from 9:30 a.m. to 11:30 a.m., Eastern Daylight Time (EDT) for construction contractors interested in the Norfolk CSRM Phase 1A Project. The event will provide an opportunity for Large and Small Business contractors to learn about the upcoming construction project. The one-day event will include a presentation encompassing a brief overview of the Norfolk CSRM program, Phase 1A contracts with a focus on Phase 1A Floodwall SATOC, followed by a live Q&A session. Please submit questions by close of business (COB) on 22 October to provide for a productive discussion (see below instructions to submit questions). Due to interests in the project and space constraints, participants may attend in-person or virtually. The Industry Day will be held at the USACE Norfolk District Building (803 Front Street, Norfolk, VA 23510) on the first floor. Call-in information will be sent to participants prior to the event. Please see attached document for more information on the project and how to RSVP. | 100% | Special Notice | 10/22/2026 |
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project. | 76% | Solicitation | 10/21/2026 |
Sources Sought - The U.S. Army Corps of Engineers, Charleston District (SAC) is conducting market research to identify qualified and interested contractors capable of performing complex heavy-civil and coastal flood-risk-management construction under a Single-Award Task Order Contract (SATOC). This notice is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or a commitment by the Government to issue a solicitation or award a contract. Responses will be used to assess industry interest, capability, bonding capacity, preferred delivery methods, and small business subcontracting opportunities.No proposals or offers are requested or will be accepted under this Sources Sought. | 75% | Market Research | 11/23/2026 |
Bid Abstract Posted 5/12/2026***********************************Request for Information Responses Posted 4/29*********************************************Project Title: Alameda Zone 7 Flood Control Channels PL 84-99 Repairs Phase 2 and Phase 3 Project Location: ALAMEDA COUNTY, CAProject Description: This is an invitation for bids for the Alameda Zone 7 PL 84-99 Repair project is an Operations and Maintenance project to repair storm damage to flood control channels in Alameda County. Damages consisted of erosion and bank failures during a series of atmospheric rivers between December 2022 and March 2023. Work for this project is noted as Alameda Zone 7 Flood Control Channels, PL 84-99 Project, Phase 2 and Phase 3. The magnitude of construction is between $10,000,000-$25,000,000. This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. This Invitation for Bids is a small business set aside. The size standard is $45,000,000. All questions should be directed to the Contract Specialist, Logan Champlin (logan.champlin@usace.army.mil). Phase 2 of the project consists of a total of 21 repair sites and is the base contract to be worked in 2026. Phase 3 of the project consists of a total of 20 repair sites and is the optional work that, if exercised, will be performed in 2027. The existing flood control channels typically have earthen slopes previously constructed to grades of 2H:1V, with channel heights ranging from 15-30 feet. The damaged sites vary in sizes. Repairs to damaged sites will restore the slopes to original grade prior to the storm damages. A site visit will be conducted on 20 April 2026 at 9:00 AM at 6900 W Las Positas Blvd, Pleasanton, CA 94588. This requirement is a TOTAL SMALL BUSINESS SET ASIDE and will be issued as an Invitation for Bids (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract. ALL BIDS will be due on 11 MAY 2026 at 12:00 PM PDT. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARDPROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers.b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml.c) Offers MUST BE submitted electronically through the PIEE website.d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments.e) See attachments -PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals. | 72% | Solicitation | 05/11/2026 |
This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. The size standard for this code is $45,000,000. All questions should be directed to the Contract Specialist, Logan Champlin (logan.champlin@usace.army.mil). Estimated Cost Range is between $10,000,000-$25,000,000 PROJECT TITLE: Alameda Zone 7 PL 84-99 Repairs (Phase 2 and 3) PROJECT LOCATION: ALAMEDA COUNTY, CA PROJECT DESCRIPTION: The Alameda Zone 7 PL 84-99 Repair project is an Operations and Maintenance project proposed by USACE to repair storm damage to flood control channels in Alameda County. Damages consisted of erosion and bank failures during a series of atmospheric rivers between December 2022 and March 2023.Work for this project is noted as ?Zone 7 Flood Control Channel, PL 84-99 Project, Phase 2 and Phase 3.?Phase 2 of the project consists of a total of 21 repair sites including four (4) sites on Arroyo de la Laguna , four (4) sites along Arroyo del Valle, four (4) sites along Alamo Canal, eight (8) sites along Arroyo, and one (1) site along Tassajara Creek. The Government estimates that this work will be completed in the summer of 2026.Phase 3 of the project consists of a total of 20 repair sites including sixteen (16) along South San Ramon Creek, three (3) sites along Alamo Canal, and one (1) site on Alamo Creek. The Government estimates that this work will be completed in the summer of 2027.The existing flood control channels typically have earthen slopes previously constructed to grades of 2H:1V, with channel heights ranging from 15-30 feet. The damaged sites vary in sizes. Repairs to damaged sites will restore the slopes to original grade prior to the storm damages. Earthwork will start with excavation of the damaged area, removing disturbed soil and vegetation within the area. Repairs will consist of placing Rock Slope Protection (RSP) at the waterside slope toe, placing soil-filled RSP up to the 10-year water surface elevation, and restoring the upper portion of the slope with compacted backfill. After the remaining slope is backfilled and compacted above the stone protection, erosion control matting will be installed and hydroseeded. Work is to be completed from land access only to the work/repair areas. This requirement is a TOTAL SMALL BUSINESS SET ASIDE and will be issued as an Invitation for Bids (IFB) which will result in the award of a single Firm Fixed Price (FFP) contract. The solicitation will be available on/about 31 March 2026 for viewing/downloading. ALL BIDS will be due on/about 30 April 2026 at 12:00 PM PDT. The specific date and time will be identified in the solicitation. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARDPROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments -PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals. | 72% | Pre-Solicitation | 03/30/2026 |
Additional Details
Solicitation Number
W9123626X1CBJ
Archive Date
Aug 24, 2027
Office Address
NORFOLK, VA, 23510-1096