Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
Archived on September 23, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM EDT
- Posted
- September 4, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- National Aeronautics and Space Administration
Notice details
- Office
- NASA KENNEDY SPACE CENTER
- Place of performance
- 32899
- Last updated
- Nov 8, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 80KSC025R0009
- Notice ID
- 6a93abd024f5457c85e027145c20745b
Description
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Vendor
A. WEST ENTERPRISE, LLCContract end date
Dec 9, 2027
NAICS
237130
Agency
National Aeronautics and Space Administration
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (23)
- Download
80KSC025R009 Amend 0007.pdf
162 KBAdded in Solicitation version 13Posted - Download
80KSC025R009 Amend 0006.pdf
178 KBAdded in Solicitation version 11Posted - Download
80KSC025R009 Amend 0005.pdf
163 KBAdded in Solicitation version 10Posted - Download
Environmental Results - 99300.pdf
16 MBAdded in Solicitation version 9Posted - Download
80KSC025R009 Amend 0004.pdf
274 KBAdded in Solicitation version 9Posted - Download
79K50591 VAB_Refresh Tower C Drawings_Sign and Seal.pdf
20 MBAdded in Solicitation version 8Posted - Download
80KSC025R009 Amend 0003.pdf
163 KBAdded in Solicitation version 8Posted - Download
80KSC025R009 Amend 0002 roster.pdf
763 KBAdded in Solicitation version 7Posted - Download
80KSC025R009 Amend 0001 VAB Tower C.pdf
272 KBAdded in Solicitation version 4Posted - Download
80KSC025R0009 Section L Appendix 2 - Acceptable Identity Guide.pdf
169 KBAdded in Solicitation version 3Posted - Download
80KSC025R0009 Section L Appendix 4 - Past Performance Questionnaire.pdf
145 KBAdded in Solicitation version 3Posted - Download
80KSC025R0009 Section L Appendix 1 - Temporary Badging Request Form.pdf
75 KBAdded in Solicitation version 3Posted - Download
80KSC025R0009 Section L Appendix 3 - Pre-Proposal Inquiry Form.xlsx
14 KBAdded in Solicitation version 3Posted - Download
80KSC025R0009 VAB Power Phase 1 (Tower C).pdf
521 KBAdded in Solicitation version 2Posted - Download
80KSC025R0009 - Attachment J-H PIV KDP-KSC-P-3722.pdf
106 KBAdded in Solicitation version 2Posted - Download
80KSC025R0009 - Attachment J-G PCN 99300 PCM Construction Schedule Tower C.pdf
600 KBAdded in Solicitation version 2Posted - Download
80KSC025R0009 - Attachment J-F 79K50591 VAB_Refresh Tower C Drawings.pdf
9.2 MBAdded in Solicitation version 2Posted - Download
80KSC025R0009 - Attachment J-E 79K50593 Specifications VAB Towers B-C-D.pdf
2.5 MBAdded in Solicitation version 2Posted - Download
80KSC025R0009 - Attachment J-D Certification of Progress Payments.docx
31 KBAdded in Solicitation version 2Posted - Download
80KSC025R0009 - Attachment J-C Wage Determination 4jul2025.pdf
200 KBAdded in Solicitation version 2Posted - Download
80KSC025R0009 - Attachment J-B KSC Project Specific Requirements.pdf
386 KBAdded in Solicitation version 2Posted - Download
80KSC025R0009 - Attachment J-A Project Deliverables.pdf
507 KBAdded in Solicitation version 2Posted - Download
Presol Synopsis VAB Tower C.pdf
170 KBAdded in Presolicitation version 7Posted
Lifecycle
- 6Version 6PresolicitationArchived
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 3Version 3SolicitationArchived
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 4Version 4SolicitationArchived
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 7Version 7SolicitationArchived
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 8Version 8SolicitationArchived
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 9Version 9SolicitationArchived
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 10Version 10SolicitationArchived
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 11Version 11SolicitationArchived
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- 13Version 13SolicitationArchivedCurrent
Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
80KSC025R0009
Archive Date
Sep 23, 2025