Additional RFI's for Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado
Archived on October 3, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM MDT
- Posted
- September 15, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 334519: Other Measuring and Controlling Device Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTH PACIFIC.W075 ENDIST ALBUQUERQUE
- Place of performance
- Albuquerque, New Mexico, 87109
- Last updated
- Nov 8, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912PP25QA044
- Notice ID
- d1b5609b14c146d8b1c88e9ff2a85776
Description
Weather Station Upgrade:
- Abiquiu Lake Dam, New Mexico
- Cochiti Lake Dam, New Mexico
- Conchas Lake Dam, New Mexico
- John Martin Lake Dam, Colorado
- Santa Rosa Lake Dam, New Mexico
- Trinidad Lake Dam, Colorado
In accordance with these specifications the Contractor must supply all plant, labor, materials, appurtenances, equipment, shop facilities, supervision, tools, staging, and any other items necessary to procurement, installation, programming, and configuration of updated meteorological monitoring system equipment. The system will consist of a new weather sensor suite measuring key parameters including, but not limited to, temperature, precipitation, wind speed and direction, and solar radiation. Data will be collected by a satellite linked data logger and transmitted via a GOES satellite antenna to the National Weather Service (NWS) in accordance with established data submission standards. Additionally, a new evaporative gauge with an automatic refill system will be installed to provide accurate measurements of evaporation rates. This system upgrade is critical for enhancing flood risk management capabilities, improving the accuracy of hydrological modeling, and supporting informed decision-making regarding reservoir operations and dam safety. The contractor will be responsible for all aspects of the installation, including site preparation, equipment mounting, electrical connections, data configuration, system testing, and documentation, ensuring full compliance with USACE and NWS regulations and cybersecurity protocols. The Contractor must verify all existing conditions, dimensions, and quantities prior to start of work.
Current weather monitoring infrastructure is aging and has limited measurement capability. These accuracy improvements will enhance assessment of hydrologic conditions and improve prediction and response to extreme weather events. This project addresses this need by upgrading and expanding the existing weather station network, ensuring consistent, high-quality data transmission to the NWS via GOES satellite, and providing critical input for improved hydrologic modeling, ultimately bolstering the USACE’s ability to fulfill its mission through cooperative efforts with the NWS.
***Please remember to sign (aknowledge) each amendment and include in submission of quote.***
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (5)
- Download
Additional RFIs (Santa Rosa Site Specific).pdf
64 KBAdded in Solicitation version 5Posted - Download
Solicitation Amendment W912PP25QA0440002 SF 30.pdf
3.1 MBAdded in Solicitation version 3Posted - Download
Solicitation Amendment W912PP25QA0440001 SF 30.pdf
3.3 MBAdded in Solicitation version 2Posted - Download
RFIs.pdf
75 KBAdded in Solicitation version 2Posted - Download
Solicitation - W912PP25QA044.pdf
2.9 MBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado
- 2Version 2SolicitationArchived
AMD 0001 & RFI's for Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado
- 3Version 3SolicitationArchived
AMD 0002 (Submission Instructions) for Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado
- 5Version 5SolicitationArchivedCurrent
Additional RFI's for Weather Station Upgrade, Multiple Dam Locations, New Mexico and Southern Colorado
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912PP25QA044
Archive Date
Oct 3, 2025
Office Address
ALBUQUERQUE, NM, 87109-3435