AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Archived on February 28, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM MST
- Posted
- January 20, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI
- Place of performance
- Payson, Arizona, 85541
- PSC
- Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 6982AF25B000019
- Notice ID
- c4ac3d7a1955421194b12e634e31f4ca
Description
PROJECT NUMBER: AZ FS 289(1)
PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT
PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289.
SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic.
PRINCIPAL WORK ITEMS:
- 20304-2000 Removal of Bridge: 1 LPSM
- 20401-0000 Roadway Excavation: 3,100 CUYD
- 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD
- 20441-0000 Waste: 2,300 SQFT
- 30202-2000 Roadway Aggregate, Method 2: 750 TON
- 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON
- 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD
- 55201-0200 Structural Concrete, Class A (AE): 252 CUYD
- 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT
- 55401-1000 Reinforcing Steel: 14,200 LB
- 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB
- 55601-0900 Bridge Railing, Steel: 162 LNFT
- 62801-000 Temporary Stream Diversion: LPSM
ANTICIPATED SCHEDULE:
Advertisement – October 2025
Award – December 2025
NTP – January 2026
Contract Completion – October 2026
Due to weather, no onsite work is anticipated between January and April 2026
ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (15)
- Download
BidTabulationReport.AZ FS 289(1).pdf
1.6 MBAdded in Solicitation version 14Posted - Download
Bid Opening Summary AZ FS 289(1) AZ NFSR 289 Bridge Replacement - Copy.pdf
120 KBAdded in Solicitation version 12Posted - Download
QA AZ NFSR 289 Bridge Replacement. 11 18 2025.pdf
139 KBAdded in Solicitation version 12Posted - Download
QA AZ NFSR 289 Bridge Replacement. 11 17 2025.pdf
134 KBAdded in Solicitation version 12Posted - Download
Amendment A002 AZ FS 289(1) AZ NFSR 289 Bridge Replacement.pdf
878 KBAdded in Solicitation version 5Posted - Download
QA. AZ NFSR 289 Bridge Replacement. 11.12.25.pdf
134 KBAdded in Solicitation version 5Posted - Download
Amendment A001 AZ FS 289(1) AZ NFSR 289 Bridge Replacement.pdf
279 KBAdded in Solicitation version 4Posted - Download
QA AZ NFSR 289 Bridge Replacement. 11.04.25.pdf
88 KBAdded in Solicitation version 4Posted - Download
QA. AZ NFSR 289 Bridge Replacement. 10.27.25.pdf
81 KBAdded in Solicitation version 4Posted - Download
AZ FS 289(1) Design Physical Data.zip
2.6 MBAdded in Solicitation version 4Posted - Download
AZ NFSR 289 Tonto Creek Bridge Final Hydraulics Tech Memo.pdf
7.8 MBAdded in Solicitation version 4Posted - Download
AZ NFSR 289 Tonto Creek Bridge Geotechnical Report.pdf
6.3 MBAdded in Solicitation version 4Posted - Download
AZ NFSR 289 Tonto Creek Bridge Pavement Report.pdf
9.0 MBAdded in Solicitation version 4Posted - Download
AZ NFSR 289 Tonto Creek Bridge Plans Sealed.pdf
17 MBAdded in Solicitation version 4Posted - Download
6982AF25B000019.IFB AZ FS 289(1) AZ NFSR 289 Bridge Replacement.pdf
5.4 MBAdded in Solicitation version 4Posted
Lifecycle
- 9Version 9PresolicitationArchived
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 2Version 2SolicitationArchived
Type changed from Presolicitation to Solicitation
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 3Version 3SolicitationArchived
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 4Version 4SolicitationArchived
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 5Version 5SolicitationArchived
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 6Version 6SolicitationArchived
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 7Version 7SolicitationArchived
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 11Version 11SolicitationArchived
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 12Version 12SolicitationArchived
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
- 14Version 14SolicitationArchivedCurrent
AZ FS 289(1) AZ NFSR 289 BRIDGE REPLACEMENT
Similar Opportunities
Additional Details
Solicitation Number
6982AF25B000019
Archive Date
Feb 28, 2026
Office Address
LAKEWOOD, CO, 80228