GovChime
Notice ID: a2f4315882bb4738be1bf106abadfe71SolicitationArchived

Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

Archived on September 19, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
September 4, 2025
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
W07V ENDIST VICKSBURG
Place of performance
Calion
Last updated
Nov 8, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W912EE25BA009
Notice ID
a2f4315882bb4738be1bf106abadfe71

Description

**04 September 2025: Bid Opening Abstract Posted: See in Abstract in Attachments** **29 August 2025: See Correct SF1442 in Attachments** **27 August 2025 Amendment 0003 issued: See Amendment in Attachments** **20 August 2025 Amendment 0002 issued: See Amendment in Attachments** **15 August 2025, Presented Pre-Meeting Slides on Tuesday, August 12, 2025: See In Attachments** ** 05 August 2025 Amendment 0001 issued: see amendment in attachments ** The Vicksburg District will hold a virtual pre-bid meeting on Tuesday, August 12, 2025, at 14:00 Central Standard Time on Microsoft Teams. All bidders are invited to attend. A meeting link will be included in this amendment. If bidders are unable to successfully use link in amendment, please email Amy Starks @ Amy.L.Starks@usace.army.mil and link will be forwarded to bidder. W912EE - The United States Army Corps of Engineers, Vicksburg District, has issued Invitation for Bid (IFB) Solicitation Number W912EE25BA009 for Stoplog Slot Construction, Ouachita River, Thatcher Lock and Dam, Calion, Arkansas. The work consists of furnishing all plant, labor, materials, and equipment, for mobilization and demobilization; cofferdams and dewatering; construction of the new stoplog slots and associated work, including demolition, concrete work, bulkhead slot armor, bulkhead sill beam, handrails, miscellaneous metals, and painting; and environmental protection. ** See attachments for Soliciation Document w/Specifications and Drawings **

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (18)

  • C.04.Abstract of Bids_W912EE25BA009_Stoplot Slot Construction.pdf

    160 KBAdded in Solicitation version 16Posted
    Download
  • B.08.Revised SF1442_Solicitation Amendment - W912EE25BA009-0001_Corrected.pdf

    3.1 MBAdded in Solicitation version 13Posted
    Download
  • B.08.Solicitation Amendment W912EE25BA009-0003 SF 30.pdf

    3.2 MBAdded in Solicitation version 12Posted
    Download
  • B.08.Amendment W912EE25BA009-0003_TSLSC Pre-Bid Meeting Revised Slides.pdf

    1.7 MBAdded in Solicitation version 12Posted
    Download
  • B.08.Amendment W912EE25BA009-0003_Sheet 8_19 As Builts.pdf

    716 KBAdded in Solicitation version 12Posted
    Download
  • B.08.Amendment W912EE25BA009-0003_Revised Drawings S-520.pdf

    660 KBAdded in Solicitation version 12Posted
    Download
  • B.08.Amedment W912EE25BA009-0002_Specifications.pdf

    1.3 MBAdded in Solicitation version 11Posted
    Download
  • B.08.Amendment W912EE25BA006-0002_Plans.pdf

    2.8 MBAdded in Solicitation version 10Posted
    Download
  • B.08.Amendment W912EE2BA009-0002_Combined Bulkheads_from Lock 1 Drawings.pdf

    7.1 MBAdded in Solicitation version 10Posted
    Download
  • B.08.Solicitation Amendment W912EE25BA009-0002 SF30.pdf

    755 KBAdded in Solicitation version 10Posted
    Download
  • B.07.W912EE25BA009_TSLSC_Pre-Bid Meeting Slides_8.12.25.pptx

    9.5 MBAdded in Solicitation version 9Posted
    Download
  • B.08.W912EE25BA009_Thatcher_Calion Lock and Damy AS BUILTS HANDRAIL_810_12_13_14.pdf

    1.8 MBAdded in Solicitation version 9Posted
    Download
  • B.08.Monolith plans from Thatcher_Calion Lock and Dam AS BUILITS.pdf

    28 MBAdded in Solicitation version 8Posted
    Download
  • B.08.Solicitation Amendment W912EE25BA0090001 SF 30.pdf

    244 KBAdded in Solicitation version 6Posted
    Download
  • B.08.Amendment W912EE25BA009-0001_Specs.pdf

    35 KBAdded in Solicitation version 5Posted
    Download
  • B.08.Revised SF1442_Solicitation Amendment - W912EE25BA009-0001.pdf

    1.6 MBAdded in Solicitation version 5Posted
    Download
  • B.08.W912EE25BA009_Stoplog Slots_Drawings_Plans.pdf

    25 MBAdded in Solicitation version 4Posted
    Download
  • B.08.Solicitation - W912EE25BA009.pdf

    3.1 MBAdded in Solicitation version 4Posted
    Download

Lifecycle

  1. 2
    Version 2Sources SoughtArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice 122655213d2d4d029cff26c384b36a34 on SAM.gov

  2. 4
    Version 4SolicitationArchived

    Type changed from Sources Sought to Solicitation

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice dfbf0fe44bed4c5ab1302c0bef8ae242 on SAM.gov

  3. 5
    Version 5SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice edf16611ddd64837ad4035b9dc750a43 on SAM.gov

  4. 6
    Version 6SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice dc4008114c574a10bc9a33b5a950eb56 on SAM.gov

  5. 7
    Version 7SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice e479f73ebf7546a1a823d83be7e255cb on SAM.gov

  6. 8
    Version 8SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice c28e08e5ed9743a3b1340ae144675e36 on SAM.gov

  7. 9
    Version 9SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice 2b002a3e24134b3081e02c103873e7f1 on SAM.gov

  8. 10
    Version 10SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice 10f456513a35428198ed36508dc7613e on SAM.gov

  9. 11
    Version 11SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice 95b16449454749a3b9365566ba4fb662 on SAM.gov

  10. 12
    Version 12SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice 2e0329a5e09f4569ab9c60bbee0115eb on SAM.gov

  11. 13
    Version 13SolicitationArchived

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice 83c472f97987452bb1155a328a85cbd2 on SAM.gov

  12. 16
    Version 16SolicitationArchivedCurrent

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice a2f4315882bb4738be1bf106abadfe71 on SAM.gov

  13. 18
    Version 18Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice 9b8ad06ba2af450cbe96309de01ff7b7 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeJul 9, 2025

    Stoplog Slot Construction Ouachita River, Thatcher Lock and Dam, Calion, Arkansas

    Notice 44589c22e1774ed492b6a8a26866cc46 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W912EE25BA009

Archive Date

Sep 19, 2025