GovChime
Notice ID: 23711e40ae004665b0bc467208cb2b1fSolicitation

Creek Fire Beasore Road Repairs

Archived on February 13, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−07:00
Posted
February 13, 2024
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
Place of performance
Oakhurst, CA
Last updated
Dec 4, 2025

Identifiers

Solicitation number
12363N23R4018
Notice ID
23711e40ae004665b0bc467208cb2b1f

Description

The project consists of repairing 5.49 miles of Beasore Road on the Sierra National Forest, California. Work shall include but is not limited to cleaning and reconditioning the culverts along the road, replacing 600 linear feet of 36 corrugated metal pipe, installing metal end sections, and installing a metal spillway. Work will also include the 6 inches full depth reclamation from mile post 24.14 to 29.63, installing a geogrid Tensar TriAx TX7 or equivalent (Optional item), grading & compacting the pulverized material, importing & placing base rock to correct lower areas, placing rip rap on outlets and ditches, placing a 4 layer of hot mix asphalt and painting two coats of a double yellow center line. Currently Norris Creek Bridge is closed, contractors shall plan to deliver supplies and materials using Beasore road to complete the work west from Norris Creek bridge and use Minarets Road and for the remain work east from Norris Creek Bridge. There is an alternative detour route but only for high clearance vehicles and pickup trucks. The project location is from Oakhurst, CA (93644), travel 3.2 miles North on highway 41, turn right onto Road 222/Bass Lake Road, continue South for approximately 2.4 miles, slight left onto Beasore Road, continue for approximately 33.5 miles until reach the beginning of the project (37.504292, -119.370184). The magnitude of construction for this project is between $5,000,000.00 and $10,000,000.00. Offers should be emailed to Catherine Whitted at catherine.whitted@usda.gov by June 16, 2023 at 4:00 pm PDT.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:12363N23R4018
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationApr 28, 2023

    Creek Fire Beasore Road Repairs

    Notice dbaded0018ed4788b7ffced2bbb5c7d8 on SAM.gov

  2. 7×
    SolicitationCurrentMay 17, 2023

    Creek Fire Beasore Road Repairs

    Notice 23711e40ae004665b0bc467208cb2b1f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
80%
Solicitation11/17/2026
12363N23Q4035 This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation and proposals are being requested. PROJECT DESCRIPTION: California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement The California Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement is a National BPA that will consist of a variety of work including both Road Maintenance service types of work and Road Construction types of work. The BPA will have a period of performance from early spring 2023 through March 2033 and can be utilized on all California Federal Forests and Grasslands and is available for all federal agencies to utilize. This solicitation is issued as a request for quotation (RFQ). This solicitation will remain Open and Continuous to add vendors when determined necessary for the 10-year period it is active. Make sure your firm is updated and registered in the System for Award Management system (SAM) and current to conduct government business. Due to recent storm damage, emergency repairs are necessary to repair road infrastructure and we expect to issue calls before the closing date. As vendors are being evaluated for zones, we may issue call orders to early offerors before the due date. Please read the entire solicitation thoroughly to ensure all requirements in your response are included. PROJECT LOCATION: Projects shall covers the state of California including the following forests; Angeles, Cleveland, Eldorado, Humboldt-Toiyabe, Inyo, Klamath, Lake Tahoe Basin Management Unit, Lassen, Los Padres, Mendocino, Modoc, Plumas, San Bernardino, Sequoia, Shasta-Trinity, Sierra, Six Rivers, Stanislaus, and Tahoe National Forests and Butte Valley National Grassland. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around March 15, 2023. Engineering point of contact is Douglas Anderson, telephone: (707) 373-6265. NAICS 237310 with size standard $45 mil. This project is set aside 100% for small business. ALL QUOTES SHALL BE EMAILED TO: chad.bullock@usda.gov; james.kaminski@usda.gov & B_01_QU.r8ld7xo1wy1sggsv@u.box.com on or BEFORE MARCH 15, 2023, 4:30 PM PACIFIC TIME. All documents will be submitted electronically; follow this naming convention for your 2 attachments California FERM-VendorName-Quote AND California FERM-VendorName-Technical.
80%
Combined Synopsis03/15/2023
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. Interested vendors should respond to this sources sought announcement through the Procurement Integrated Enterprise Environment (PIEE) solicitation module by providing a full capabilities statements, socio-economic status, applicable NAICS codes, prior experience in road construction and repair, past performance, government contract numbers for highway work, bonding status letter from financial institution, Please see Sources Sought Notice attached with this announcement. (See attachments for further information)
76%
Pre-SolicitationOpen
PROJECT: WA ERFO FS MTBKR605 2020-1(2), Forest Road 7810 MP 0.1 Repair LOCATION: 22 miles south of Enumclaw, WA WORK: This project consists of bank stabilization and stream diversion. See “Project Description” posted under Attachments for additional details. See the Preliminary Letter under Attachments for important access information. LENGTH: 0.05 miles TENTATIVE COMPLETION DATE: Fall 2027 CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price ESTIMATED PRICE RANGE: Between $ 700,000 and $ 2,000,000 . INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE. This project is anticipated to be solicited Spring 2027. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
75%
Pre-SolicitationOpen
The purpose of this amendment is the following: 1. Quote due date for 1240LT27Q0019 has been amended to 12/1/2026 from original required submittal dates of 11/23/2026. 2.Consolidated questions and answers (C06_Questions and Clarifications) 3. Additional Document added Attachment 5 C06 416 Specifications Administrative parking lot repairs 4. Included Wage determination (Attachment 6 C06 Wage Determination C0202600002) This project involves the repair and resurfacing of three parking lots on the Arapaho and Roosevelt National Forest and Pawnee National Grassland including crack sealing, pavement patching, seal coating and re-striping. NAICS code 237310 - Highway, Street, and bridge Construction as a 100% SB Set Aside. Size standard $45 Million. PSC Code Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, Questions Due: November 6th, 2026 at 14:00 Eastern Standard Time(EST). Quotes Due:November 23rd, 2026 at 14:00 Eastern standard Time (EST). All questions and quotes relating to this Solicitation shall be submitted to Contract Specialist, Jordan Carlsen at Jordan.Carlsen@usda.gov by the deadlines stated above. Late quotes will be rejected.
75%
Solicitation12/01/2026

Additional Details

Solicitation Number

12363N23R4018

Archive Date

Feb 13, 2024

Office Address

Washington, DC, 202501138