GovChime
Notice ID: b68d8123cb2641509cd3c72d91b15910Combined Synopsis/SolicitationArchived

Prescott National Forest Senator Highway Road Reconditioning

Archived on May 28, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM PDT
Posted
May 7, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
Place of performance
Prescott, Arizona, 86303
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
12363N26Q4039
Notice ID
b68d8123cb2641509cd3c72d91b15910

Description

Amendment 1 published 5/7/2026

This is a combined synopsis/solicitation for commercial items prepared in accordance with the
format in FAR Part 12. This announcement constitutes the only solicitation. Offers are being
requested and a separate written solicitation will not be issued.
Solicitation number 12363N26Q4039 is issued as a Request for Quotation (RFQ) for Prescott
National Forest Road Reconditioning.
This acquisition is set-aside for small business concerns. The applicable North American Industry
Classification Standard Code is 237310 The small business size standard is $45 Million. This
acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation
which will be considered by the agency.
Offers are due May 13, 2026 at 11:00 am Mountain Standard Time to cynthia.horwitz@usda.gov

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (3)

  • Amendment 1 12363N26Q4039 Prescott NF Senator Hwy Road Reconditioning.pdf

    7.0 MBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Sol_12363N26Q4039_Amd_0001.pdf

    91 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • 12363N26Q4039 Prescott NF Senator Hwy Road Reconditioning.pdf

    7.0 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Prescott National Forest Senator Highway Road Reconditioning

    Notice e81f44873a794829abf7d918465f6fb0 on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    Prescott National Forest Senator Highway Road Reconditioning

    Notice b68d8123cb2641509cd3c72d91b15910 on SAM.gov

  3. 6
    Version 6Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    Prescott National Forest Senator Highway Road Reconditioning

    Notice 14d32acd319b4ce498ac705b04e64b4e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
PROJECT DESCRIPTION: Arizona Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement Typical Service Activities Road Maintenance service types of work will consist of routine work necessary to maintain the National Forest Road System in a functioning condition, providing safe public access and protecting the transportation facility investment and adjacent environmental resources. Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Work may also take place under or adjacent to the traveled way for resource protection, road stabilization, or to maintain traffic flow. Potential Performance Activities: Sign Maintenance; Work Area Management (traffic control); Bridge maintenance; Surface Maintenance (Blading, Compaction, Watering); Drainage Maintenance (Slide & Slough Removal, Ditch Cleaning, Culvert Inlet/Outlet Cleaning, Cross-drain installation and maintenance, Ditch and Catch Basin Buttressing), Shoulder maintenance, Fill slope Armoring, Hazard Removal (Danger Tree Falling, Rock Fall and Debris Removal, etc.); Vegetation Management (seeding, brushing requirements); Bridge, guardrail, and Cattle guard Maintenance; Road Closure Device Maintenance or Construction, Rock Crushing and Stockpiling; Placement of Spot Rock; Dust Abatement; Minor Flood Repair and Water Diversion, and Road Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream Restoration. Other complex systems may be within the scope to support road maintenance and restoration activities. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork. Typical Construction Activities Road construction types of work will consist of all construction activities normally associated with new road construction or reconstruction, but will be limited in scale, size, and complexity. Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes, or under the road prism for stream crossing improvements or road stabilization. Possible Performance Activities: Surveying/Staking of Work Activities, signing (traffic control and new sign installation); Clearing; Earthwork and realignment; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic Passage Work activities (small bridges or prefabricated structures, etc.); Aggregate Placement (base, surface, pit-run, riprap, etc.); Erosion Control (some erosion control such as seeding may be a service work activity; Shoulder, cut and fill slope reconstruction; Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing (some activities may be service work activity for supply/install), etc.); Cut/Fill Slope Stabilization; Aquatic Passage Construction; Cattle guard Installation; Installing Closure Devices (gates, earthen barriers, guardrails, etc.); Fence and Gate construction. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, Stream Restoration, and specialty projects may also be included, such as recreation facility enhancements (campground road/trail work, toilet installation, parking lot and boat launch repairs, etc.). Other complex systems may be within the scope to support road maintenance and restoration activities. Emergency road repairs may require snowplowing for access, but in general, snowplowing is not part of this contract. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork. PROJECT LOCATION: Projects shall covers the state of Arizona including the following forests; Apache-Sitgreaves, Coconino, Coronado, Kaibab, Prescott, and Tonto. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. A general vicinity map will be included with all call orders. Maps will also be available to assist in locating the individual roads and are available for purchase. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around January 15, 2023. Engineering point of contact is Armando De La Cruz, telephone: (505) 842-3859. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.
-Solicitation01/09/2023
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
-Solicitation11/17/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0003 is issued as a Request for Quotation (RFQ) for all equipment, labor, materials, tools, and other incidentals and execute all work necessary to perform the required road rehabilitation on the designated National Forest roads in accordance with the specifications, and bidder’s technical proposal which is incorporated by reference. The work consists of, but is not limited to, installing erosion and sedimentation controls (E&S Controls), traffic control, ditch work, repairing/replacing/placing new guide rail, removing existing culverts, installing new culverts, milling and overlaying existing asphalt, full depth replacement of asphalt, full depth asphalt spot repairs, asphalt shoulder repairs, line painting, constructing accessibility features, and placing and compacting road base and driving surface aggregate. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than October 19, 2026, at 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. Amendment 0001 has been executed to incorporate 100% Design and Quantity Sheet attachments, as well as extend the quote due date to 10/29/2026 @ 1:00 PM ET. Amendment 0002 has been executed to extend the quote due date to 11/05/2026 @ 1:00 PM ET to allow time for questions and answers to be posted. Amendment 0003 has been executed to extend the quote due date to 11/11/2026 @ 1:00 PM ET to allow time for questions and answers to be posted. Quotes shall be submitted electronically via e-mail to christopher.malley@usda.gov and pps.proposals@usda.gov and are due NLT Novenber 11, 2026, at 1:00 PM Eastern Time.
-Combined Synopsis11/11/2026
This project involves the repair and resurfacing of three parking lots on the Arapaho and Roosevelt National Forest and Pawnee National Grassland including crack sealing, pavement patching, seal coating and re-striping. NAICS code 237310 - Highway, Street, and bridge Construction as a 100% SB Set Aside. Size standard $45 Million. PSC Code Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, Questions Due: November 6th, 2026 at 14:00 Eastern Standard Time(EST). Quotes Due:November 23rd, 2026 at 14:00 Eastern standard Time (EST). All questions and quotes relating to this Solicitation shall be submitted to Contract Specialist, Jordan Carlsen at Jordan.Carlsen@usda.gov by the deadlines stated above. Late quotes will be rejected.
-Solicitation11/23/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445527Q0001 is issued as a Request for Quotation (RFQ) For the Removal and replacement of an existing concrete bridge with a 70 foot (overall length) single span concrete I-girder bridge with a concrete deck, concrete abutments, and H-pile foundations. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 Highway, Street, and Bridge Construction. The small business size standard is $45,000,000.00. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
-Combined Synopsis10/26/2026

Additional Details

Solicitation Number

12363N26Q4039

Archive Date

May 28, 2026

Office Address

Washington, DC, 202501138