GovChime
Notice ID: 1726315c043e4b8db4fdcd6c3c3f7fdbCombined Synopsis/SolicitationArchived

GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest

Archived on October 15, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM PDT
Posted
September 9, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA INTERMOUNTAIN 8
Place of performance
Tucson, Arizona
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
1240LT26Q0094
Notice ID
1726315c043e4b8db4fdcd6c3c3f7fdb

Description

This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. 

Solicitation number 1240LT26Q0094 is issued as a Request for Quotation (RFQ) for the Palisades Lagoon & Sprinkler System Replacement on the Coronado National Forest.

The Palisades Administrative Site Lagoon Liner and Effluent Sprinkler System Replacement project involves the maintenance and upgrade of the wastewater treatment system at the Palisades Administrative Complex, located on the Santa Catalina Ranger District of the Coronado National Forest, Pima County, Arizona, approximately 20 miles from Tucson. The project aims to replace the existing lagoon liner system and effluent sprinkler system, reconstruct access roads, and ensure uninterrupted wastewater services during construction through a temporary wastewater conveyance system.

This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237110. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside.   All responsible sources may submit a quotation which will be considered by the agency. 

9/3/26: Amendment 01 - Summary: Site visit information, questions/answers, and solicitation changes.

9/9/26: Amendment 02 posted - Summary: additional questions/answers, upload Engineering Report for the project for informational purposes only.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (9)

  • C05 Amend 02 EngineeringReport-Palisades.pdf

    6.6 MBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • C05 Amendment 02 Palisades Lagoon.pdf

    606 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • C05 Attachment 3 - Amended Specs.pdf

    2.4 MBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • C05 Amendment 01 Palisades.pdf

    364 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • C04 Attachment 4-Drawings Palisades.pdf

    4.0 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04 Attachment 5-DBA WD AZ20260006 051826.pdf

    2.6 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04 Attachment 3-Specs Palisades.pdf

    2.3 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04 Attachment 1-Solicitation Palisades.pdf

    998 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • C04 Attachment 2- SOI Palisades.xlsx

    17 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest

    Notice 837d5b350e0349c2bb9631226f17600e on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest

    Notice c01a61d7cc8a46c8bbf0856769d90803 on SAM.gov

  3. 4
    Version 4Combined Synopsis/SolicitationArchivedCurrent

    GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest

    Notice 1726315c043e4b8db4fdcd6c3c3f7fdb on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
72%
AwardedOpen
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 1240LU26Q0009 is issued as a Request for Quotation (RFQ) for the replacement of the water distribution system and wastewater collection system serving the Ninemile Ranger Station and the replacement of wastewater collection system serving the St. Regis Work Center and including 1 potential option item. North American Industry Classification (NAICS): 237110 (Water and Sewer Line and Related Structures Construction): Size Standard is $45.0 M. Set Aside: 100% small business set-aside. Bid Bond/Offer Guarantee (FAR 52.228-1): 20% required if quote/offer in excess of $150,000 Performance & Payment Bonds (FAR 52.228-15): Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award. Provide quote by: 12:00 PM, Mountain Time on February 27, 2026. Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9 Attn: Alisha Knaub E-mail: alisha.knaub@usda.gov For solicitation questions call Alisha Knaub at (406)438-2981 or email alisha.knaub@usda.gov. Amendment 001 - Posted 2/9/2026, SF30 (doc: 1240LU26Q0010Amendment001) attached to this notice. Amendment 002 - Posted 2/18/2026, SF30 (doc: 1240LU26Q0010Amendment002) attached to this notice Amendment 003 - Posted 2/24/2026, SF 30 (doc: 1240LU26Q0010Amendment003) attached to this notice. Amendment 004 - Posted 3/5/2026, SF 30 (doc: 1240LU26Q0010Amendment004) attached to this notice. Question and Answers - Update posted 3/5/2026 (doc:1240LU26Q0010Mar5QuestionsAnswers) attached to this notice.
72%
Combined Synopsis03/13/2026
67%
AwardedOpen
This requirement is for the cleaning, inspection, and repair of the Mud Mountain Dam Sewage Lagoon. A site visit will be offered on 17 November 2026, see attachment for information and registration. Please pay attention to: Section L, Section M, and FAR 52.228-13 in the solicitation.
66%
Combined Synopsis11/24/2026
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
66%
Combined Synopsis12/01/2026

Additional Details

Solicitation Number

1240LT26Q0094

Archive Date

Oct 15, 2026

Office Address

Ogden, UT, 844012310