GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
Archived on October 15, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM PDT
- Posted
- September 9, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, CSA INTERMOUNTAIN 8
- Place of performance
- Tucson, Arizona
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1240LT26Q0094
- Notice ID
- 1726315c043e4b8db4fdcd6c3c3f7fdb
Description
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.
Solicitation number 1240LT26Q0094 is issued as a Request for Quotation (RFQ) for the Palisades Lagoon & Sprinkler System Replacement on the Coronado National Forest.
The Palisades Administrative Site Lagoon Liner and Effluent Sprinkler System Replacement project involves the maintenance and upgrade of the wastewater treatment system at the Palisades Administrative Complex, located on the Santa Catalina Ranger District of the Coronado National Forest, Pima County, Arizona, approximately 20 miles from Tucson. The project aims to replace the existing lagoon liner system and effluent sprinkler system, reconstruct access roads, and ensure uninterrupted wastewater services during construction through a temporary wastewater conveyance system.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification System Code is 237110. The small business size standard is $45 Million. This acquisition is a total Small Business set-aside. All responsible sources may submit a quotation which will be considered by the agency.
9/3/26: Amendment 01 - Summary: Site visit information, questions/answers, and solicitation changes.
9/9/26: Amendment 02 posted - Summary: additional questions/answers, upload Engineering Report for the project for informational purposes only.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (9)
- Download
C05 Amend 02 EngineeringReport-Palisades.pdf
6.6 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
C05 Amendment 02 Palisades Lagoon.pdf
606 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
C05 Attachment 3 - Amended Specs.pdf
2.4 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
C05 Amendment 01 Palisades.pdf
364 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
C04 Attachment 4-Drawings Palisades.pdf
4.0 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 Attachment 5-DBA WD AZ20260006 051826.pdf
2.6 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 Attachment 3-Specs Palisades.pdf
2.3 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 Attachment 1-Solicitation Palisades.pdf
998 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04 Attachment 2- SOI Palisades.xlsx
17 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
- 2Version 2Combined Synopsis/SolicitationArchived
GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
- 4Version 4Combined Synopsis/SolicitationArchivedCurrent
GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
72% | Awarded | Open | |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 1240LU26Q0009 is issued as a Request for Quotation (RFQ) for the replacement of the water distribution system and wastewater collection system serving the Ninemile Ranger Station and the replacement of wastewater collection system serving the St. Regis Work Center and including 1 potential option item. North American Industry Classification (NAICS): 237110 (Water and Sewer Line and Related Structures Construction): Size Standard is $45.0 M. Set Aside: 100% small business set-aside. Bid Bond/Offer Guarantee (FAR 52.228-1): 20% required if quote/offer in excess of $150,000 Performance & Payment Bonds (FAR 52.228-15): Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter of credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award. Provide quote by: 12:00 PM, Mountain Time on February 27, 2026. Send quote to: Forest Service, Property and Procurement Services, Intermountain Zone, CSA #9 Attn: Alisha Knaub E-mail: alisha.knaub@usda.gov For solicitation questions call Alisha Knaub at (406)438-2981 or email alisha.knaub@usda.gov. Amendment 001 - Posted 2/9/2026, SF30 (doc: 1240LU26Q0010Amendment001) attached to this notice. Amendment 002 - Posted 2/18/2026, SF30 (doc: 1240LU26Q0010Amendment002) attached to this notice Amendment 003 - Posted 2/24/2026, SF 30 (doc: 1240LU26Q0010Amendment003) attached to this notice. Amendment 004 - Posted 3/5/2026, SF 30 (doc: 1240LU26Q0010Amendment004) attached to this notice. Question and Answers - Update posted 3/5/2026 (doc:1240LU26Q0010Mar5QuestionsAnswers) attached to this notice. | 72% | Combined Synopsis | 03/13/2026 |
67% | Awarded | Open | |
This requirement is for the cleaning, inspection, and repair of the Mud Mountain Dam Sewage Lagoon. A site visit will be offered on 17 November 2026, see attachment for information and registration. Please pay attention to: Section L, Section M, and FAR 52.228-13 in the solicitation. | 66% | Combined Synopsis | 11/24/2026 |
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services. | 66% | Combined Synopsis | 12/01/2026 |
Additional Details
Solicitation Number
1240LT26Q0094
Archive Date
Oct 15, 2026
Office Address
Ogden, UT, 844012310