GovChime
Notice ID: 737c4993197c4def5e138f7b225ef08eSolicitation

FOREST ROAD REPAIR & CONST IDIQ

Archived on March 26, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−07:00
Posted
February 12, 2019
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Apache-Sitgreaves National Forests
Place of performance
OVERGAARD, 85933
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Sep 25, 2026

Identifiers

Solicitation number
12817319R0007
Notice ID
737c4993197c4def5e138f7b225ef08e

Description

The USDA Forest Service, Apache-Sitgreaves National Forests, Springerville, Arizona, has a requirement for repair and or construction of Forest Roads composed of native or aggregate materials under Indefinite Delivery Indefinite Quantity (IDIQ) multiple award schedule (multiple year) contracts. The Government anticipates awarding a Firm Fixed-Price contracts under the Request For Proposals format using Best Value-Tradeoffs. Award of minimum of 2 contracts (up to maximum of 5) will be made under this solicitation using best value tradeoffs (price and technical). The location of the work will be on the Black Mesa Ranger District. The approximate performance period for the awarded contracts will be date of award through September 30 2022. All work under these contracts are subject to Davis-Bacon Wage Act. This procurement is a total Small Business Set-Aside. The NAICS code 237310 applies to this procurement for which the Small Business size standard is $36.5 million. In order to be eligible for award of a Federal contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov and have a DUNS number. The solicitation package and specifications will be available on this website on or before December 18, 2018. Offers or Responses to the solicitation may be sent electronically by email to: wabbott@fs.fed.us AMENDED TO EXTEND CLOSING DATE. The Closing Date for receipt of Offers or Responses shall be FEBRUARY 19, 2019, 4:00 p.m. Mountain Standard Time.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Warren L Abbott
Contracting Officer
Fax: 928-333-5966

Secondary Contact

Michelle Bahr
Contracting Specialist
Fax: 928-333-5966

Documents

No documents available.

Lifecycle

Solicitation:12817319R0007
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationDec 3, 2018

    FOREST ROAD REPAIR & CONST IDIQ

    Notice 6a660019e2a402fbb8c5dba68e12ab13 on SAM.gov

  2. SolicitationCurrentFeb 12, 2019

    FOREST ROAD REPAIR & CONST IDIQ

    Notice 737c4993197c4def5e138f7b225ef08e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
PROJECT DESCRIPTION: Arizona Forest Engineering and Road Maintenance (FERM) Blanket Purchase Agreement Typical Service Activities Road Maintenance service types of work will consist of routine work necessary to maintain the National Forest Road System in a functioning condition, providing safe public access and protecting the transportation facility investment and adjacent environmental resources. Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes. Work may also take place under or adjacent to the traveled way for resource protection, road stabilization, or to maintain traffic flow. Potential Performance Activities: Sign Maintenance; Work Area Management (traffic control); Bridge maintenance; Surface Maintenance (Blading, Compaction, Watering); Drainage Maintenance (Slide & Slough Removal, Ditch Cleaning, Culvert Inlet/Outlet Cleaning, Cross-drain installation and maintenance, Ditch and Catch Basin Buttressing), Shoulder maintenance, Fill slope Armoring, Hazard Removal (Danger Tree Falling, Rock Fall and Debris Removal, etc.); Vegetation Management (seeding, brushing requirements); Bridge, guardrail, and Cattle guard Maintenance; Road Closure Device Maintenance or Construction, Rock Crushing and Stockpiling; Placement of Spot Rock; Dust Abatement; Minor Flood Repair and Water Diversion, and Road Demolition. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, and Stream Restoration. Other complex systems may be within the scope to support road maintenance and restoration activities. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork. Typical Construction Activities Road construction types of work will consist of all construction activities normally associated with new road construction or reconstruction, but will be limited in scale, size, and complexity. Work is generally confined to within the limits of the existing traveled way and adjacent ditches, shoulders and cut/fill slopes, or under the road prism for stream crossing improvements or road stabilization. Possible Performance Activities: Surveying/Staking of Work Activities, signing (traffic control and new sign installation); Clearing; Earthwork and realignment; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic Passage Work activities (small bridges or prefabricated structures, etc.); Aggregate Placement (base, surface, pit-run, riprap, etc.); Erosion Control (some erosion control such as seeding may be a service work activity; Shoulder, cut and fill slope reconstruction; Asphalt Placement, Asphalt Restoration (grinding, overlays, pothole patching, skin patching, crack sealing, chip sealing (some activities may be service work activity for supply/install), etc.); Cut/Fill Slope Stabilization; Aquatic Passage Construction; Cattle guard Installation; Installing Closure Devices (gates, earthen barriers, guardrails, etc.); Fence and Gate construction. Burned Area Emergency Response (BAER), Fire Suppression Rehabilitation, Stream Restoration, and specialty projects may also be included, such as recreation facility enhancements (campground road/trail work, toilet installation, parking lot and boat launch repairs, etc.). Other complex systems may be within the scope to support road maintenance and restoration activities. Emergency road repairs may require snowplowing for access, but in general, snowplowing is not part of this contract. Log out and mobilization costs are incidental to ordered work unless otherwise specified in the call order. This also includes trailheads, campgrounds, and other facility related roadwork. PROJECT LOCATION: Projects shall covers the state of Arizona including the following forests; Apache-Sitgreaves, Coconino, Coronado, Kaibab, Prescott, and Tonto. The terrain varies and can have moderate hills on some areas and steep grades in others. Soil conditions vary as well, from soft and sandy to compacted and rocky. A general vicinity map will be included with all call orders. Maps will also be available to assist in locating the individual roads and are available for purchase. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around January 15, 2023. Engineering point of contact is Armando De La Cruz, telephone: (505) 842-3859. NAICS 237310 with size standard $39.5 mil. This project is set aside 100% for small business.
-Solicitation01/09/2023
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
-Solicitation11/17/2026
Cripple Creek Veg Management Roads Reconstruction CHUGACH NF This project includes subgrade construction, unsuitable material excavation and endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing and grubbing,disposal site contouring, switchback realignment, waterbar construction and reconstruction,and all other work required to get these roads to a condition to place aggregate surface materials. Option item is road surfacing. Questions Due:11/20 Proposals due: 12/04/2026 1700 PT
-Combined Synopsis12/04/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0003 is issued as a Request for Quotation (RFQ) for all equipment, labor, materials, tools, and other incidentals and execute all work necessary to perform the required road rehabilitation on the designated National Forest roads in accordance with the specifications, and bidder’s technical proposal which is incorporated by reference. The work consists of, but is not limited to, installing erosion and sedimentation controls (E&S Controls), traffic control, ditch work, repairing/replacing/placing new guide rail, removing existing culverts, installing new culverts, milling and overlaying existing asphalt, full depth replacement of asphalt, full depth asphalt spot repairs, asphalt shoulder repairs, line painting, constructing accessibility features, and placing and compacting road base and driving surface aggregate. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than October 19, 2026, at 1:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email. Amendment 0001 has been executed to incorporate 100% Design and Quantity Sheet attachments, as well as extend the quote due date to 10/29/2026 @ 1:00 PM ET. Amendment 0002 has been executed to extend the quote due date to 11/05/2026 @ 1:00 PM ET to allow time for questions and answers to be posted. Amendment 0003 has been executed to extend the quote due date to 11/11/2026 @ 1:00 PM ET to allow time for questions and answers to be posted. Quotes shall be submitted electronically via e-mail to christopher.malley@usda.gov and pps.proposals@usda.gov and are due NLT Novenber 11, 2026, at 1:00 PM Eastern Time.
-Combined Synopsis11/11/2026
-AwardedOpen

Additional Details

Solicitation Number

12817319R0007

Archive Date

Mar 26, 2019

Office Address

SPRINGERVILLE, AZ, 85938