Notice ID: d49ef250bfcc40a896c7186561d1d593Combined Synopsis/SolicitationArchived
RM Young Wind Monitors and Shields Spare Parts
Archived on August 25, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM EDT
- Posted
- July 28, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of CommerceNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
Notice details
- Office
- DEPT OF COMMERCE NOAA
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 1305M226Q0226
- Notice ID
- d49ef250bfcc40a896c7186561d1d593
Description
RM Young Wind Monitors and Shields spare parts
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
Sol_1305M226Q0226.pdf
501 KBAdded in Combined Synopsis/Solicitation version 3Posted
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
RM Young Wind Monitors and Shields Spare Parts
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The National Oceanic and Atmospheric Administration’s (NOAA) Acquisition and Grants Office, Eastern Acquisition Division-Kansas City intends to negotiate and award a purchase order, on a sole source basis, under authority of RFO FAR 6.103-1, with RM Young Company for Replacement TAO Wind Monitors (P/N 05103-1) to be delivered to National Data Buoy Center at Stennis Space Center, MS. The sole source determination is based on NOAA’s only one source is capable rationale. The RM Young propeller wind monitors technology uses magnetic induction for measuring wind speed which requires no energy input. Essentially you get the wind speed for free with respect to power requirements. Further, the directional portion of the sensor only requires 0.6 mW of power. That is 100 times less power requirement than an ultrasonic anemometer. This low power wind measurement is imperative in a battery-operated remote buoy station. The propeller anemometer also provides for the measurement of wind gusts over 100 m/s where no ultrasonic anemometer technology can currently measure in that range. The NDBC helped develop the R.M. Young propeller anemometer which is now considered the industry standard. No other propeller anemometer available has the reliability of the R.M. Young propeller anemometer. Hence, the R.M. Young model 05103-1 anemometer was selected as the anemometer for the TAO refresh system in 2010 and the TAP Recapitalization effort in 2023. The NDBC now has a complete TAO network populated with these 015103-1 wind monitors and this procurement replaces those units lost at sea, damaged beyond repair, or have reached their end of life during fiscal years 2025 and 2026. The RM Young 05103-1 is provided with the cable and connector required to match current TAO cabling. The 05103-1 also provides a pulse output for wind speed as a result of the magnetic induction technique for the measurement. The selection of another manufacturer’s wind sensors could result in $100K of engineering efforts to rework the hardware and firmware of the TAO system and the NDBC wind tunnel testing equipment to accept different connections and output formats. Further, due to TAOs climate study the new sensor would need to be tested side-by-side the RM Young 05103-1 for a year to develop the transition equation to ensure there are no step or abrupt changes in the general wind speed and direction trends. This year long side-by-side testing could cost more than $100k as it would require a co-located buoy at several locations. This pre-solicitation notice is not a request for competitive proposals and no solicitation package is available. However, firms that believe they can fully meet the government’s requirements may submit substantiating documentation or a request for additional information in writing to Abigail Green at Abigail.green@noaa.gov within 15 days after publication of this pre-solicitation notice. Such requests and documentation will be evaluated solely for the purpose of determining whether or not to conduct this procurement on a competitive basis. A determination by the government not to conduct a competitive procurement, based upon responses to this notice, is solely within the discretion of the government. Oral communications are not acceptable in response to this pre-solicitation notice. | 68% | Pre-Solicitation | 12/04/2026 |
MINICAMS PARTS / Submission Requirements and Technical Compliance - Submission Method: Only bids submitted through the official solicitation portal will be accepted. Emailed submissions will not be considered.Brand Name or Equal: This solicitation is brand name or equal. If quoting an equal product, the bidder must demonstrate that the product meets or exceeds all salient physical, functional, or performance characteristics listed in the description.Mandatory Documentation: A completed Buy American form is required. Bids submitted without a completed form may be deemed non-responsive and rejected.Shipping and Invoicing: Prices must include all shipping, packaging, and inspection charges. A single shipment and invoice are required. Multiple shipments require prior written approval from the WDTC S2P2 Point of Contact (POC). | 67% | Combined Synopsis | 11/16/2026 |
MINICAM Parts - Submission Requirements and Technical Compliance - Submission Method: Only bids submitted through the official solicitation portal will be accepted. Emailed submissions will not be considered. Brand Name or Equal: This solicitation is brand name or equal. If quoting an equal product, the bidder must demonstrate that the product meets or exceeds all salient physical, functional, or performance characteristics listed in the description. Mandatory Documentation: A completed Buy American form is required. Bids submitted without a completed form may be deemed non-responsive and rejected. Shipping and Invoicing: Prices must include all shipping, packaging, and inspection charges. A single shipment and invoice are required. Multiple shipments require prior written approval from the POC. | 67% | Combined Synopsis | 04/14/2026 |
The requirement is for multiple line items. Please see attached combined synopsis. | 64% | Combined Synopsis | 11/19/2026 |
This is a Brand Name requirement for APCRBC140 replacement battery cartridges from APC by Schneider Electric. See the attached Specifications, Brand name justification, and RFQ document for full details of the requirement. ALL OFFERORS (i.e. the vendor that will receive the award payment) MUST PROVIDE PROOF OF PRICING FROM THE MANUFACTURER, AND CONFIRM AUTHORIZATION (from the original equipment manuafacturer)TO RESELL THE ITEMS LISTED IN THE STATEMENT OF WORK TO BE CONSIDERED FOR AWARD. Partial quotes will not be accepted. All correspondence must reference the notice ID in the subject line to ensure visibility. | 61% | Combined Synopsis | 11/09/2026 |
Additional Details
Solicitation Number
1305M226Q0226
Archive Date
Aug 25, 2026
Office Address
NORFOLK, VA, 23510